LLABAN CONST & SUPPLY FORMERLY: LLABAN CON is listed as a company organization in Philippine public procurement records on this site, with 58 linked DPWH project(s) totaling about ₱3,069,379,427.11. Recorded delivery grade B (pattern summary from public DPWH/PhilGEPS links — not a finding of wrongdoing).
LLABAN CONST & SUPPLY FORMERLY: LLABAN CON
BRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 58
- Total value
- ₱3,069,379,427.11
- Published flags
- 10
- Region
- COTABATO (NORTH COTABATO) · Region XII
Public Record Grade
A transparent, data-derived summary of reported public records for LLABAN CONST & SUPPLY FORMERLY: LLABAN CON — not an accusation or finding of wrongdoing.
Score: 81.70 / 100 · Projects in sample: 58 · As of Oct 22, 2026 UTC
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 66.2/100 · Weight: 47%
- graceDays
- 30
- componentScore
- 66.2
- lateCompletedProjects
- 16
- onTimeCompletedProjects
- 35
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 58
- pastTargetOngoingProjects
- 7
- undatedCompletedProjectsExcluded
- 0
- Termination rate
Component score: 100/100 · Weight: 21%
- totalProjects
- 58
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 21%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 58
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
Component score: 97.9/100 · Weight: 11%
- projects
- 58
- componentScore
- 97.9
- flagsPerProject
- 0.07
- publishedV2Flags
- 4
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 58
- componentScore
- —
- linkedObservations
- 0
Computed automatically from public DPWH, PhilGEPS and COA records, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
49 geotagged project(s) — Open full map
- ROAD WIDENING OF DAVAO-COTABATO ROAD (JCT. DIGOS-COTABATO SECTION) K1702+397.9-K1703+456 (CHAINAGE 36710.9 TO CHAINAGE 37772), K1703+669-K1703+743 (CHAINAGE 37985-CHAINAGE 38059) K1705+365-K1705+615 (CHAINAGE 39693 - CHAINAGE 39943) K1708+576-K1710+680 (C17M00043 · ₱143,357,670.13
- MIDSAYAP - LIBUNGAN BYPASS ROAD, COTABATO25MD0029 · ₱140,407,031.28 · mapped
- CONSTRUCTION OF FLOOD CONTROL PROJECT, RIO GRANDE DE MINDANAO, DOWNSTREAM OF DATU SAHID PIANG BRIDGE, MIDSAYAP, COTABATO25MD0035 · ₱121,323,386.89 · mapped
- MIDSAYAP - LIBUNGAN BYPASS ROAD, COTABATO24MD0049 · ₱106,144,990.13 · mapped
- CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - BANISILAN-GUILING-ALAMADA-LIBUNGAN RD, K1673+640.00 - K1673+820, ALAMADA, NORTH COTABATO23M00001 · ₱101,325,000.00 · mapped
- Construction of Flood Control along Kabacan River at Purok Rico, Brgy. Poblacion, Magpet, Cotabato22MC0063 · ₱96,500,000.00 · mapped
- Construction of Flood Control Structure along Libungan River (Barangay Gumaga Section-Phase IV), Barangay Gumaga, Libungan, North Cotabato24MD0036 · ₱96,017,500.00 · mapped
- SITIO LIMATONG-CAMPO 1 AND KAGUIRINGAN FALLS LEADING TO HIKING JUMP-OFF SITE TO MT. AGKIR-AGKIR, NORTH COTABATO, PIGCAWAYAN, COTABATO23MD0045 · ₱95,535,000.00 · mapped
