CONSTRUCTION OF FLOOD CONTROL STRUCTURE-CONCRETE REVETMENT AT MATANAO RIVER ALONG MATANAO NHS LEFT SIDE DOWNSTREAM SECTION PHASE I, MATANAO, DAVAO DEL SUR
CONSTRUCTION OF FLOOD CONTROL STRUCTURE-CONCRETE REVETMENT AT MATANAO RIVER ALONG MATANAO NHS LEFT SIDE DOWNSTREAM SECTION PHASE I, MATANAO, DAVAO DEL SUR is a DPWH-tracked public work in Davao del Sur DEO, Region XI. Reported contract value: ₱122,810,170.04. Status: Past target date (DPWH On-Going). Contractor on record: TKS BUILDERS. Figures trace to dpwh.