EL-JAKE BUILDERS is listed as a company organization in Philippine public procurement records on this site, with 117 linked DPWH project(s) totaling about ₱1,890,475,205.53. Recorded delivery grade B (pattern summary from public DPWH/PhilGEPS links — not a finding of wrongdoing).
EL-JAKE BUILDERS
BRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 117
- Total value
- ₱1,890,475,205.53
- Published flags
- 1
- Region
- Rizal 1st DEO · Region IV-A
Public Record Grade
A transparent, data-derived summary of reported public records for EL-JAKE BUILDERS — not an accusation or finding of wrongdoing.
Score: 89.50 / 100 · Projects in sample: 117 · As of Oct 22, 2026 UTC
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 83.8/100 · Weight: 47%
- graceDays
- 30
- componentScore
- 83.8
- lateCompletedProjects
- 19
- onTimeCompletedProjects
- 91
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 115
- pastTargetOngoingProjects
- 5
- undatedCompletedProjectsExcluded
- 1
- Termination rate
Component score: 94.9/100 · Weight: 21%
- totalProjects
- 117
- componentScore
- 94.9
- terminatedProjects
- 2
- terminationRatePct
- 1.7
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 21%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 116
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
Component score: 99.7/100 · Weight: 11%
- projects
- 117
- componentScore
- 99.7
- flagsPerProject
- 0.01
- publishedV2Flags
- 1
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 117
- componentScore
- —
- linkedObservations
- 0
Computed automatically from public DPWH, PhilGEPS and COA records, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 47 of 96 geotagged projects (largest by contract value) — Open full map
- ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODSFLOOD MANAGEMENT PROGRAMCONST/MAINTENANCE OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMSCONST OF FLOOD CONTROL STRUCTURE ALONG KALERO RIVER, BRGY. SAN RAFAEL, NOVELETA, CAV24DF0157 · ₱100,560,720.00 · mapped
- ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS FLOOD MANAGEMENT PROGRAMCONST/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMSCONST OF REVETMENT ALONG YLANG-YLANG RIVER, BARANGAY SANTA ISABEL,KAWIT24DF0025 · ₱95,517,314.88 · mapped
- REHABILITATION OF MULTI-PURPOSE BUILDING WITHIN ZONE 58 TO 67, MANILA CITY (PHASE III)25OE0157 · ₱78,867,228.37 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES, SITIO KAPATAGAN TO BOSO-BOSO RIVER (DOWNSTREAM PHASE 2), K0035+900 ALONG MARIKINA-INFANTA ROAD ANTIPOLO CITY, RIZAL (SECOND DISTRICT)20DN0011 · ₱55,004,928.78 · mapped
- IMPROVEMENT/CONSTRUCTION OF FLOOD CONTROL STRUCTURES, SITIO KAPATAGAN RIVER (UPSTREAM PHASE 7), K0035+900 ALONG MARIKINA-INFANTA ROAD, ANTIPOLO CITY (SECOND DISTRICT)19DN0101 · ₱54,993,420.00 · mapped
- Construction of Flood Control and Slope Protection Structure along Upper Marikina River, Barangay San Jose, Rodriguez, Rizal23DO0036 · ₱48,249,216.48 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES OF BANABA CREEK GOING TO PEACE VILLAGE ES, BRGY. SAN LUIS ANTIPOLO CITY (SECOND DISTRICT)20DN0026 · ₱47,284,999.45 · mapped
- REHABILITATION OF FLOOD CONTROL STRUCTURES, BRGY. DELA PAZ AND BRGY. SAN ISIDRO, ANTIPOLO CITY21DN0069 · ₱46,794,446.99 · mapped
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF POCTOY FLOOD CONTROL, BOAC, MARINDUQUE20EA0036 · ₱45,233,565.18 · mapped