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BALOGO RIVER, UPSTREAM OF BALOGO BRIDGE, BARANGAY BALOGO, PIGCAWAYAN, COTABATO25MD0031 · ₱94,674,928.86 · mapped
- CONSTRUCTION OF BRIDGE CONNECTING BRGY. CAMANSI TO BRGY. PACAO, ALAMADA, NORTH COTABATO22MD0085 · ₱86,848,227.66 · mapped
- ROAD WIDENING - DAVAO-COTABATO RD (JCT DIGOS-COTABATO SECT), VILLARICA, MIDSAYAP, NORTH COTABATO25MD0050 · ₱84,232,341.00 · mapped
- ROAD WIDENING - PRIMARY ROAD - ALONG DAVAO-COTABATO RD (JCT DIGOS-COTABATO SECT.), PIKIT, COTABATO24MD0038 · ₱78,572,978.41 · mapped
- Construction of Tunggol Protection Dike, Phase 3, Datu Montawal, Maguindanao23M00121 · ₱74,329,125.00 · mapped
- Construction of Malasila River Flood Control, Sta. 39 + 600 - Sta. 40 + 770, Sta. 40 + 170 - Sta. 40 + 770, Barangay Bulacanon, Makilala, North Cotabato, Package 123M00019 · ₱72,374,996.63 · mapped
- ROAD WIDENING - PACO-ROXAS-ARAKAN VALLEY-JCT DAVAO-BUKIDNON RD - K1634 + 916 - K1636 + 870, PRES. ROXAS, NORTH COTABATO22MC0019 · ₱71,328,940.00 · mapped
- REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - MAGPET-NOWA-DOROLUMAN-GREENFIELD RD - K1657 + 880-K1658+260, ARAKAN, NORTH COTABATO (RE-PUBLISHED)22MC0091 · ₱69,480,000.00 · mapped
- CONSTRUCTION OF RIVER BANK PROTECTION/FLOOD CONTROL, BRGY. BIWANG, BAGUMBAYAN, SULTAN KUDARAT21MH0025 · ₱67,549,703.32 · mapped
- ROAD WIDENING ALONG MIDSAYAP-MAKAR ROAD, BRGY. POBLACION, MIDSAYAP, NORTH COTABATO20MD0006 · ₱66,222,160.00 · mapped
- CONSTRUCTION OF BRIDGE APPROACHES AT RARADANGAN TO MACABASA, ALAMADA, NORTH COTABATO25MD0034 · ₱56,076,059.97 · mapped
- REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE-PRIMARY ROAD-ALONG DAVAO-COTABATO RD. (JCT. DIGOS-COTABATO SECT.), PIGCAWAYAN AND ALEOSAN, NORTH COTABATO25MD0033 · ₱52,605,780.95 · mapped
- Construction of Malasila River Flood Control L/S , Brgy. Sta. Filomina and Brgy. Poblacion Section, Makilala, North Cotabato21MC0073 · ₱49,000,000.00 · mapped
- Construction of Flood Control Dike along Kabacan River L/S, Barangay Binay, Magpet, North Cotabato23MC0023 · ₱49,000,000.00 · mapped
- Construction of Revetment along Kabacan River (Alegria Section) Brgy. Alegria, President Roxas, North Cotabato22MC0016 · ₱48,999,217.01 · mapped
- ROAD WIDENING ALONG KIDAPAWAN-MAGPET-PANGAOAN RD - K1622 + 351 - K1624 + 221, KIDAPAWAN CITY, NORTH COTABATO22MC0017 · ₱48,998,960.00 · mapped
- LIBUNGAN FLOOD CONTROL (GUMAGA SECTION-PHASE III) ALONG LIBUNGAN RIVER, GUMAGA, LIBUNGAN, NORTH COTABATO21MD0026 · ₱48,913,717.30 · mapped
- Construction of Flood Control Dike along Bulatukan River, Sta. 62+270 - Sta. 62+610 R/S, Barangay New Bulatukan, Makilala, Cotabato24MC0035 · ₱48,755,000.00 · mapped
- Construction of Revetment along Malasila River, Sta. 41+533 - Sta. 42 + 333 R/S, Barangay Sta. Filomina, Makilala, Cotabato24MC0052 · ₱48,755,000.00 · mapped
- Construction of Flood Control Structure along Balogo River (Anick Section), Barangay Anick, Pigkawayan, North Cotabato24MD0035 · ₱48,755,000.00 · mapped
