1C4M BUILDERS INC is listed as a company organization in Philippine public procurement records on this site, with 65 linked DPWH project(s) totaling about ₱1,620,292,550.45. Recorded delivery grade C (from public DPWH project records — not a finding of wrongdoing).
1C4M BUILDERS INC
CGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 65
- Total value
- ₱1,620,292,550.45
- Published flags
- 1
- Region
- Rizal 1st DEO · Region IV-A
Online presence
Google Maps: 1c4m Builders IncGoogle Maps, 2026-10-22
Lot 14,15,blk 1 & lot 1,2&3 blk 4, Teacher Summerville Subd, sitio Sarimanok, Antipolo, 1870 Rizal
Licensed officers (PCAB)
- Meynard C. Ko · Authorized Managing Officer (PCAB license 46048) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for 1C4M BUILDERS INC — not an accusation or finding of wrongdoing.
Score: 74.30 / 100 · Projects in sample: 65 · As of Oct 22, 2026 UTC
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 49.4/100 · Weight: 47%
- graceDays
- 30
- componentScore
- 49.4
- lateCompletedProjects
- 0
- onTimeCompletedProjects
- 39
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 59
- pastTargetOngoingProjects
- 20
- undatedCompletedProjectsExcluded
- 5
- Termination rate
Component score: 95.4/100 · Weight: 21%
- totalProjects
- 65
- componentScore
- 95.4
- terminatedProjects
- 1
- terminationRatePct
- 1.5
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 21%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 64
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
Component score: 99.5/100 · Weight: 11%
- projects
- 65
- componentScore
- 99.5
- flagsPerProject
- 0.02
- publishedV2Flags
- 1
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 65
- componentScore
- —
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 50 of 65 geotagged projects (largest by contract value) — Open full map
- FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, TINAPANTAY RIVER, PHASE IV, BRGY. SAN JOSE ANTIPOLO CITY (SECOND DISTRICT)24DN0072 · ₱57,900,000.00 · mapped
- ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS - CORAZON C. AQUINO AVE. - K0030+375 - K0031+669, ANTIPOLO CITY (SECOND DISTRICT)25DN0037 · ₱49,636,857.66 · mapped
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, DAU CREEK PHASE 2, BARANGAY SAN LUIS ANTIPOLO CITY, RIZAL (SECOND DISTRICT)24DN0032 · ₱49,000,000.00 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE, KABISIG CREEK, PHASE 2, BARANGAY SAN JOSE, ANTIPOLO CITY, RIZAL (SECOND DISTRICT)25DN0027 · ₱49,000,000.00 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE, TINAPANTAY RIVER, PHASE 5, BARANGAY SAN JOSE, ANTIPOLO CITY, RIZAL (SECOND DISTRICT)25DN0012 · ₱49,000,000.00 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE, ONDOY CREEK, PHASE 2, BARANGAY SAN JOSE, ANTIPOLO CITY, RIZAL (SECOND DISTRICT)25DN0013 · ₱49,000,000.00 · mapped
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, ONDOY CREEK, BARANGAY SAN JOSE ANTIPOLO CITY, RIZAL (SECOND DISTRICT)24DN0028 · ₱48,999,997.76 · mapped
- FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, LIBIS CREEK PHASE 2, BARANGAY SAN JOSE ANTIPOLO CITY, RIZAL (SECOND DISTRICT)24DN0065 · ₱48,999,995.14 · mapped
- FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, CUPANG RIVER (DOWNSTREAM), PHASE 3, BARANGAY CUPANG ANTIPOLO CITY, RIZAL (SECOND DISTRICT)24DN0004 · ₱48,999,932.10 · mapped
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, CALAWIS CREEK PHASE 2, BARANGAY CALAWIS ANTIPOLO CITY, RIZAL (SECOND DISTRICT)24DN0029 · ₱48,999,849.23 · mapped
- FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BINAYOYO RIVER (DOWNSTREAM) PHASE 6, BARANGAY CALAWIS ANTIPOLO CITY, RIZAL (SECOND DISTRICT)24DN0002 · ₱48,999,513.32 · mapped
- Construction of Flood Control Structure, Binayoyo River (Downstream) Phase 5, Barangay Calawis, Antipolo City, Rizal24DN0001 · ₱48,998,726.00 · mapped
- FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, CALAWIS RIVER (UPSTREAM), PHASE 3, BARANGAY CALAWIS ANTIPOLO CITY, RIZAL (SECOND DISTRICT)24DN0003 · ₱48,915,925.00 · mapped
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, CALAWIS RIVER (UPSTREAM) PHASE 4, BARANGAY CALAWIS ANTIPOLO CITY, RIZAL (SECOND DISTRICT)24DN0021 · ₱48,807,092.90 · mapped
- Construction of Flood Control Structure, Calawis River (Downstream) Phase 3, Barangay Calawis, Antipolo City, Rizal24DN0022 · ₱48,744,682.77 · mapped
- CONSTRUCTION OF BOX CULVERT, MANADLAM SITIO APIA, BARANGAY CALAWIS ANTIPOLO CITY, RIZAL (SECOND DISTRICT)24DN0088 · ₱47,769,583.05 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE, SAN JUAN CREEK, BARANGAY SAN JUAN ANTIPOLO CITY, RIZAL (SECOND DISTRICT)24DN0165 · ₱47,305,139.00 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE, LIBIS CREEK, PHASE 3, BARANGAY SAN JOSE, ANTIPOLO CITY, RIZAL (SECOND DISTRICT)25DN0026 · ₱47,039,943.28 · mapped
- CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, CUPANG RIVER (DOWNSTREAM) PHASE 4, BARANGAY CUPANG, ANTIPOLO CITY, RIZAL (SECOND DISTRICT)25DN0005 · ₱46,895,046.12 · mapped
- CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BINAYOYO RIVER (DOWNSTREAM) PHASE 7, BARANGAY CALAWIS, ANTIPOLO CITY, RIZAL (SECOND DISTRICT)25DN0002 · ₱46,714,438.12 · mapped
- CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, CALAWIS RIVER (UPSTREAM) PHASE 5, BARANGAY CALAWIS, ANTIPOLO CITY, RIZAL (SECOND DISTRICT)25DN0004 · ₱46,688,189.62 · mapped
- CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, CALAWIS RIVER (DOWNSTREAM) PHASE 4, BARANGAY CALAWIS, ANTIPOLO CITY, RIZAL (SECOND DISTRICT)25DN0003 · ₱46,628,754.89 · mapped
- CONSTRUCTION OF FOUR (4) STOREY, EIGHT (8) CL, LIBIS ES ANTIPOLO CITY (SECOND DISTRICT)23DN0135 · ₱30,000,000.00 · mapped
- ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS - MARIKINA - INFANTA RD - K0036+966 - K0036+973, K0036+973 - K0037+125, K0037+125 - K0037+360, K0037+360 - K0037+380, K0037+380 - K0037+422 ANTIPOLO CITY (SECOND DISTRICT)23DN0020 · ₱29,685,180.00 · mapped
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, KABISIG CREEK, BARANGAY SAN JOSE ANTIPOLO CITY, RIZAL (SECOND DISTRICT)24DN0013 · ₱29,399,998.53 · mapped
- Construction of Flood Control Structure, Calawis Creek, Brgy. Calawis, Antipolo City22DN0033 · ₱29,399,964.95 · mapped
- Construction of Flood Control Structure, Sitio Upper Kilingan, Brgy. San Jose, Antipolo City22DN0032 · ₱29,398,503.21 · mapped
- ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS - CORAZON C. AQUINO AVE. - K0028+500 - K0031+669, ANTIPOLO CITY (SECOND DISTRICT)25DN0077 · ₱28,540,689.79 · mapped
- OO1 - ASSET PRESERVATION - PREVENTIVE MAINTENANCE, SECONDARY ROADS, ANTIPOLO CIRCUMFERENTIAL ROAD A, K0025+827 - K0026+433, ANTIPOLO CITY (SECOND DISTRICT)21DN0052 · ₱27,514,380.58 · mapped
- ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS - MARIKINA - INFANTA RD - K0036+000 - K0036+070, K0036+070 - K0036+093, KK0036+093 - K0036+140, K0036+140 - K0036+160, K0036+160 - K0036+236 ANTIPOLO CITY (SECOND DISTRICT)23DN0032 · ₱26,547,154.45 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS - CORAZON C. AQUINO AVE. - K0028+000 - K0028+582.20 ANTIPOLO CITY (SECOND DISTRICT)23DN0018 · ₱23,035,880.00 · mapped
- FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, DALIG CREEK, BARANGAY DALIG ANTIPOLO CITY (SECOND DISTRICT)23DN0106 · ₱19,599,999.13 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - TERTIARY ROADS - SAGBAT-PILILLA DIVERSION ROAD, K0053+400 TO K0054+000 TANAY, RIZAL21DO0001 · ₱18,913,537.77 · mapped
- FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF BOX CULVERT, SITIO SAN JOSEPH, BARANGAY SAN JOSE ANTIPOLO CITY, RIZAL (SECOND DISTRICT)24DN0038 · ₱18,815,668.96 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS - CORAZON C. AQUINO AVE. - K0025+026 - K0025+725, K0025+(-065) - K0025+026 ANTIPOLO CITY (SECOND DISTRICT)23DN0014 · ₱16,170,000.00 · mapped
- FY 2023 DPWH INFRASTRUCTURE PROGRAM - ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS - MARIKINA - INFANTA RD - K0028+367 - K0028+578 ANTIPOLO CITY (SECOND DIST23DN0011 · ₱12,207,860.00 · mapped
- CONCRETING OF SITIO SAN JOSEPH, BRGY. SAN JOSE FMR, BRGY. SAN JOSE, ANTIPOLO CITY, RIZAL20DN0182 · ₱12,048,476.69 · mapped
- CONCRETING OF SAN YSIRO - SITIO LIBIS, BRGY. SAN JOSE FMR, BRGY. SAN JOSE, ANTIPOLO CITY, RIZAL20DN0181 · ₱12,030,668.89 · mapped
- CONCRETING OF SITIO TANZA I, BRGY. SAN JOSE FMR PHASE 3, BRGY. SAN JOSE ANTIPOLO CITY, RIZAL20DN0183 · ₱11,559,371.44 · mapped
- CONCRETING OF SITIO SAPINIT, BRGY. SAN JUAN FMR, BRGY. SAN JUAN ANTIPOLO CITY20DN0199 · ₱9,949,986.88 · mapped
- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF ROAD WITH DRAINAGE SYSTEM, SITIO INALSAN, BARANGAY SAN JUAN, ANTIPOLO CITY, RIZAL (SECOND DISTRICT)23DN0030 · ₱9,899,997.73 · mapped
- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF ROAD WITH DRAINAGE SYSTEM, SAN PEDRO AND SAN LORENZO RUIZ ST., BARANGAY DALIG, ANTIPOLO CITY, RIZAL (SECOND DISTRICT)23DN0029 · ₱9,899,899.95 · mapped
- ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS - CORAZON C. AQUINO AVE. - K0029+000 - K0029+400 ANTIPOLO CITY (SECOND DISTRICT)24DN0122 · ₱9,821,560.00 · mapped
- CONSTRUCTION/ REHABILITATION OF WATER SUPPLY/ SEPTAGE AND SEWERAGE/ RAINWATER COLLECTORS - WATER SUPPLY SYSTEM - CONSTRUCTION OF SOLAR WATER SYSTEM, SITIO KINAPUIN & SITIO SIMBAHAN, BRGY. CALAWIS ANTIPOLO CITY (SECOND DISTRICT)23DN0116 · ₱9,800,000.00 · mapped
- CONSTRUCTION/ REHABILITATION OF WATER SUPPLY/ SEPTAGE AND SEWERAGE/ RAINWATER COLLECTORS - WATER SUPPLY SYSTEM - CONSTRUCTION OF SOLAR WATER SYSTEM, SITIO SAN JOSEPH, SITIO SAN YSIRO & SITIO CANUMAY, BRGY. SAN JOSE ANTIPOLO CITY (SECOND DISTRICT)23DN0115 · ₱9,800,000.00 · mapped
