ILBI CONST SUPPLY is listed as a company organization in Philippine public procurement records on this site, with 26 linked DPWH project(s) totaling about ₱672,266,329.03. Recorded delivery grade B (pattern summary from public DPWH/PhilGEPS links — not a finding of wrongdoing).
ILBI CONST SUPPLY
BRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 26
- Total value
- ₱672,266,329.03
- Published flags
- 0
- Region
- South Cotabato 2nd DEO · Region XII
Public Record Grade
A transparent, data-derived summary of reported public records for ILBI CONST SUPPLY — not an accusation or finding of wrongdoing.
Score: 83.10 / 100 · Projects in sample: 26 · As of Oct 22, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 77.6/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 77.6
- lateCompletedProjects
- 1
- onTimeCompletedProjects
- 22
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 26
- pastTargetOngoingProjects
- 3
- undatedCompletedProjectsExcluded
- 0
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 26
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 26
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 26
- componentScore
- —
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 26
- componentScore
- —
- linkedObservations
- 0
Computed automatically from public DPWH, PhilGEPS and COA records, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
23 geotagged project(s) — Open full map
- CONSTRUCTION OF KABACAN RIVER FLOOD CONTROL PROJECT (RUBBER TESTING CENTER), STA. 0+000 - STA. 0+648, BARANGAY POBLACION, KABACAN, COTABATO25M00005 · ₱143,638,788.07 · mapped
- CONSTRUCTION OF CONCRETE REVETMENT, BUAYAN RIVER, STA. 0+177.68 - STA. 0+760.68, BARANGAY BUAYAN, GENERAL SANTOS CITY, SOUTH COTABATO25M00180 · ₱106,563,744.86 · mapped
- CONSTRUCTION OF FLOOD CONTROL DIKE ALONG KABACAN RIVER (PHASE III), BARANGAY ALEGRIA, STA.44+611.63-STA. 45+152, PRES. ROXAS, COTABATO24M00070 · ₱95,521,390.47 · mapped
- ROAD WIDENING-COTABATO-MARBEL RD (S00276MN)-K1712+152-K1713+19022MG0025 · ₱62,723,321.47 · mapped
- ROAD WIDENING-SURALLAH-LAKE SEBU-MAITUM RD-K1749+078-K1750+28524MG0099 · ₱51,150,058.82 · mapped
- CLUSTER VI-A.OFF CARRIAGEWAY IMPROVEMENT OF SHOULDER PAVING-COTABATO-MARBEL RD-K1729+586 K1731+371.30, SOUTH COTABATO B.OFF-CARRIAGEWAY IMPROVEMENT: CONSTRUCTION OF BIKE LANES-COTABATO-MARBEL RD-K1731+080-K1731+52321MG0098 · ₱39,560,244.27 · mapped
- CLUSTER II-CONSTRUCTION OF CONCRETE ROAD A. JCT. SURALLAH-LAKE SEBU ROAD LEADING TO NV VOGT SOLAR POWER PLANT, BRGY. CENTRALA, SURALLAH, SOUTH COTABATO B. POBLACION T'BOLI TO BRGY. LACONON LEADING TO BAKNEB RIVER CAVE ROAD, BRGY. LACONON, T'BOLI, SOUTH CO21MG0151 · ₱34,014,266.94 · mapped
- ROAD WIDENING-ALONG COTABATO-MARBEL RD-(S00276MN) K1713+722-K1715+03520MG0071 · ₱32,486,417.21 · mapped
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS: JCT. SURALLAH-LAKE SEBU ROAD LEADING TO NV VOGT SOLAR POWER PLANT, BRGY. CENTRALA, SURALLAH, SOUTH COTABATO18MG0070 · ₱18,609,599.05 · mapped
- CONSTRUCTION OF CONCRETE ROAD-JCT. SURALLAH-LAKE SEBU ROAD LEADING TO NV VOGT SOLAR POWER PLANT, BRGY. CENTRALA, SURALLAH, SOUTH COTABATO20MG0042 · ₱14,659,628.01 · mapped
- CONCRETING OF SITIO TUBURAN, BRGY. SAN MIGUEL FMR, BRGY. SAN MIGUEL, NORALA, SOUTH COTABATO22MG0067 · ₱11,832,326.47 · mapped
- CONSTRUCTION OF CONCRETE ROAD-JCT. SURALLAH-LAKE SEBU ROAD LEADING TO NV VOGT SOLAR POWER PLANT, BRGY. CENTRALA, SURALLAH, SOUTH COTABATO19MG0036 · ₱11,723,026.84 · mapped
- CONCRETING OF SAN JOSE FMR (WITH BOX CULVERT), BRGY. SAN JOSE, BANGA, SOUTH COTABATO17MG0100 · ₱9,458,525.40
- CONCRETING OF SITIO PAG-ASA TO PUROK ROSAS, DAJAY FMR BRGY. DAJAY, SURALLAH, SOUTH COTABATO17MG0099 · ₱9,452,189.22
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (HEALTH CENTER), BARANGAY PALIAN, TUPI, SOUTH COTABATO24M00137 · ₱4,943,518.59 · mapped
- CONSTRUCTION OF 1 UNIT-1STY 3CL AT SEVEN LAKES ES, LAKE SEBU, SOUTH COTABATO17MG0122 · ₱4,293,555.84 · mapped
- CONSTRUCTION OF 1 UNIT-1STY 2CL AT PULO SUBONG IS, LAKE SEBU, SOUTH COTABATO17MG0121 · ₱2,991,028.19 · mapped
- CONSTRUCTION OF LOCAL ROADS, SITIO DAMASCO, CENTRALA, SURALLAH, SOUTH COTABATO17MG0053 · ₱2,855,509.39
- CONSTRUCTION OF GYM, BRGY. DENLAG, LAKE SEBU, SOUTH COTABATO18MG0023 · ₱2,470,007.27 · mapped
- CONSTRUCTION OF NEW BARANGAY GYM, BRGY. SALACAFE, T'BOLI, SOUTH COTABATO18MG0028 · ₱2,469,998.07 · mapped
- CONSTRUCTION OF NEW BARANGAY GYM, BRGY. MONGOKAYO, T'BOLI, SOUTH COTABATO18MG0013 · ₱2,469,992.67 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (NEW GYM) YELLOW BELL, BARANGAY STA. CRUZ, KORONADAL CITY, SOUTH COTABATO18MG0058 · ₱2,443,590.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (NEW BARANGAY HALL), BRGY. CENTRALA, SURALLAH, SOUTH COTABATO19MG0021 · ₱1,976,566.65 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (MINI GYM), PUROK MARAÑON, BRGY. ZONE III, KORONADAL CITY, SOUTH COTABATO19MG0055 · ₱1,575,855.26 · mapped
- REPAIR/RENOVATION/EXPANSION OF TALISAY BHS WITH BIRTHING FACILITY, BRGY. TALISAY, LAKE SEBU, SOUTH COTABATO18MG0224 · ₱1,191,590.00 · mapped
- REPAIR/RENOVATION/EXPANSION OF KLUBI BHS WITH BIRTHING FACILITY, BRGY. KLUBI, LAKE SEBU, SOUTH COTABATO18MG0223 · ₱1,191,590.00 · mapped