Construction of Flood Control Structure along Puray River, Barangay San Isidro, Rodriguez, Rizal, Phase I
Construction of Flood Control Structure along Puray River, Barangay San Isidro, Rodriguez, Rizal, Phase I is a DPWH-tracked public work in MONTALBAN (RIZAL), RIZAL, Region IV-A. Reported contract value: ₱78,557,807.92. Status: Reported complete (DPWH). Contractor on record: PERSAN CONST INC FORMERLY: PERSAN CONST. Figures trace to sumbong.
Total Contract Cost