- Bank Improvement (Steel Sheet Pile) along Estero de San Miguel, Barangay 389 Phase II, Manila City22OE0088 · ₱44,914,073.11 · mapped
- ASSET PRESERVATION-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - TERTIARY ROADS, MARIKINA-INFANTA RD., - K0031+900 - K0032+293, ANTIPOLO CITY, RIZAL (SECOND DISTRICT)20DN0014 · ₱42,623,140.03 · mapped
- Bank Improvement (Steel Sheet Pile) along Estero de San Sebastian, (LS) Sta. 0+000 to Sta. 0+055 & Sta. 0+065 to Sta. 0+140, Manila City22OE0087 · ₱39,892,353.69 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, ZONE 25-40 (PHASE 2), MANILA CITY23OE0093 · ₱39,193,244.36 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT - ROAD WIDENING - TERTIARY ROADS - MARIKINA - VICTORIA VALLEY - ANTIPOLO RD - K0026+(-209) - K0026+(-027) ANTIPOLO CITY21DN0099 · ₱37,899,631.05 · mapped
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM, CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF DRAINAGE FEEDER LINES CONNECTING TO BLUMENTRITT INTERC19OE0041 · ₱31,846,963.50 · mapped
- CONSTRUCTION OF 3STY6CL, LIBRADA AVELINO ES, CITY OF MANILA23OE0230 · ₱29,997,414.34 · mapped
- OO2: REHABILITATION WITH SLOPE PROTECTION OF CREEK TINAPANTAY, BACK OF MARCELINO M. SANTOS NHS, BRGY. SAN JOSE, ANTIPOLO CITY18DN0125 · ₱29,400,000.00 · mapped
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-REHABILITATION AND IMPROVEMENT OF FLOOD CONTROL STRUCTURES ALONG MANGGAHAN RI18DO0040 · ₱29,400,000.00 · mapped
- 002-FLOOD MANAGEMENT SERVICES, CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, REHAB. WITH SLOPE PROTECTION OF BILIBIRAN CREEK, BINANGONAN, RIZAL18DN0010 · ₱29,400,000.00 · mapped
- CONSTRUCTION OF SLOPE PROTECTION, MINUYAN V, SAN JOSE DEL MONTE CITY, BULACAN19CD0054 · ₱29,237,035.89 · mapped
- OO2-CONSTRUCTION OF BOX CULVERT, SITIO PULANG PANYO, KAYSAKAT TO BOSO-BOSO, BRGY. SAN JOSE, ANTIPOLO CITY18DN0044 · ₱27,935,130.90 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG BULO RIVER (BARDIAS SECTION) PHASE II, SAN MIGUEL, BULACAN19CD0002 · ₱27,923,486.42 · mapped
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-DRAINAGE IMPROVEMENT ALONG BAMBANG ST., STA. 0+000.0 TO STA. 0+138.50 & STA.18OE0018 · ₱27,877,130.26 · mapped
- OO1- REHAB./RECONST. OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE, TERTIARY ROADS, MARIKINA-INFANTA ROAD, KOO20+404-K0020+423, K0020+428-K0020+518, K0020+780-K0020+800, K0021+863-K0022+717-K0022+760, K0023+980-K0023+1037.2-K0023+1127.2-K0023+1183,18DN0048 · ₱24,460,800.07 · mapped
- OO2-REHABILITATION OF DRAINAGE SYSTEM, FERRETVILLE SUBD., BRGY. SAN ROQUE, ANTIPOLO CITY18DN0046 · ₱23,419,233.54 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PALIWAS RIVER, STA. 0+379 TO STA. 0+539, BRGY. PANGHULO, OBANDO, BULACAN17CD0133 · ₱23,220,109.73 · mapped
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF RIVERWALL (STEEL SHEET PILES) ESTERO DE SUNOG APOG, STA. 0+9918OE0007 · ₱23,148,433.10 · mapped
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAITENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF RIVERWALL (STEEL SHEET PILE) AT ESTERO DE SUNOG APOG STA. 0+9218OE0010 · ₱23,144,437.44 · mapped
- IMPROVEMENT/DESILTING OF VILLANUEVA CREEK (SAN ISIDRO SECTION), PARAÑAQUE CITY, METRO MANILA17OC0049 · ₱22,292,460.22