- Construction of Revetment along Malasila River, Sta. 43+980 - Sta. 44+780 L/S, Barangay Sta. Filomina, Makilala, Cotabato24MC0053 · ₱48,755,000.00 · mapped
- Construction of Flood Control Dike along Bulatukan River, Sta. 61+930 - Sta. 62+270 R/S, Barangay New Bulatukan, Makilala, Cotabato24MC0034 · ₱48,755,000.00 · mapped
- Construction of Revetment along Malasila River, Sta. 36+540 - Sta. 37+340 L/S, Barangay Dagupan, Makilala, Cotabato24MC0050 · ₱48,755,000.00 · mapped
- CONSTRUCTION OF FLOOD CONTROL DIKE ALONG BULATUKAN RIVER STA. 63+370 - STA. 63+710 R/S, BARANGAY NEW BULATUKAN, MAKILALA, COTABATO24MC0033 · ₱48,755,000.00 · mapped
- Construction of Flood Control Dike along Bulatukan River Sta. 63+370 - Sta. 63+710 L/S, Barangay Kisante, Makilala, Cotabato24MC0032 · ₱48,753,175.91 · mapped
- Construction of Malasila River Flood Control L/S, Brgy. Bulacanon, Makilala, North Cotabato22MC0042 · ₱48,509,973.26 · mapped
- ROAD WIDENING - BANISILAN-GUILING-ALAMADA-LIBUNGAN RD, CAMANSI, ALAMADA, NORTH COTABATO23MD0051 · ₱48,509,530.54 · mapped
- Construction of Pulangi Bank Protection, Right Bank of Tunggol Floodway, Package A-Phase 2, Pagalungan, Maguindanao23M00119 · ₱47,646,875.00 · mapped
- Construction of Pulangi Bank Protection, Right Bank of Tunggol Floodway, Package B-Phase 4, Datu Montawal, Maguindanao23M00120 · ₱47,646,875.00 · mapped
- CONSTRUCTION OF FLOOD CONTROL PROJECT, LIBUNGAN RIVER, (GUMAGASECTION), GUMAGA, LIBUNGAN, COTABATO25MD0032 · ₱46,802,494.13 · mapped
- CONSTRUCTION OF FLOOD CONTROL (ALA RIVER BASIN) ESPERANZA, SULTAN KUDARAT19MH0085 · ₱46,424,524.58 · mapped
- Construction of Meocan CIS Prop Protection Dike at Arakan River, Arakan, Cotabato24MC0037 · ₱34,299,999.54 · mapped
- CONSTRUCTION OF LIBUNGAN FLOOD CONTROL (NALIN SECTION - PHASE II), NALIN, MIDSAYAP, COTABATO20MD0011 · ₱33,084,788.46 · mapped
- WIDENING OF PERMANENT BRIDGES, BULANAN BR. 1(B00309MN) INCLUDING ROW - TO MORE THAN 2 LANES ALONG DV17MD0057 · ₱32,782,442.18 · mapped
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG TINANAN RIVER, PACKAGE 4, BARANGAY MALIBATUAN, ARAKAN, COTABATO25MC0046 · ₱31,507,516.95 · mapped
- Construction of Revetment along New Cebu River, President Roxas, North Cotabato23MC0020 · ₱29,400,000.00 · mapped
- Rehabilitation of Flood Control Structure along Libungan River (Upstream of Libungan Bridge), Poblacion, Libungan, Cotabato22MD0052 · ₱29,400,000.00 · mapped
- CONST. OF LIBUNGAN FLOOD CONTROL PHASE III LOPE QUAIL ES SECTION, LIBUNGAN, NORTH COTABATO18MD0086 · ₱27,944,947.80 · mapped
- Construction of Riverbank Protection (Revetment) along Butalo River Phase I, Datu Salibo, Maguindanao21M00115 · ₱23,995,000.03 · mapped
- Construction of Riverbank Protection (Revetment) Phase I, Datu Piang, Maguindanao21M00114 · ₱23,995,000.00 · mapped
- CONST. OF LIBUNGAN FLOOD CONTROL PROJECT (DOWNSTREAM OF LIBUNGAN BRIDGE FC II), LEFT BANK, LIBUNGAN, NORTH COTABATO18MD0085 · ₱23,311,840.10 · mapped
- WIDENING OF PERMANENT BRIDGES, MANUANGAN BR (B00316MN) INCLUDING ROW-TO MORE THAN 2 LANES ALONG DVO-17MD0051 · ₱19,555,203.59 · mapped
