CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT TAGOLOAN RIVER, PACKAGE 13, MISAMIS ORIENTAL
CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT TAGOLOAN RIVER, PACKAGE 13, MISAMIS ORIENTAL is a DPWH-tracked public work in Region X, Region X. Reported contract value: ₱237,620,029.50. Status: Past target date (DPWH On-Going). Contractor on record: TRIPARCO DEVELOPMENT CORP. Figures trace to dpwh.
Satellite images processing — before/after tiles will appear here after the next batch run.
Total Contract Cost
