CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BAYATING RIVER (SEGMENT 5), CAMILING, TARLAC
CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BAYATING RIVER (SEGMENT 5), CAMILING, TARLAC is a DPWH-tracked public work in Tarlac DEO, Region III. Reported contract value: ₱96,500,000.00. Status: Past target date (DPWH On-Going). Contractor on record: PERSAN CONST INC FORMERLY: PERSAN CONST. Figures trace to dpwh.
Total Contract Cost
