P L SEBASTIAN CONST INC FORMERLY: P L SEBASTIAN CONST is listed as a company organization in Philippine public procurement records on this site, with 109 linked DPWH project(s) totaling about ₱9,537,327,490.79. Recorded delivery grade C (from public DPWH project records — not a finding of wrongdoing).
P L SEBASTIAN CONST INC FORMERLY: P L SEBASTIAN CONST
CGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 109
- Total value
- ₱9,537,327,490.79
- Published flags
- 0
- Region
- Region XI · Region XI
Online presence
Google Maps: P.L.SEBASTIAN CONSTRUCTION INC.★ 4.5 (8 reviews)Google Maps, 2026-10-22
Sitio Calumpang, Bgry, Santa Cruz, 8001 Davao del Sur
Public Record Grade
A transparent, data-derived summary of reported public records for P L SEBASTIAN CONST INC FORMERLY: P L SEBASTIAN CONST — not an accusation or finding of wrongdoing.
Score: 77.90 / 100 · Projects in sample: 109 · As of Oct 28, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 59.8/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 59.8
- lateCompletedProjects
- 3
- onTimeCompletedProjects
- 75
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 103
- pastTargetOngoingProjects
- 25
- undatedCompletedProjectsExcluded
- 6
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 109
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 109
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 109
- componentScore
- No data for this figure; the component is excluded, not scored
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 109
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 43 of 101 geotagged projects (largest by contract value) — Open full map · Download projects (CSV)
- REPLACEMENT OF BRIDGE - GOV. MIRANDA BR. (B00016MN) ALONG MAHARLIKA HIGHWAY, DAVAO DEL NORTE25L00119 · ₱301,515,917.47 · mapped
- CONC. OF MATANAO-KIBLAWAN-PADADA RD PACKAGE A, INCLUDING RROW, DAVAO DEL SUR18L00022 · ₱281,481,083.70 · mapped
- CONC. OF MATANAO-KIBLAWAN-PADADA RD (INCL. WIDENING OF SUBSTANDARD TO STANDARD), DAVAO DEL SUR LONE17L00093 · ₱279,694,745.13
- CONCRETING OF MATANAO-KIBLAWAN-PADADA ROAD PACKAGE B, INCLUDING RROW, DAVAO DEL SUR18L00025 · ₱219,066,562.67 · mapped
- REHABILITATION OF PAVED ROAD DAVAO COTABATO RD (JCT. DIGOS-COTABATO SECT) K1598+140-K1599+000, K1601+000-K1603+000, K1605+948-K1605+1065, K1606+205-K1606+282, K1606+539-K1607+000, K1607+825-K1609+649, K1610+000-K1610+225, K1612+700-K1614+466, K1611+18M00036 · ₱212,827,562.96 · mapped
- CONCRETING OF LOMONDAO-SALAYSAY-ARAKAN ROAD LEADING TO MT. APO,MARILOG DIST.,DAVAO CITY (INCLUDING C15L00081 · ₱211,913,320.70
- CONSTRUCTION OF CONCRETE ROAD - MATANAO - KIBLAWAN - PADADA ROAD, DAVAO DEL SUR21L00154 · ₱204,780,451.90 · mapped
