CONSTRUCTION OF FLOOD CONTROL STRUCTURE-CONCRETE REVETMENT ALONG PADADA-MAINIT RIVER (LAPULABAO-MASALAM BRIDGE DOWNSTREAM SECTION) HAGONOY, DAVAO DEL SUR
CONSTRUCTION OF FLOOD CONTROL STRUCTURE-CONCRETE REVETMENT ALONG PADADA-MAINIT RIVER (LAPULABAO-MASALAM BRIDGE DOWNSTREAM SECTION) HAGONOY, DAVAO DEL SUR is a DPWH-tracked public work in Davao del Sur DEO, Region XI. Reported contract value: ₱120,017,681.56. Status: Past target date (DPWH On-Going). Contractor on record: LEDCORE CONST AND DEVELOPMENT CORP. Figures trace to dpwh.
Total Contract Cost

