CONSTRUCTION OF FLOOD CONTROL MITIGATION STRUCTURE (EARTH DIKE) ALONG TAGUM LIBUGANON RIVER BASIN, CARMEN - B.E. JUALI, STO. TOMAS, DAVAO DEL NORTE, SECTION 1, DAVAO DEL NORTE
CONSTRUCTION OF FLOOD CONTROL MITIGATION STRUCTURE (EARTH DIKE) ALONG TAGUM LIBUGANON RIVER BASIN, CARMEN - B.E. JUALI, STO. TOMAS, DAVAO DEL NORTE, SECTION 1, DAVAO DEL NORTE is a DPWH-tracked public work in Davao del Norte 2nd DEO, Region XI. Reported contract value: ₱97,218,009.70. Status: Past target date (DPWH On-Going). Contractor on record: MONOLITHIC CONST. Figures trace to dpwh.
Total Contract Cost