- CONSTRUCTION OF CONCRETE BRIDGE-JCT. CABANTIAN ROAD (ACACIA SECTION)-JCT. MANDUG-CALLAWA ROAD (MANDUG SECTION), DAVAO CITY20L00040 · ₱194,709,190.43 · mapped
- PREVENTIVE MAINTENANCE - MAHARLIKA HIGHWAY( COTABATO-MARBEL RD) - K1740 + 789 - K1741 + 279, K1742 + 333 - K1743 + 233, SURALLAH, SOUTH COTABATO25M00051 · ₱187,147,083.43 · mapped
- WIDENING (2 INTO 4 LANES) OF DAVAO-BUKIDNON RD INCL. SLOPE PROTECTION & ROW (BRGY. BAGANIHAN & BRGY.18L00013 · ₱184,300,485.87 · mapped
- CONCRETING OF TAMUGAN-TAMBOBONG-MAGPET ROAD, DAVAO CITY 3RD LD16L00019 · ₱183,132,966.66 · mapped
- Construction of Digos River Flood Control Project, Barangay Ruparan (Section 6), City of Digos, Davao del Sur22L00084 · ₱173,600,437.60 · mapped
- WIDENING (2 INTO 4 LANES) OF DVO.COT. RD (JCT. DIGOS-COTABATO SECT.) INCL. RROW (BRGY.SINAWILAN-BRGY17L00035 · ₱171,349,171.02 · mapped
- JCT. DAVAO-COTABATO ROAD (BANGKAL SECT.)-CATALUNAN GRANDE RD-JCT. DAVAO-BUKIDNON RD (MINTAL SECT.),I18L00164 · ₱169,818,099.48 · mapped
- CONSTRUCTION OF PULANGI RIVERBANK PROTECTION (DOWNSTREAM OF CARMEN BR., RIGHT BANK), PHASE III, STA. 0+652.5 - STA. 01+286.5, BARANGAY UGALINGAN, CARMEN, COTABATO25M00007 · ₱167,030,107.36 · mapped
- ROAD WIDENING OF DAVAO-COTABATO ROAD (JCT. DIGOS-COTABATO SECTION), K1598+700 K1602+981 (CHAINAGE 5518 CHAINAGE 9818) MAKILALA, NORTH COTABATO17M00045 · ₱141,551,172.34 · mapped
- WIDENING (2 INTO 4 LANES) OF DAVAO-BUKIDNON RD INCL. REHAB./RECONST./UPGRADING(ASPHALT TO CONCRETE)17L00094 · ₱140,888,843.13 · mapped
- ROAD UPGRADING (GRAVEL TO CONCRETE) ALONG MAGPET-NOWA-DOROLUMAN-GREENFIELD ROAD, K1647+484.33-K1651+060 MAGPET, NORTH COTABATO16M00012 · ₱140,304,789.24 · mapped
- ROAD OPENING AND NEW BRIDGE CONSTRUCTION ALONG PUTIAN-ARAKAN, K1685+500-K1687+840; K1691+900-K1696+880; BRIDGE SECTION: K1686+565-K1686+595 (LENGTH=30M) ARAKAN, NORTH COTABATO15M00093 · ₱140,298,984.31
- ROAD UPGRADING (GRAVEL TO CONCRETE) ALONG MAGPET-NOWA-DOROLUMAN-GREENFIELD ROAD, K1651+060-K61654+010 MAGPET, NORTH COTABATO16M00013 · ₱140,295,734.20 · mapped
- CONSTRUCTION OF CONCRETE ROAD-MATANAO-KIBLAWAN-PADADA ROAD, PACKAGE C, DAVAO DEL SUR20L00085 · ₱137,689,438.44 · mapped
- CONSTRUCTION OF CONCRETE ROAD-ALTERNATE ROAD FROM REGION XI TO REGION X, PACKAGE 3A, DAVAO CITY19L00029 · ₱133,590,086.81 · mapped
- ROAD WIDENING OF DAVAO-COTABATO ROAD (JCT. DIGOS-COTABATO SECTION), K1594+(-807) - K1594+(-263) (CHAINAGE 0 - CHAINAGE 544), K1594+(-023) - K1596+480 (CHAINAGE 784 - CHAINAGE 3304), K1596+720 - K1596+960 (CHAINAGE 3544 - CHAINAGE 3784), K1597+140 - K1597+17M00044 · ₱133,550,023.20 · mapped
- CONST. OF PATIL-KAPATAGAN 2-LANE PSCG BRIDGE W/ SLOPE PROTECTION (REVETMENT) & INCLUDING CONCRETING15L00063 · ₱130,255,937.81 · mapped
- BUKIDNON-COTABATO RD - K1612+656 - K1613+00025MI0056 · ₱127,804,362.62 · mapped