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM, CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION OF DRAINAGE FEEDER LINES CONNECTING TO BLUMENTRITT INTERCE19OE0040 · ₱20,333,331.90 · mapped
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM, CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION OF DRAINAGE FEEDER LINES CONNECTING TO BLUMENTRITT INTERC19OE0039 · ₱20,234,730.79 · mapped
- Construction of Flood Control Structure along Upper Marikina, Barangay San Isidro, Rodriguez, Rizal23DO0088 · ₱20,056,331.71 · mapped
- Construction of Flood Control Structures along Upper Marikina River (Phase II), Brgy. San Isidro, Rodriguez, Rizal22DO0044 · ₱19,800,000.00 · mapped
- Construction of Flood Control Structures along Upper Marikina River (Phase I), Brgy. San Isidro, Rodriguez, Rizal22DO0043 · ₱19,800,000.00 · mapped
- Construction of Flood Control Structures along Upper Marikina River (Phase III), Brgy. San Isidro, Rodriguez, Rizal22DO0045 · ₱19,800,000.00 · mapped
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES, CONSTRUCTION/REHAB. WITH SLOPE PROTECTION OF CREEK, PEÑAFRANCIA, BRGY. CUPANG, ANTIPOLO CITY, 2ND LD17DN0040 · ₱19,600,000.00
- IMPROVEMENT/ REHABILITATION OF DRAINAGE SYSTEM, BRGY. OBRERO, QUEZON CITY17OG0058 · ₱19,455,886.02 · mapped
- REHABILITATION AND IMPROVEMENT OF DRAINAGE SYSTEM-ISAGANI ST., MA. CLARA ST., JUPITER, MOON, NEPTUNE, SATURN AND NAVAL STREETS, TAYTAY, RIZAL17DN0094 · ₱18,947,839.19 · mapped
- OO2: REHABILITATION WITH SLOPE PROTECTION OF CREEK, BAGONG PUROK, BRGY. SAN JOSE, ANTIPOLO CITY18DN0073 · ₱18,678,499.74 · mapped
- OO2: REHABILITATION WITH SLOPE PROTECTION OF ALONG SITIO TINAPANTAY TO SOLID CEMENT CREEK, BRGY. SAN JOSE, ANTIPOLO CITY18DN0124 · ₱18,638,712.67 · mapped
- OO2-REHABILITATION WITH SLOPE PROTECTION OF CREEK, INUMAN SECTION, BRGY. INARAWAN, ANTIPOLO CITY18DN0043 · ₱18,622,520.76 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES, BOSO-BOSO RIVER, BRGY. SAN JOSE, ANTIPOLO CITY (SECOND DISTRICT)20DN0006 · ₱18,616,087.57 · mapped
- OO2: REHABILITATION WITH SLOPE PROTECTION OF CREEK, BIRMINGHAM, BRGY. DALIG, ANTIPOLO CITY18DN0072 · ₱18,615,067.68 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES OF CREEK (PHASE 2), SITIO TINAPANTAY, BRGY. SAN JOSE, ANTIPOLO CITY (SECOND DISTRICT)20DN0005 · ₱18,614,124.99 · mapped
- OO2: REHABILITATION WITH SLOPE PROTECTION OF PULONG BANAL CREEK, ANTIPOLO CITY18DN0074 · ₱18,595,989.94 · mapped
- UPGRADING AND DRAINAGE IMPROVEMENT OF J. P. RIZAL AVENUE INCLUDING LATERALS, BRGY. POBLACION, MAKATI CITY, METRO MANILA18OC0090 · ₱18,424,208.92 · mapped
- OO2: REHABILITATION WITH SLOPE PROTECTION ALONG CUESTA BERDE TO TRICON (SAPANG BUHO/KAMATISAN CREEK), BRGY. DALIG, ANTIPOLO CITY18DN0089 · ₱13,958,406.84 · mapped
- UPGRADING AND DRAINAGE IMPROVEMENT OF NICANOR GARCIA ST. INCLUDING LATERALS, BRGY. POBLACION, MAKATI CITY, METRO MANILA18OC0087 · ₱13,817,336.57 · mapped
- REHAB./UPGRADING AND DRAINAGE IMPROVEMENT ALONG MALUGAY ST. AND ITS VICINITY, BRGY. SAN ANTONIO, DIST. I, MAKATI CITY, M.M.18OC0035 · ₱13,816,268.07 · mapped
- REHABILITATION/UPGRADING AND DRAINAGE IMPROVEMENT OF SAMPALOC STREET AND ITS VICINITY (PHASE II), BARANGAY SAN ANTONIO, DISTRICT I, MAKATI CITY, METRO MANILA17OC0027 · ₱13,532,132.40
Across government
No DepEd or DOH contract awards matched to this name in PhilGEPS records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
