Construction of Flood Control Structure along Upper Marikina River (Phase VIII), San Mateo, Rizal
Construction of Flood Control Structure along Upper Marikina River (Phase VIII), San Mateo, Rizal is a DPWH-tracked public work in SAN MATEO (RIZAL), RIZAL, Region IV-A. Reported contract value: ₱144,750,000.00. Status: Reported complete (DPWH). Contractor on record: AKSUM CONTRACTING CORP. Figures trace to sumbong.
Total Contract Cost