- CONCRETING OF PUROK CANUMAY, SITIO SAN YSIRO, BRGY. SAN JOSE FMR, PHASE II, BRGY. SAN JOSE ANTIPOLO CITY, RIZAL19DN0226 · ₱9,651,831.49 · mapped
- CONCRETING OF SITIO APIA - MANADIAM, BRGY. CALAWIS FMR, PHASE II, BRGY. CALAWIS ANTIPOLO CITY, RIZAL19DN0227 · ₱9,649,915.16 · mapped
- REHABILITATION OF ROADS WITH DRAINAGE SYSTEM MAAGAY UNO, BARANGAY INARAWAN, ANTIPOLO CITY21DN0009 · ₱9,602,445.60 · mapped
- REHABILITATION OF ROADS WITH DRAINAGE SYSTEM, ANTIPOLO HILLS, ATIS ST., BARANGAY SAN LUIS ANTIPOLO CITY21DN0013 · ₱9,601,879.43 · mapped
- Construction of Flood Control Structure of Creek/Canal Corville Subdivision, Brgy. San Luis, Antipolo City22DN0020 · ₱9,454,403.70 · mapped
Across government
- DPWH Infrastructure: 62 awards · ₱1,580,159,009.91
- Municipality of Masinloc, Zambales Infrastructure: 44 awards · ₱377,787,949.01
- City of Antipolo Infrastructure: 50 awards · ₱123,072,569.21
- Municipality of Sta. Cruz, Zambales Infrastructure: 6 awards · ₱18,996,888.35
- Municipality of Sta. Cruz, Zambales Goods & services: 1 award · ₱10,470,127.58
- DPWH Goods & services: 1 award · ₱8,594,913.73
- Province of Rizal Infrastructure: 2 awards · ₱3,057,257.59
- Concreting of Various Roads at Brgy. Cupang, Anti
- Construction of Road and Drainage at Road Lot 10,
- 25DN0077₱28,540,689.79· 2025-05-16· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - RIZAL 1ST ED
- 25DN0037₱49,636,857.66· 2025-05-14· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - RIZAL 1ST ED
- CONST OF COVERED COURT AT BNHS, BRGY BANI
- CONST OF FRUITS & VEG BLDG., BRGY NORTH POB., MAS.
- CONST. OF MATERIAL RECOVERY FACILITY, BRGY BAMBAN,
- Repair/Repainting Works of 17m x 30m Covered Court
- Repair/Repainting of Four (4) Storey Eight (8) Roo
- Repair/Repainting of Two(2) Storey, Four(4) Classr
- Repair/Repainting of 4 – Storey – 8 Rooms DPWH Sch
- 25DN0026₱47,039,943.28· 2025-03-12· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - RIZAL 1ST ED
- 25DN0027₱47,034,610.00· 2025-03-12· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - RIZAL 1ST ED
- CONST OF 2 STOREY 6 CL BLDG AT BANI ELEM. SCHOOL
- Rehabilitation of Various Alley at Gamboaville, Br
- Improvement of One (1) Storey Two (2) Classroom Sc
- 25DN0013₱47,063,177.04· 2025-01-30· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - RIZAL 1ST ED
- 25DN0012₱47,039,587.57· 2025-01-30· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - RIZAL 1ST ED
- 25DN0003₱46,628,754.89· 2025-01-27· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - RIZAL 1ST ED
- 25DN0004₱46,688,189.62· 2025-01-27· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - RIZAL 1ST ED
- 25DN0005₱46,895,046.12· 2025-01-27· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - RIZAL 1ST ED
- 25DN0002₱46,714,438.12· 2025-01-27· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - RIZAL 1ST ED
- Construction of Multi-Purpose Bldg. at Evergreen E
- Improvement/Rehabilitation of Drainage Canal with
- CONSTRUCTION OF EVACUATION CENTER,BRGY TAPUAC
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
