Construction of Flood Mitigation Structure24MD0036

Construction of Flood Control Structure along Libungan River (Barangay Gumaga Section-Phase IV), Barangay Gumaga, Libungan, North Cotabato

Construction of Flood Control Structure along Libungan River (Barangay Gumaga Section-Phase IV), Barangay Gumaga, Libungan, North Cotabato is a DPWH-tracked public work in LIBUNGAN (COTABATO (NORTH COTABATO)), COTABATO (NORTH COTABATO), Region XII. Reported contract value: ₱96,017,500.00. Status: Reported complete (DPWH). Contractor on record: LLABAN CONST & SUPPLY FORMERLY: LLABAN CON. Figures trace to sumbong.

LIBUNGAN (COTABATO (NORTH COTABATO)), COTABATO (NORTH COTABATO), Region XII
Region: Region XII

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2024 · ₱50,000

    Probable match · score 0.91

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROXII-24-0000581 · ₱2,245,275

    Possible match · score 0.60

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 24MD0036 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2023-12-12 → 2025-10-02

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

Outside mapped flood-hazard zones · Cotabato

Based on the coordinates published with the DPWH record and NOAH file Cotabato.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: Construction of Flood Control Structure along Libungan River (Barangay Gumaga Section-Phase IV), Barangay Gumaga, Libungan, North Cotabato

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 91%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure along Balogo River ( Anick Section ) , Barangay Anick, Pigkawayan, North Cotabato
GAA fiscal year
FY2024
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROXII-24-0000581

₱2,245,275.00 · FY2024

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-ROXII-24-0008958

₱1,757,000.00 · FY2024

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-ROXII-24-0000585

₱204,750.00 · FY2024

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-ROXII-24-0007866

₱162,000.00 · FY2024

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

58 projects · ₱3.1B total · 10 flags

4. Implementation

Contract Amount

₱96,017,500.00

Progress

Reported complete (DPWH)

Start Date

February 19, 2024

Target End

November 22, 2024

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region XII (SOCCSKSARGEN)CotabatoMidsayapNalin
Storms whose wind field reached it
Jelawat 2023
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.