CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG UPPER MARIKINA RIVER, PACKAGE 1, SAN MATEO, RIZAL
CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG UPPER MARIKINA RIVER, PACKAGE 1, SAN MATEO, RIZAL is a DPWH-tracked public work in Region IV-A, Region IV-A. Reported contract value: ₱145,835,524.13. Status: Ongoing (DPWH-reported) (Not Yet Started (DPWH-reported)). Contractor on record: AKSUM CONTRACTING CORP. Figures trace to dpwh.
Total Contract Cost