- ROAD CONCRETING & OPENING ALONG PUNTIAN-ARAKAN ROAD INCLUDING BRIDGE CONSTRUCTION, PACKAGE 1, K1692+832-K1695+654 (ROAD CONCRETING); K1696+880-K1698+889 (ROAD OPENING); K1698+889-K1698+949 (BRIDGE COMPONENT), ARAKAN, NORTH COTABATO17M00083 · ₱125,081,709.11
- WIDENING OF BRIDGE - KABACAN BR. 1 (B00265MN) ALONG PACO-ROXAS-ARAKAN VALLEY - JCT. DAVAO -BUKIDNON ROAD, PRESIDENT ROXAS, NORTH COTABATO22M00008 · ₱116,041,250.00 · mapped
- CONSTRUCTION OF CONCRETE ROAD-MATANAO-KIBLAWAN-PADADA ROAD, PACKAGE E, DAVAO DEL SUR20L00087 · ₱109,092,220.62 · mapped
- CONSTRUCTION OF MISSING LINKS/ NEW ROADS - PUNTIAN-ARAKAN ROAD, PACKAGE 3, COTABATO, ARAKAN, NORTH COTABATO21M00040 · ₱106,150,000.00 · mapped
- CONSTRUCTION OF MISSING LINKS/NEW ROADS PUNTIAN-ARAKAN ROAD, PACKAGE 2, STA. 0000+000-STA. 0000+113.8 STA. 0000+300-STA. 0000+936.96,STA. 0013+722-STA. 0016+000, ARAKAN, NORTH COTABATO20M00002 · ₱98,912,487.00 · mapped
- IMPROVEMENT/REHABILITATION/CONSTRUCTION OF PATIL-KAPATAGAN ROAD, DAVAO DEL NORTE15L00110 · ₱97,401,079.12
- CONSTRUCTION OF BRIDGE, KINSE-KINSE, BARANGAY TAPAK, DAVAO CITY23LB0094 · ₱96,500,000.00 · mapped
- CONSTRUCTION OF CONCRETE REVETMENT ALONG DIGOS RIVER, COGON-BIAO SETION, DIGOS CITY, DAVAO DEL SUR21LD0047 · ₱96,500,000.00 · mapped
- CONSTRUCTION OF ROAD, NAPANLAHAN-DALLAG ROAD, STA. 7+439 - STA. 8+369, STA. 8+394 - STA. 10+259, ARAKAN, NORTH COTABATO23M00025 · ₱96,500,000.00 · mapped
- CONSTRUCTION OF JCT. TAGUM - PANABO CIRCUMFERENTIAL ROAD, BRGY. NEW BANTAYAN - BRGY. MAGATOS, ASUNCION, DAVAO DEL NORTE22LC0139 · ₱96,500,000.00 · mapped
- CONSTRUCTION OF PUROK 6 OSMENA-PARAMI ROAD WITH PSCG BRIDGE, SULOP, DAVAO DEL SUR22LD0068 · ₱96,500,000.00 · mapped
- CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - PACO-ROXAS-ARAKAN VALLEY-JCT DAVAO-BUKIDNON RD - K1684 + 475 - K1684 + 617, ARAKAN, COTABATO24MC0012 · ₱96,500,000.00 · mapped
- PREVENTIVE MAINTENANCE OF ROAD; ASPHALT OVERLAY- DAVAO- COTABATO RD (JCT DIGOS-COTABATO SECT)-K1575+565-K1576+140, K1582+714-K1582+844, K1585+241-K1585+700, DAVAO DEL SUR25LD0018 · ₱96,017,474.31 · mapped
- PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY-DAVAO- COTABATO RD (JCT DIGOS-COTABATO SECT)-K1564+265-K1565+042, K1568+030-K1568+660,DAVAO DEL SUR25LD0017 · ₱96,014,709.17 · mapped
- BENIGNO S. AQUINO JR. NATIONAL HIGHWAY-K1583+300 - K1583+600, CATEEL, DAVAO ORIENTAL23LF0054 · ₱95,299,485.24 · mapped
- CONSTRUCTION OF CONCRETE ROAD-PUNTIAN-ARAKAN ROAD, COTABATO, ARAKAN, NORTH COTABATO19MC0082 · ₱95,050,508.62 · mapped
- PREVENTIVE MAINTENANCE OF ROAD;: ASPHALT OVERLAY- DAVAO- COTABATO ROAD (JCT. DIGOS-COTABATO SECTION)-K1580+625-K1581+434, K1582+118-K1582+670, DAVAO DEL SUR25LD0194 · ₱94,537,715.69 · mapped
- PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - MAHARLIKA HIGHWAY - (S01364MN) K1480+695 - K1481+640, K1482+740 - K1482+961, (S00062MN) K1482+333 - K1482+752, (S00063MN) K1480+(-956) - K1480+(-695), DAVAO DEL NORTE24L00348 · ₱93,595,482.65 · mapped
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG TINANAN RIVER , PACKAGE 1, BARANGAY MALIBATUAN, ARAKAN, COTABATO25MC0043 · ₱93,556,209.63 · mapped
- IMPVT./CONC. OF BYPASS RD, JCT. PADADA (ALONG DIGOS-MAKAR RD)-KIBLAWAN-JCT. MALUNGON (ALONG DIGOS-MA17L00092 · ₱93,373,715.81
- CONSTRUCTION OF CONCRETE BRIDGE - MATANAO - KIBLAWAN - PADADA ROAD, PACKAGE J, DAVAO DEL SUR23L00081 · ₱92,660,036.20 · mapped
- ROAD UPGRADING (UNPAVED TO PAVED) OF PUNTIAN-ARAKAN ROAD, K1685+500 K1868+565 (CHAINAGE 0 CHAINAGE 1065); K1686+595 K1687+840 (CHAINAGE 1095+CHAINAGE 2340); K1691+900 K1694+607 (CHAINAGE 6400 CHAINAGE17M00021 · ₱91,432,849.34
- ROAD UPGRADING (GRAVEL TO CONCRETE) ALONG MAGPET-NOWA-DOROLUMAN-GREENFIELD ROAD, K1654+010-K1655+658 MAGPET, NORTH COTABATO16M00014 · ₱90,418,738.35 · mapped
- REPLACEMENT (2 INTO 4 LANES) OF LIPADAS BRIDGE (B00012MN) ALONG DAVAO-COTABATO RD (DAVAO CITY-JCT. D18L00055 · ₱89,633,617.56 · mapped
- ROAD WIDENING ON SPECIFIC LOCATIONS ALONG TAGUM-PANABO CIRCUMFERENTIAL ROAD (S01359MN), DAVAO DEL NO20L00059 · ₱89,335,096.07 · mapped
Equipment & capacity
PCAB license
- License no.
- 35840
- Category
- AAA · Large B
- Minimum net worth for this category
- ₱180,000,000.00
- Allowable range of contract cost (ARCC)
- ₱450M or above (no published ceiling)
- License valid until
- Mar 5, 2028
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 35840); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
10 evaluations listed across 5 GPPB CPES releases; average final rating 93.1% over 5 rated projects; 10 site-visit ratings. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| Jun 5, 2025 | DPWH | ₱96,017,474.00 | On-going | 95.8% | — | 40th, p. 231 |
| Mar 19, 2025 | DPWH | ₱48,248,389.00 | Completed | 89.1% | 91.3% | 40th, p. 231 |
| Nov 8, 2024 | DPWH | ₱19,008,696.00 | Completed | 90.9% | 90.9% | 39th (rev), p. 157 |
| Nov 8, 2024 | DPWH | ₱48,248,389.00 | On-going | 92.8% | — | 39th (rev), p. 157 |
| Nov 5, 2024 | DPWH | ₱19,001,401.00 | Completed | 95.1% | 95.1% | 39th (rev), p. 157 |
| May 11, 2024 | DPWH | ₱17,299,490.00 | On-going | 92.4% | — | 38th, p. 181 |
| May 11, 2024 | DPWH | ₱85,588,528.00 | On-going | 94.6% | — | 38th, p. 181 |
| Aug 23, 2023 | DPWH | ₱96,500,000.00 | Final | 92.0% | 95.3% | 36th, p. 152 |
| Mar 8, 2023 | DPWH | ₱96,500,000.00 | On-going | 97.5% | — | 35th, p. 127 |
| Nov 24, 2019 | DPWH | ₱29,840,295.00 | Completed | 93.1% | 93.1% | 40th, p. 232 |
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →