| CONSTRUCTION OF BANK PROTECTION WORKS ALONG CAGAYAN RIVER (SECTION B) AT GATTARAN , CAGAYAN | Flood Control Management Cluster | ₱1.10B | Reported complete | RAYMAN BUILDERS INC | 135 | Check in |
| CONSTRUCTION OF BANK PROTECTION WORKS ALONG CAGAYAN RIVER (SECTION A) AT GATTARAN, CAGAYAN | Flood Control Management Cluster | ₱1.04B | Reported complete | R-II BUILDERS INC | 134 | Check in |
| CONSTRUCTION OF BANK PROTECTION WORKS ALONG CAGAYAN RIVER AT IGUIG, CAGAYAN AND AGGUNETAN, LASAM, CAGAYAN | Flood Control Management Cluster | ₱945.5M | Reported complete | TOKWING CONST CORP FOR TOKWING CONSTRUC | 108 | Check in |
| AGNO RIVER BASIN FLOOD CONTROL PROJECT (PHASE III)-CONSTRUCTION OF DIKE WITH PROTECTION WORKS USING GABIONS AND MATTRESSES ALONG: A. STA MARIA-ASINGAN, STA. 24+600 TO STA. 28+600, PANGASINAN; B. ASINGAN-TAYUG, STA. 29+776 TO STA., 30+900 AND STA. 33+840 T | Flood Control Management Cluster | ₱941.2M | 69% reported progress | L R TIQUI BUILDERS INC | 105 | Check in |
| CONSTRUCTION OF BANK PROTECTION WORKS ALONG TUGUEGARAO RIVER AT CAGGAY, TUGUEGARAO CITY, CAGAYAN | Flood Control Management Cluster | ₱931.7M | Reported complete | RAYMAN BUILDERS INC | 102 | Check in |
| RIVER IMPROVEMENT WORKS ALONG CAGAYAN RIVER, BUNTUN BRIDGE, TUGUEGARAO AND SOLANA AT STA. 3+950 TO STA. 5+800 AND SLOPE PROTECTION WORKS FOR BUNTUN BRIDGE, RIGHT BANK STA. 0+042 TO STA. 0+410, TUGUEGARAO CITY, CAGAYAN | Flood Control Management Cluster | ₱907.5M | Reported complete | RAYMAN BUILDERS INC | 99 | Check in |
| REHABILITATION OF DIKE SYSTEM ALONG MADONGAN RIVER (BREACHED AND ERODED DIKE, LEFT AND RIGHT BANK), LAOAG RIVER BASIN FLOOD CONTROL AND SABO PROJECT | Flood Control Management Cluster | ₱862.9M | Reported complete | TOKWING CONST CORP FOR TOKWING CONSTRUC | 125 | Check in |
| REHABILITATION OF DIKE SYSTEM ALONG CURA-LABUGAON RIVER (BREACHED AND ERODED DIKE, LEFT AND RIGHT BANK) LAOAG RIVER BASIN FLOOD CONTROL AND SABO PROJECT | Flood Control Management Cluster | ₱862.0M | Reported complete | TOKWING CONST CORP FOR TOKWING CONSTRUC | 128 | Check in |
| CONSTRUCTION / ADDITIONAL FLOOD CONTROL STRUCTURE ALONG ABRA RIVER, MUNICIPALITIES OF BUCAY, LANGIDEN, TAYUM, SALLAPADAN, LAGANGILANG, MANABO, AND LA PAZ ABRA | Flood Control Management Cluster | ₱853.1M | Reported complete | RAYMAN BUILDERS INC | 57 | Check in |
| FLOOD CONTROL WORKS-ABACAN RIVER DIKING AND SLOPE PROTECTION WORKS, MEXICO, PAMPANGA | Flood Control Management Cluster | ₱761.0M | Reported complete | R U AQUINO CONST AND DEVELOPMENT CORP FO | 198 | Check in |
| CONSTRUCTION/REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG UGUIS RIVER, BRGY. UGUIS AND ALONG TIBANGRAN RIVER, BRGY. BARANGOBONG, MUNICIPALITY OF NUEVA ERA, ILOCOS NORTE | Flood Control Management Cluster | ₱715.1M | 94% reported progress | MSB VITUG CONST | 103 | Check in |
| REHABILITATION OF DIKE SYSTEM ALONG SOLSONA RIVER (BREACHED AND ERODED DIKE, LEFT AND RIGHT BANK), LAOAG RIVER BASIN FLOOD CONTROL AND SABO PROJECT | Flood Control Management Cluster | ₱669.3M | Reported complete | E M CUERPO INC | 125 | Check in |
| CONSTRUCTION OF SMALL RIVER IMPOUNDING PROJECT (SRIP) AT PAPA RIVER, BRGY. STO. NIÑO, NUEVA ERA, ILOCOS NORTE | Flood Control Management Cluster | ₱533.8M | 94% reported progress | TOKWING CONST CORP FOR TOKWING CONSTRUC | 112 | Check in |
| FLOOD CONTROL PROJECT-WESTERN RIVER, STO. TOMAS/BUCAO RIVER, ZAMBALES | Flood Control Management Cluster | ₱420.4M | Reported complete | HORAMABI BUILDERS | 194 | Check in |
| CONSTRUCTION OF BANK PROTECTION WORKS ALONG CHICO RIVER AT PIAT. AND TUAO, CAGAYAN | Flood Control Management Cluster | ₱415.9M | 90% reported progress | J D LEGASPI CONST | 107 | Check in |
| FLOOD/LAHAR CONTROL WORKS IN PASIG-POTRERO RIVER AND PASAC DELTA AREA, PAMPANGA INCLUDING DIVERSION OF FLOW OF WATER TO PASIG-POTRERO RIVER, BACOLOR, PAMPANGA | Flood Control Management Cluster | ₱376.8M | 72% reported progress | R U AQUINO CONST AND DEVELOPMENT CORP FO | 209 | Check in |
| CONSTRUCTION/REHABILITATION OF BOLO RIVER DAM, BRGY. SAN ISIDRO, DUMALNEG, ILOCOS NORTE | Flood Control Management Cluster | ₱366.6M | Reported complete | TOKWING CONST CORP FOR TOKWING CONSTRUC | 176 | Check in |
| AGNO RIVER BASIN FLOOD CONTROL PROJECT (PHASE1)-CONSTRUCTION OF PROTECTION WORKS USING GABIONS AND MATTRESSES. BRGY. DORONGAN SAWAT, STA. 2+840 TO STA.3+140 AND STA. 3+140 T0 STA. 3+640, DORONGAN KETAKET, STA 1+592 TO STA. 2+840 MANGATAREM; (PHASE II-A)-R | Flood Control Management Cluster | ₱363.2M | Reported complete | MSB VITUG CONST | 122 | Check in |
| CONSTRUCTION OF GROUNDSILLS ACROSS PASIG-POTRERO RIVER AT DOWNSTREAM OF MANCATIAN BRIDGE, ANGELES-PORAC RIVER AT DOWNSTREAM OF MANCATIAN BRIDGE (GROUNDSILL NO. 1), ANGELES-PORAC, PAMPANGA | Flood Control Management Cluster | ₱309.6M | Reported complete | NORTHERN BUILDERS | 202 | Check in |
| CONSTRUCTION OF GROUNDSILLS ACROSS PASIG-POTRERO RIVER AT DOWNSTREAM OF MANCATIAN BRIDGE, ANGELES-PORAC RIVER AT DOWNSTREAM OF MANCATIAN BRIDGE (GROUNDSILL NO. 2), ANGELES-PORAC, PAMPANGA | Flood Control Management Cluster | ₱298.5M | Reported complete | NORTHERN BUILDERS | 207 | Check in |
| Construction of Camiling-Agno River Floodway, Tarlac, Phase 3 | CAMILING (TARLAC), TARLAC | ₱289.5M | Reported complete | BMK CONST CORP FORMERLY B M K CONST / ROYAL CROWN MONARCH CONST & SUPPLIES CORP | 134 | Check in |
| Construction of Camiling-Agno River Floodway, Tarlac, Phase 4 | CAMILING (TARLAC), TARLAC | ₱289.5M | Reported complete | BMK CONST CORP FORMERLY B M K CONST / ROYAL CROWN MONARCH CONST & SUPPLIES CORP | 135 | Check in |
| Construction of Casalogan River Control, Casiguran, Aurora | CASIGURAN (AURORA), AURORA | ₱289.5M | Reported complete | DALCON CONST / EGB CONST CORP FORMERLY: EGB CONST | 15 | Check in |
| FLOOD MANAGEMENT PROGRAM-CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-PASIG-POTRERO RIVER (BACOLOR SECTION), PAMPANGA (R.A. 9506-BACOLOR REHABILITATION ACT), PROVINCE OF PAMPANGA | Region III | ₱289.5M | Reported complete | A D GONZALES JR CONST | 210 | Check in |
| REHABILITATION/IMPROVEMENT OF BALUYOT CHANNEL AND ITS SPILLWAY, BACOLOR, PAMPANGA | Flood Control Management Cluster | ₱285.9M | Reported complete | R U AQUINO CONST AND DEVELOPMENT CORP FO | 207 | Check in |
| FLOOD CONTROL WORKS-SACOBIA-BAMBAN-ABACAN RIVER TRAINING WORKS INCLUDING RIO CHICO RIVER, TARLAC AND NUEVA ECIJA | Flood Control Management Cluster | ₱284.2M | Reported complete | NORTHERN BUILDERS | 182 | Check in |
| Flood Control Works-Abacan River Diking and Slope Protection Works, Mexico, Pampanga | ARAYAT (PAMPANGA), PAMPANGA | ₱270.2M | Reported complete | A D GONZALES JR CONST & TRADING CO INC | 196 | Check in |
| REHABILITATION/RESTORATION OF DETERIORATED DIKES/ERODED RIVERBANKS ALONG PAMPANGA RIVER INCLUDING CANDABA CUT-OFF CHANNEL, CANDABA, PAMPANGA | Flood Control Management Cluster | ₱260.3M | Reported complete | STO CRISTO CONST & TRADING INC FOR: STO CRISTO CONST & TRADING | 196 | Check in |
| Flood Control Works - Pasig-Potrero River and San Fernando - Sto. Tomas - Minalin Taildike (San Fernando and Bacolor Section) Pampanga | CITY OF SAN FERNANDO (CAPITAL) (LA UNION), LA UNION | ₱257.3M | Reported complete | A D GONZALES JR CONST & TRADING CO INC | 210 | Check in |
| Construction of Shoreline Protection (Groins) along Santa Catalina, Ilocos Sur | SANTA CATALINA (ILOCOS SUR), ILOCOS SUR | ₱241.2M | Reported complete | A P B CONST / EGB CONST CORP FORMERLY: EGB CONST | 65 | Check in |
| Construction of Flood Control Mitigation Facilities along Amburayan River Basin at Barangays Bucao West, Bucao East, Lantag, Baritao and Tarangotong, Tagudin, Ilocos Sur | TAGUDIN (ILOCOS SUR), ILOCOS SUR | ₱241.2M | Reported complete | A P B CONST / EGB CONST CORP FORMERLY: EGB CONST | 6 | Check in |
| CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-BIP-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BARANGAY MOCONG, BASUD, CAMARINES NORTE, BASUD, C | Region V | ₱240.1M | 93% reported progress | BRENTMIN ROOFING ENT | 185 | Check in |
| CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-BIP-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BASUD RIVER, BARANGAY MAMPILI, BASUD, CAMARINES N | Region V | ₱240.1M | 93% reported progress | BRENTMIN ROOFING ENT | 184 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF DAET RIVER FLOOD CONTROL STRUCTURE (DOGONGAN SECTION-PACKAGE | Region V | ₱238.7M | 90% reported progress | E GARCIA CONST CORP FOR E GARCIA CONST | 184 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, TALISAY RIVER, PACKAGE 2, BARANGA | Region V | ₱237.4M | 92% reported progress | HGG BUILDERS & SUPPLY | 178 | Check in |
| FLOOD CONTROL WORKS - REHABILITATION/RESTORATION OF DETERIORATED DIKES/ERODED PAMPANGA RIVER BANK INCLUDING CANDABA CUT-OFF CHANNEL, PAMPANGA AND NUEVA ECIJA | Flood Control Management Cluster | ₱237.1M | Reported complete | TOKWING CONST CORP FOR TOKWING CONSTRUC | 205 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF DAET RIVER FLOOD CONTROL STRUCTURE (DOGONGAN SECTION-PACKAGE | Region V | ₱236.4M | Reported complete | E GARCIA CONST CORP FOR E GARCIA CONST | 185 | Check in |
| CLUSTER II-ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-II-A: CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF DRAINAGE, BATO, CATANDUANES; II-B: CONSTRUCT | Catanduanes DEO | ₱235.3M | 0% reported progress | G C I CONST AND DEV'T CORP | 201 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, DAET RIVER, BARANGAY BIBIRAO, DAE | Region V | ₱235.2M | 95% reported progress | E GARCIA CONST CORP FOR E GARCIA CONST | 184 | Check in |
| CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY PAGSANGAHAN, BA | Region V | ₱234.0M | 89% reported progress | NEWBIG FOUR J CONST INC FORMERLY: FOUR J CONST | 188 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, TALISAY RIVER, BARANGAY CAHABAAN, | Region V | ₱234.0M | 80% reported progress | HGG BUILDERS & SUPPLY | 181 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BARANGAY MATOOGTOOG AND BARANGAY | Region V | ₱234.0M | 84% reported progress | BRENTMIN ROOFING ENT | 188 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG TALISAY RIVER, BARANGAY BINA | Region V | ₱234.0M | 96% reported progress | HGG BUILDERS & SUPPLY | 178 | Check in |
| CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY MANDAZO, BASUD, CAMAR | Region V | ₱234.0M | 89% reported progress | NEWBIG FOUR J CONST INC FORMERLY: FOUR J CONST | 185 | Check in |
| Construction of Flood Control Structure along Bislak River, Upstream and Downstream, Leftside of Vintar Bridge, Brgy. Abkir-Alviar, Vintar, Ilocos Norte | VINTAR (ILOCOS NORTE), ILOCOS NORTE | ₱211.3M | Reported complete | JOZEN BUILDERS AND CONST SUPPLY CORP / EGB CONST CORP FORMERLY: EGB CONST | 143 | Check in |
| CONSTRUCTION OF FLOOD CONTROL - ABACAN RIVER DIKING AND SLOPE PROTECTION WORKS, MEXICO, PAMPANGA | Flood Control Management Cluster | ₱198.7M | Reported complete | A D GONZALES JR CONST | 86 | Check in |
| BASIC INFRASTRUCTURE PROGRAM (BIP), CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG QUIAOIT RIVER (CONSTRUCTION OF DIVERSION CHANNEL), PAOAY, ILOCOS NORTE (PACKAGE B) | Region I | ₱198.0M | Reported complete | ALPHA | 119 | Check in |
| BASIC INFRASTRUCTURE PROGRAM (BIP), CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG QUIAOIT RIVER (CONSTRUCTION OF DIVERSION CHANNEL), BATAC, ILOCOS NORTE (PACKAGE B) | Region I | ₱198.0M | 95% reported progress | KATHA BUILDERS & SUPPLIES INC | 119 | Check in |
| CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-BIP-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BARANGAY GUINACUTAN, VINZONS, CAMARINES NORTE, VI | Region V | ₱198.0M | Reported complete | PARTIDO CONST | 180 | Check in |
| Construction of Camiling-Agno River Floodway Phase 5 | CAMILING (TARLAC), TARLAC | ₱193.0M | Reported complete | BMK CONST CORP FORMERLY B M K CONST / ROYAL CROWN MONARCH CONST & SUPPLIES CORP | 135 | Check in |
| CONSTRUCTION / REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF LENGTAN FLOOD CONTROL ALONG CHICO RIVER, SAMOKI, BONTOC, MOUNTAIN PROVINCE | Cordillera Administrative Region | ₱193.0M | 90% reported progress | BALINTUGAN CONST | 22 | Check in |
| FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF DIPACULAO RIVER CONTROL STRUCTURE (PHASE 2), DIPACULAO, AURORA, PROVINCE OF AURORA | Region III | ₱193.0M | Reported complete | PERSAN CONST INC FORMERLY: PERSAN CONST | 88 | Check in |
| Construction of Abitonan Flood Control Structure, Dipaculao, Aurora | DIPACULAO (AURORA), AURORA | ₱193.0M | Reported complete | PERSAN CONST INC FORMERLY: PERSAN CONST / 4VC BUILDERS & DEVELOPMENT CORP | 88 | Check in |
| Construction of Flood Mitigation Structure along Sinucalan River, Barangay Camantiles, Urdaneta, Pangasinan | CITY OF URDANETA (PANGASINAN), PANGASINAN | ₱193.0M | Reported complete | SILVERWOLVES CONST CORP | 106 | Check in |
| Rehabilitation/Improvement of Samac SWIP, Bugnay SWIP, Bingao SWIP Small Water Impounding Projects Barangays Sta. Asuncion, San Agustin, San Pedro, San Nicolas, Ilocos Norte | SAN NICOLAS (ILOCOS NORTE), ILOCOS NORTE | ₱193.0M | Reported complete | BADOC BUILDERS & SUPPLY INC FORMERLY: BADOC BUILDER & SUPPLY / ST GERRARD CONST GEN CONTRACTOR & DEVELOPMENT CORP FORMERLY:ST GERRARD CONST | 129 | Check in |
| CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS(SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF ROAD DIKE ALONG HITOMA RIVER, PHASE II, BARANGAY OBI, CARAMORAN, C | Region V | ₱193.0M | 96% reported progress | HI-TONE CONST & DEVELOPMENT CORP FORMERLY | 187 | Check in |
| Construction of Bulos Flood Control Structure, Dipaculao, Aurora | DIPACULAO (AURORA), AURORA | ₱193.0M | Reported complete | R D TALENS CONST AND TRADING | 56 | Check in |
| CONVERGENCE & SPL. SUPPORT PROG.-SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONST. OF SLOPE PROTECTION STRUCTURES ALONG TELABASTAGAN-SAINT JUDE CREEK, SAN FDO. CITY | Region III | ₱193.0M | 90% reported progress | R D POLICARPIO | 203 | Check in |
| Construction of Aguang Flood Control Structure, Baler, Aurora | BALER (CAPITAL) (AURORA), AURORA | ₱193.0M | Reported complete | PERSAN CONST INC FORMERLY: PERSAN CONST / 4VC BUILDERS & DEVELOPMENT CORP | 94 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE, HICMING, VIRAC, CATANDUANES, VIRAC, | Region V | ₱193.0M | Reported complete | HI-TONE CONST & DEVELOPMENT CORP FORMERLY | 202 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BORIS RIVER, PACKAGE 2, BARANGAY PARIAN - BARANGAY TORRE 1ST, MANGATAREM, PANGASINAN | Region I | ₱193.0M | 98% reported progress | SILVERWOLVES CONST CORP | 132 | Check in |
| Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Construction of Flood Control Structure along Agos River, Infanta, Quezon (Package A) | INFANTA (QUEZON), QUEZON | ₱193.0M | Reported complete | SILVERWOLVES CONST CORP | 181 | Check in |
| Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Construction of Flood Control Structure along Agos River, Infanta, Quezon (Package B) | INFANTA (QUEZON), QUEZON | ₱193.0M | Reported complete | SILVERWOLVES CONST CORP | 181 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG AGOS RIVER, INFANTA, QUEZON, (PACKAGE I) | Region IV-A | ₱193.0M | 85% reported progress | SILVERWOLVES CONST CORP | 180 | Check in |
| Construction of Flood Control and Bank Protection StructuresLukutang Malaki River at Sitio Anginan, Barangay San Isidro, Rodriguez, Rizal Package 2 | MONTALBAN (RIZAL), RIZAL | ₱193.0M | Reported complete | ST GERRARD CONST GEN CONTRACTOR & DEVELOPMENT CORP FORMERLY:ST GERRARD CONST | 210 | Check in |
| CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, FLOOD CONTROL WORKS - ABACAN RIVER DIKING AND SLOPE PROTECTION WORKS, MEXICO, PAMPANGA | Flood Control Management Cluster | ₱193.0M | Reported complete | R U AQUINO CONST AND DEVELOPMENT CORP FO | 201 | Check in |
| FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION/REHABILITATION OF ERODED PAMPANGA RIVER BANK (SAN JOSE, SAN SIMON AND SUCAD, APALIT SECTION) PROVINCE OF PAMPANGA | Region III | ₱193.0M | Reported complete | E M CUERPO INC | 209 | Check in |
| Construction of Road Dike along Hitoma River, Phase I, Barangay Obi, Caramoran, Catanduanes | CARAMORAN (CATANDUANES), CATANDUANES | ₱193.0M | Reported complete | SUNWEST INC FORMERLY: SUNWEST CONST & DEVELOPMENT CORP | 186 | Check in |
| Construction of Flood Control Structure at Binagasbasan, Barangay Paraiso, San Miguel, Catanduanes | SAN MIGUEL (CATANDUANES), CATANDUANES | ₱192.8M | Reported complete | SUNWEST INC FORMERLY: SUNWEST CONST & DEVELOPMENT CORP | 185 | Check in |
| CONSTRUCTION OF FLOOD CONTROL AND SLOPE PROTECTION STRUCTURES ALONG LUKUTANG MALAKI RIVER, BARANGAY SAN ISIDRO, RODRIGUEZ, RIZAL PACKAGE 3 | Region IV-A | ₱192.2M | 69% reported progress | PREMIUM MEGASTRUCTURES INC | 210 | Check in |
| CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-BIP-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF PAJO BAGUIO FLOOD CONTROL STRUCTURE,PAJO BAGUIO, VIRAC, CATANDUANES, VIRAC, C | Region V | ₱192.1M | 94% reported progress | HI-TONE CONST & DEVELOPMENT CORP FORMERLY | 208 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION WORKS FOR CAGAYAN RIVER BASIN, SIFFU RIVER AT SAN PLACIDO, RO | Region II | ₱191.0M | 88% reported progress | R S K M CONST SERVICES | 44 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION WORKS FOR CAGAYAN RIVER BASIN, ILAGAN RIVER AT AGGASIAN, ILAG | Region II | ₱190.8M | 93% reported progress | EGB CONST CORP FORMERLY: EGB CONST | 52 | Check in |
| CONSTRUCTION OF FLOOD CONTROL ANDBANK PROTECTION STRUCTURES ALONGLUKUTANG MALAKI RIVER, BARANGAY SANISIDRO, RODRIGUEZ, RIZAL - PACKAGE 1 | Region IV-A | ₱190.1M | 81% reported progress | PREMIUM MEGASTRUCTURES INC | 211 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE, PINTO STA.31+800 - STA. 33+650 (L/S) ALFONSO LISTA, IFUGAO | Cordillera Administrative Region | ₱190.0M | 50% reported progress | DJY CONST | 26 | Check in |
| FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF AGUANG FLOOD CONTROL STRUCTURE-PHASE 3-BALER, AURORA, PROVINCE OF AURORA | Region III | ₱189.2M | 78% reported progress | PERSAN CONST INC FORMERLY: PERSAN CONST | 94 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG AGOS RIVER, PACKAGE U, GENERAL NAKAR, QUEZON, PHASE 2 | Region IV-A | ₱188.2M | 70% reported progress | SILVERWOLVES CONST CORP | 182 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG AGOS RIVER, INFANTA, QUEZON (PACKAGE K) | Region IV-A | ₱188.1M | 95% reported progress | SILVERWOLVES CONST CORP | 181 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG AGOS RIVER, INFANTA, QUEZON, (PACKAGE J) | Region IV-A | ₱187.6M | 0% reported progress | SILVERWOLVES CONST CORP | 180 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE, STO. DOMINGO, VIRAC, CATANDUANES, VI | Region V | ₱187.5M | 89% reported progress | HI-TONE CONST | 204 | Check in |
| CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE (PHASE 1), SITIO LUGI, | Region V | ₱187.2M | 61% reported progress | E GARCIA CONST CORP FOR E GARCIA CONST | 184 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-REHABILITATION OF FLOOD CONTROL STRUCTURE, OBI, CARAMORAN, CATANDUANES, CARAM | Region V | ₱187.2M | 76% reported progress | HI-TONE CONST & DEVELOPMENT CORP FORMERLY | 187 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-REHABILITATION OF FLOOD CONTROL STRUCTURE, SITIO TAGBAK, PARAISO, SAN MIGUEL, | Region V | ₱187.2M | 98% reported progress | HI-TONE CONST | 186 | Check in |
| CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-REHABILITATION OF FLOOD CONTROL STRUCTURE, BARANGAY SOLONG, SAN M | Region V | ₱187.2M | 78% reported progress | HI-TONE CONST | 196 | Check in |
| CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF DIKE, BARANGAY STO. CRISTO, VIRAC, CATANDUANES, | Region V | ₱187.2M | 73% reported progress | HI-TONE CONST | 206 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG AGOS RIVER, INFANTA, QUEZON, PACKAGE R | Region IV-A | ₱187.2M | 0% reported progress | PHESCO INC 145 | 179 | Check in |
| FLOOD CONTROL WORKS - ABACAN RIVER DIKING AND SLOPE PROTECTION WORKS, MEXICO, PAMPANGA | Flood Control Management Cluster | ₱186.4M | Reported complete | A D GONZALES JR CONST | 86 | Check in |
| OO 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MNG'T PROGRAM: CONST'N / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: FLOOD CONTROL/URGENT RIVER BANK PROTECTION WORKS, AGASIAN, ILAGAN, ISABELA, STA. 000+000-STA. 1+020 (D | Region II | ₱186.0M | Reported complete | E M CUERPO INC | 33 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF TUGUEGARAO CIRCUMFERENTIAL DIKE ROAD, TUGUEGARA | Region II | ₱183.0M | Reported complete | DOUBLE J1908 CONST | 98 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION WORKS FOR CAGAYAN RIVER BASIN, CAGAYAN RIVER AT ALICAOCAO, CA | Region II | ₱182.6M | 72% reported progress | JOMARCANN GEN CONST | 29 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF MITIGATION STRUCTURE ALONG CULASI RIVER, BARANGAY PAMBUHAN, M | Region V | ₱176.9M | 98% reported progress | BRENTMIN ROOFING ENT | 190 | Check in |
| REHABILITATION/RESTORATION OF DETERIORATED DIKES/ERODED RIVERBANKS ALONG PAMPANGA RIVER INCLUDING CANDABA CUT-OFF CHANNEL, CANDABA, PAMPANGA (INLCUDING ROW), CANDABA AND SAN SIMON, PAMPANGA | Flood Control Management Cluster | ₱174.3M | Reported complete | EDDMARI CONST | 195 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE(SEAWALL), BARANGAY SABANG, VINZONS, C | Region V | ₱173.7M | Reported complete | HGG BUILDERS | 171 | Check in |
| DIKING WITH SLOPE PROTECTION, SACOBIA-BAMBAN RIVER, PAMPANGA AND TARLAC | Flood Control Management Cluster | ₱173.6M | Reported complete | D L CERVANTES CONST CORP FORMERLY: | 185 | Check in |
| CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, LAOAG-SAN NICOLAS BYPASS ROAD (SAN NICOLAS SECTION), ILOCOS NORTE | Region I | ₱173.0M | Reported complete | BADOC BUILDERS | 133 | Check in |
| FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM-CONSTRUCTION OF FLOOD CONTROL STRUCTURE, ABACAN RIVER, DIKING AND SLOPE PROTECTION WORKS-PHASE 2, MEXICO, PAMPANGA | Region III | ₱170.1M | 49% reported progress | FERDSTAR BUILDERS INC | 194 | Check in |
| FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF ABITONAN RIVER FLOOD CONTROL STRUCTURE, DIPACULAO, AURORA, PROVINCE OF AURORA | Region III | ₱169.8M | Reported complete | R D TALENS CONST AND TRADING | 88 | Check in |
| CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF ROAD DIKE ALONG HITOMA RIVER, STA. 4+023.50-STA. 5+547.38(WITH EX | Region V | ₱168.3M | 78% reported progress | SUNWEST INC FORMERLY: SUNWEST CONST | 187 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG | Region V | ₱162.1M | Reported complete | BRENTMIN ROOFING ENT | 180 | Check in |
| REHABILITATION/RESTORATION OF DETERIORATED DIKES/ERODED RIVERBANKS ALONG PAMPANGA RIVER INCLUDING CANDABA CUT-OFF CHANNEL, CANDABA, PAMPANGA | Flood Control Management Cluster | ₱161.5M | Reported complete | EDDMARI CONST | 196 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF BASUD RIVER FLOOD MITIGATION STR | Region V | ₱161.2M | 86% reported progress | BRENTMIN ROOFING ENT | 187 | Check in |
| REHABILITATION/RESTORATION OF DETERIORATED DIKES/ERODED RIVERBANKS ALONG PAMPANGA RIVER INCLUDING CANDABA CUT-OFF CHANNEL, CANDABA, PAMPANGA | Flood Control Management Cluster | ₱161.0M | Reported complete | EDDMARI CONST | 196 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF PAJO RIVER FLOOD CONTROL, VIRAC, CATANDUANES | Region V | ₱159.3M | Reported complete | HI-TONE CONST | 204 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, LAGO | Region V | ₱159.0M | 64% reported progress | ALRO CONST | 199 | Check in |
| CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA RIVER, UPSTREAM AND DOWNSTREAM OF QUIRINO BRIDGE, QUIRINO, ILOCOS SUR (PHASE 2) | Region I | ₱157.3M | Reported complete | A I P CONST | 20 | Check in |
| Construction of Flood Control Structure along Abra River, Upstream and Down Stream of Quirino Bridge, Quirino, Ilocos Sur (Phase 1) | QUIRINO (ANGKAKI) (ILOCOS SUR), ILOCOS SUR | ₱157.3M | Reported complete | A I P CONST | 22 | Check in |
| Construction of Flood Control Structure along Baroro River, Barangay Bambanay, San Juan, LaUnion | SAN JUAN (LA UNION), LA UNION | ₱154.4M | Reported complete | BALINTUGAN CONST | 34 | Check in |
| Construction of Flood Control Structure along Baroro River, Barangay Bucao, San Gabriel, La Union | SAN GABRIEL (LA UNION), LA UNION | ₱154.4M | Reported complete | ST GERRARD CONST GEN CONTRACTOR & DEVELOPMENT CORP FORMERLY:ST GERRARD CONST | 35 | Check in |
| Construction of Flood Control Structure along Baroro River, Barangay Bacsil, Bacnotan, LaUnion | BACNOTAN (LA UNION), LA UNION | ₱154.4M | Reported complete | RODEKOM GEN CONST AND ENT | 31 | Check in |
| Construction of Flood Control Structure along Baroro River, Barangay Poblacion, San Gabriel, La Union | SAN GABRIEL (LA UNION), LA UNION | ₱154.4M | Reported complete | ST GERRARD CONST GEN CONTRACTOR & DEVELOPMENT CORP FORMERLY:ST GERRARD CONST | 33 | Check in |
| Construction of Flood Control Structure along Baroro River, Barangay Nagsabaran, San Juan, La Union | SAN JUAN (LA UNION), LA UNION | ₱154.4M | Reported complete | ST GERRARD CONST GEN CONTRACTOR & DEVELOPMENT CORP FORMERLY:ST GERRARD CONST | 35 | Check in |
| Construction of Flood Mitigation Structure along Calagdo River, Barangay Tuaca, Basud Camarines Norte | BASUD (CAMARINES NORTE), CAMARINES NORTE | ₱154.4M | Reported complete | PARTIDO CONST & SUPPLY | 196 | Check in |
| Construction of Flood Mitigation Structure along Minasag River, Barangay San Lorenzo and Barangay Rizal, Santa Elena, Camarines Norte | SANTA ELENA (CAMARINES NORTE), CAMARINES NORTE | ₱154.4M | Reported complete | HGG BUILDERS & SUPPLY | 193 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BARANGAY MAMBALITE, DAET, CAMARIN | Region V | ₱149.8M | 89% reported progress | E GARCIA CONST CORP FOR E GARCIA CONST | 182 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG | Region V | ₱149.0M | 78% reported progress | E GARCIA CONST CORP FOR E GARCIA CONST | 177 | Check in |
| CONSTRUCTION OF FLOOD CONTROL ALONG TARLAC RIVER CONTROL LEFT DIKE, SAN ISIDRO SECTION (SEGMENT B), TARLAC CITY, TARLAC | Tarlac DEO | ₱148.5M | Reported complete | L R TIQUI BUILDERS INC | 158 | Check in |
| CONSTRUCTION OF FLOOD CONTROL ALONG TARLAC RIVER CONTROL LEFT DIKE, SAN ISIDRO SECTION (SEGMENT A), TARLAC CITY, TARLAC | Tarlac DEO | ₱148.5M | Reported complete | L R TIQUI BUILDERS INC | 158 | Check in |
| CONSTRUCTION OF DALAGUISEN FLOOD CONTROL STRUCTURE, LAGANGILANG, ABRA | Abra DEO | ₱148.5M | 92% reported progress | MG SAMIDAN CONST | 72 | Check in |
| Construction of Salangsang Flood Control Structure, La Paz, Abra | LA PAZ (ABRA), ABRA | ₱148.5M | Reported complete | MG SAMIDAN CONST | 78 | Check in |
| BASIC INFRASTRUCTURE PROGRAM (BIP); BIP-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE /FACILITIES-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG QUITANGIL RIVER 9PHASE IV), BARANGAY TURU, MAGALANG, PAMPANGA | Pampanga 3rd DEO | ₱148.5M | 96% reported progress | MCB ZAMORA CONST & SUPPLY | 181 | Check in |
| BASIC INFRASTRUCTURE PROGRAM (BIP)-BIP-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATIGIC PUBLIC BUILDINGS/FACILITIES-REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG SACOBIA RIVER, MABALACAT CITY, PAMPANGA | Pampanga 3rd DEO | ₱148.5M | Reported complete | M G SALAZAR CONST CORP FOR M G SALAZAR | 191 | Check in |
| BASIC INFRASTRUCTURE PROGRAM (BIP); BIP-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG QUITANGIL RIVER (PHASE I) BARANGAY ESCALER, MAGALANG, PAMPANGA | Pampanga 3rd DEO | ₱148.5M | 96% reported progress | MCB ZAMORA CONST & SUPPLY | 181 | Check in |
| BASIC INFRASTRUCTURE PROGRAM (BIP); BIP-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG QUITANGIL RIVER (PHASE III), BARANGAY TURU, MAGALANG, PAMPANGA | Pampanga 3rd DEO | ₱148.5M | 98% reported progress | MCB ZAMORA CONST & SUPPLY | 181 | Check in |
| BASIC INFRASTRUCTURE PROGRAM (BIP)-BIP-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATIGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SACOBIA RIVER (PHASE III), MABALACAT CITY, PAMPANGA | Pampanga 3rd DEO | ₱148.5M | Reported complete | M G SALAZAR CONST CORP FOR M G SALAZAR | 191 | Check in |
| BASIC INFRASTRUCTURE PROGRAM (BIP)-BIP-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATIGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SACOBIA RIVER (PHASE IV), MABALACAT CITY, PAMPANGA | Pampanga 3rd DEO | ₱148.5M | Reported complete | MCB ZAMORA CONST | 190 | Check in |
| CONSTRUCTION OF FLOOD CONTROL ALONG AGNO RIVER, SITIO DALUPIRIP PROPER, DALUPIRIP, ITOGON, BENGUET | Cordillera Administrative Region | ₱147.6M | 89% reported progress | MG SAMIDAN CONST | 65 | Check in |
| CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL ALONG AGNO RIVER, SITIO BANAO AND SITIO ADONOT, BARANGAY AMBUKLAO, BOKOD, BENGUET | Cordillera Administrative Region | ₱147.6M | 65% reported progress | UNIVERSAL DE LEON CONST AND AGGREGATES | 55 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL, BARANGAY MANTUGAWE, BASUD, CAMARINES NORTE, BA | Region V | ₱147.1M | 94% reported progress | BRENTMIN ROOFING ENT | 190 | Check in |
| Construction of Aguang Flood Control Structure, Baler, Aurora (Phase II) | BALER (CAPITAL) (AURORA), AURORA | ₱146.7M | Reported complete | PERSAN CONST INC FORMERLY: PERSAN CONST / 4VC BUILDERS & DEVELOPMENT CORP | 94 | Check in |
| CONSTRUCTION OF SABDANG FLOOD CONTROL ALONG BAUANG RIVER BASIN, POBLACION, SABLAN, BENGUET | Benguet 1st DEO | ₱146.7M | Reported complete | MG SAMIDAN CONST | 51 | Check in |
| CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE ALONG SINUCALAN RIVER, PHASE 2, BARANGAY LASIP GRANDE, DAGUPAN CITY, PANGASINAN | Region I | ₱146.6M | 61% reported progress | BET CONST | 106 | Check in |
| CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE ALONG SINUCALAN RIVER, PHASE 2, BARANGAY LASIP CHICO, DAGUPAN CITY, PANGASINAN | Region I | ₱146.6M | 68% reported progress | BET CONST | 106 | Check in |
| CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SANTOL-SAN GABRIEL-KAPANGAN ROAD, MALUYO RIVER, BARANGAY MANGAAN, SANTOL LA UNION | Region I | ₱146.3M | 35% reported progress | ST MATTHEW GEN CONTRACTOR | 24 | Check in |
| CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA RIVER, DOWNSTREAM OF QUIRINO BRIDGE, QUIRINO, ILOCOS SUR | Region I | ₱145.1M | 91% reported progress | A I P CONST | 23 | Check in |
| CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA RIVER, UPSTREAM OF QUIRINO BRIDGE, QUIRINO, ILOCOS SUR | Region I | ₱145.1M | 89% reported progress | A I P CONST | 19 | Check in |
| CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE ALONG AGNO RIVER, BARANGAY PANACOL, AGUILAR, PANGASINAN, PHASE IV | Region I | ₱144.9M | 89% reported progress | ST MATTHEW GEN CONTRACTOR | 123 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL MITIGATION STRUCTURE, BARANGAY GUINACUTAN, VINZ | Region V | ₱144.9M | 89% reported progress | ROAD EDGE TRADING | 180 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL MITIGATION STRUCTURE ALONG CULASI, BARANGAY PAM | Region V | ₱144.9M | 79% reported progress | ROAD EDGE TRADING | 190 | Check in |
| Construction of Flood Control and Drainage Structures (FCDS- Package 6) along Magat River, Santa Lucia Section, Bagabag, Nueva Viscaya | BAGABAG (NUEVA VIZCAYA), NUEVA VIZCAYA | ₱144.8M | Reported complete | EGB CONST CORP FORMERLY: EGB CONST | 18 | Check in |
| Construction of Mega Dike Project along Chico River (Left Bank), Tabuk City, Kalinga | CITY OF TABUK (CAPITAL) (KALINGA), KALINGA | ₱144.8M | Reported complete | JTM CONST / EGB CONST CORP FORMERLY: EGB CONST | 72 | Check in |
| Construction of Flood Control Structure along Tarlac River Left Dike (Segment B), Tarlac | GERONA (TARLAC), TARLAC | ₱144.8M | Reported complete | T2B3 BUILDERS AND SUPPLIES CORP | 151 | Check in |
| Construction of Flood Control Structure along Abra Major River Basin, Barangay San Jose Sur, Manabo, Abra | MANABO (ABRA), ABRA | ₱144.8M | Reported complete | MG SAMIDAN CONST | 56 | Check in |
| Construction of Flood Control and Drainage Structures (FCDS- Package 8) along Magat River, Baretbet Section, Bagabag, Nueva Viscaya | BAGABAG (NUEVA VIZCAYA), NUEVA VIZCAYA | ₱144.8M | Reported complete | EGB CONST CORP FORMERLY: EGB CONST | 23 | Check in |
| Construction of Calabuanan-Buhangin Flood Control, Baler, Aurora | BALER (CAPITAL) (AURORA), AURORA | ₱144.8M | Reported complete | DALCON CONST / EGB CONST CORP FORMERLY: EGB CONST | 96 | Check in |
| Flood Control Works - Diking/Slope Protection of Pasig-Potrero River, Bacolor and Porac, Pampanga | PORAC (PAMPANGA), PAMPANGA | ₱144.8M | Reported complete | FERDSTAR BUILDERS INC | 203 | Check in |
| Construction of Flood Control and Drainage Structures (FCDS- Package 2) along Magat River, Magapuy Section, Bayombong, Nueva Viscaya | BAYOMBONG (CAPITAL) (NUEVA VIZCAYA), NUEVA VIZCAYA | ₱144.8M | Reported complete | EGB CONST CORP FORMERLY: EGB CONST | 43 | Check in |
| Construction of Flood Control Structure along Tarlac River Right Dike (Segment B), Tarlac | CITY OF TARLAC (CAPITAL) (TARLAC), TARLAC | ₱144.8M | Reported complete | T2B3 BUILDERS AND SUPPLIES CORP | 145 | Check in |
| Construction of Flood Control Structure along Tarlac River Right Dike (Segment A), Tarlac | GERONA (TARLAC), TARLAC | ₱144.8M | Reported complete | T2B3 BUILDERS AND SUPPLIES CORP | 145 | Check in |
| Construction of Pudok Flood Control (Phase 2), Tayum, Abra | TAYUM (ABRA), ABRA | ₱144.8M | Reported complete | MG SAMIDAN CONST | 76 | Check in |
| Construction of Flood Control and Drainage Structures (FCDS- Package 7) along Magat River, Magapuy Section, Bayombong, Nueva Viscaya | BAYOMBONG (CAPITAL) (NUEVA VIZCAYA), NUEVA VIZCAYA | ₱144.8M | Reported complete | EGB CONST CORP FORMERLY: EGB CONST | 43 | Check in |
| Construction of Flood Control and Drainage Structures (FCDS- Package 3) along Magat River, Baretbet Section, Bagabag, Nueva Viscaya | BAGABAG (NUEVA VIZCAYA), NUEVA VIZCAYA | ₱144.8M | Reported complete | EGB CONST CORP FORMERLY: EGB CONST | 23 | Check in |
| Construction of Flood Control and Drainage Structures (FCDS- Package 5) along Magat River, Bagahabag Section, Solano, Nueva Viscaya | SOLANO (NUEVA VIZCAYA), NUEVA VIZCAYA | ₱144.8M | Reported complete | EGB CONST CORP FORMERLY: EGB CONST | 34 | Check in |
| Construction of Flood Control Structure along Abra Major River Basin, Barangay Ampalioc, Luba, Abra | LUBA (ABRA), ABRA | ₱144.8M | Reported complete | MG SAMIDAN CONST | 46 | Check in |
| Construction of Flood Control Structure along Tarlac River Left Dike (Segment A), Tarlac | CITY OF TARLAC (CAPITAL) (TARLAC), TARLAC | ₱144.8M | Reported complete | T2B3 BUILDERS AND SUPPLIES CORP | 157 | Check in |
| Construction of Flood Control Structure along Abra Major River Basin, Barangay Lagben, Lagangilang, Abra | LAGANGILANG (ABRA), ABRA | ₱144.8M | Reported complete | MG SAMIDAN CONST | 76 | Check in |
| CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS CONSTRUCTION OF FLOOD CONTROL AND DRAINAGE STRUCTURE (FCDS) ALONG MATUNO RIVER, MANAMTAM SECTION 3, BAMBANG, NUEVA VIZCAYA | Nueva Vizcaya DEO | ₱144.8M | Reported complete | DALCON CONST | 50 | Check in |
| CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS CONSTRUCTION OF FLOOD CONTROL AND DRAINAGE STRUCTURE (FCDS) ALONG MATUNO RIVER, STO. DOMINGO SECTION 4, BAMBANG, NUEVA VIZCAYA | Nueva Vizcaya DEO | ₱144.8M | Reported complete | DALCON CONST | 49 | Check in |
| CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS CONSTRUCTION OF FLOOD CONTROL AND DRAINAGE STRUCTURES (FCDS) ALONG MAGAT RIVER, PAITAN SECTION 1, BAYOMBONG, NUEVA VIZCAYA | Nueva Vizcaya DEO | ₱144.8M | Reported complete | DALCON CONST | 40 | Check in |
| REHABILITATION OF THE FLOOD MITIGATION STRUCTURE ALONG BUED RIVER BASIN, CAMP 1 SECTION, TABAAN SUR, TUBA, BENGUET | Cordillera Administrative Region | ₱144.8M | Reported complete | ARCINUE COMM'L CORP | 79 | Check in |
| CONSTRUCTION OF REVETMENT AND EMBANKMENT OF DIKE AND CHANNELING ALONG CHICO RIVER, TABUK CITY, KALINGA | Cordillera Administrative Region | ₱144.8M | 93% reported progress | OMENGAN CONST | 73 | Check in |
| CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS CONSTRUCTION OF FLOOD CONTROL AND DRAINAGE STRUCTURES (FCDS) ALONG MAGAT RIVER, POGONSINO SECTION 5, BAGABAG, NUEVA VIZCAYA | Nueva Vizcaya DEO | ₱144.8M | Reported complete | DALCON CONST | 27 | Check in |
| CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASIN AND PRINCIPAL RIVERS CONSTRUCTION OF FLOOD CONTROL AND DRAINAGE STRUCTURES (FCDC PACKAGE 1) ALONG MAGAT RIVER, BONFAL PROPER SECTION, BAYOMBONG, NUEVA VIZ | Nueva Vizcaya DEO | ₱144.8M | Reported complete | DALCON CONST | 36 | Check in |
| CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS CONSTRUCTION OF FLOOD CONTROL AND DRAINAGE STRUCTURES (FCDS) ALONG ANGADANAN RIVER, NALUBBUNAN SECTION 2, QUEZON, NUEVA VIZCAYA | Nueva Vizcaya DEO | ₱144.8M | Reported complete | DALCON CONST | 33 | Check in |
| CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG KULASI RIVER (UPSTREAM - DAHAT SECTION) PACKAGE 1, LAGONOY, CAMARINES SUR | Camarines Sur 4th DEO | ₱144.8M | 92% reported progress | HI-TONE CONST & DEVELOPMENT CORP FORMERLY | 199 | Check in |
| CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG LAGONOY RIVER (DOWNSTREAM-GENORANGAN SECTION) PACKAGE 3, LAGONOY, CAMARINES SUR | Camarines Sur 4th DEO | ₱144.8M | Reported complete | CENTERWAYS CONST AND DEVELOPMENT INC | 198 | Check in |
| CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG LAGONOY RIVER (DOWNSTREAM-GENORANGAN SECTION) PACKAGE 4, LAGONOY, CAMARINES SUR | Camarines Sur 4th DEO | ₱144.8M | Reported complete | CENTERWAYS CONST AND DEVELOPMENT INC | 198 | Check in |
| 002: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS CONSTRUCTION OF FLOOD CONTROL AND DRAINAGE STRUCTURE (FCDS PACKAGE 4) AL | Nueva Vizcaya DEO | ₱144.8M | Reported complete | EGB CONST CORP FORMERLY: EGB CONST | 32 | Check in |
| 002: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS CONSTRUCTION OF FLOOD CONTROL AND DRAINAGE STRUCTURE (FCDS PACKAGE 9) ALONG | Nueva Vizcaya DEO | ₱144.8M | Reported complete | EGB CONST CORP FORMERLY: EGB CONST | 32 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF SAN ANTONIO FLOOD CONTROL ALONG ABRA RIVER, SAN ANTONIO, BANGUED, ABRA | Abra DEO | ₱144.8M | Reported complete | MG SAMIDAN CONST | 74 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA MAJOR RIVER BASIN, BARANGAY MUDIIT, DOLOR | Abra DEO | ₱144.8M | 84% reported progress | MG SAMIDAN CONST | 76 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE, CONSTRUCTION OF LINGEY FLOOD CONTROL, LINGEY, BUCLOC, ABRA | Abra DEO | ₱144.8M | Reported complete | MG SAMIDAN CONST | 59 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF BAÑACAO FLOOD CONTROL ALONG ABRA RIVER, BAÑACAO, BANGUED, ABRA | Abra DEO | ₱144.8M | 84% reported progress | MG SAMIDAN CONST | 72 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURE AND DRAINAGE, CONSTRUCTION OF AMPALIOC FLOOD CONTROL, AMPALIOC, LUBA, ABRA | Abra DEO | ₱144.8M | 87% reported progress | MG SAMIDAN CONST | 47 | Check in |
| FLOOD MANAGEMENT PROGRAM-CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM, CONST. OF THE TARLAC CITY URBAN DRAINAGE SYSTEM ALONG MANILA NORTH ROAD, TARLAC CITY (PHASE I), PROVINCE OF TARLAC | Region III | ₱144.8M | Reported complete | NORTHERN BUILDERS | 160 | Check in |
| CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION STRUCTURES ALONG PANGASINAN-NUEVA VISCAYA ROAD, PANGASINAN | Region I | ₱144.7M | Reported complete | E M CUERPO INC | 90 | Check in |
| ORGANIZATIONAL OUTCOME 2 (OO2): PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY ALAWIHAO, DAET, CAMAR | Region V | ₱144.7M | 90% reported progress | EUS CONST | 183 | Check in |
| Construction of Flood Control Structure along Balili River, Barangay Suyo (Package 1), Bagulin, La Union | BAGULIN (LA UNION), LA UNION | ₱144.7M | Reported complete | MG SAMIDAN CONST / KRYPTONITE 6S BUILDERS INC | 41 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LABO RIVER (DOWNSTREAM), BARANGAY MATANLANG, LABO, CAMARINES NORTE (PACKAGE IV), BRGY. MATANLANG, LABO, CAMARINES NORTE | Camarines Norte DEO | ₱144.7M | Reported complete | CENTERWAYS CONST AND DEVELOPMENT INC | 184 | Check in |
| CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP): SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF FLOOD CONTROL, BARANGAY MOCONG, BASUD, CAMARINES NORTE (P | Region V | ₱144.7M | 51% reported progress | EUS CONST | 185 | Check in |
| CONSTRUCTION OF FLOOD CONTROL, BARANGAY MABILO I - MABILO II, LABO, CAMARINES NORTE (PACKAGE 3), BRGY. MABILO I - MABILO II, LABO, CAMARINES NORTE | Camarines Norte DEO | ₱144.7M | 83% reported progress | CENTERWAYS CONST AND DEVELOPMENT INC | 183 | Check in |
| Construction of Flood Control Structure along Aringay River, Barangay San Juan West, Aringay, La Union | ARINGAY (LA UNION), LA UNION | ₱144.7M | Reported complete | ROCK-WBL CONST CORP FOR: ROCK-WBL CONST TRADING & SERVICES | 63 | Check in |
| Construction of Flood Control Structure Along Aringay River, Barangay Anduyan, Tubao, La Union | TUBAO (LA UNION), LA UNION | ₱144.7M | Reported complete | RODEKOM GEN CONST AND ENT | 68 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LABO RIVER (DOWNSTREAM), BARANGAY MATANLANG, LABO, CAMARINES NORTE (PACKAGE II), BRGY. MATANLANG, LABO, CAMARINES NORTE | Camarines Norte DEO | ₱144.7M | Reported complete | CENTERWAYS CONST AND DEVELOPMENT INC | 184 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LABO RIVER (DOWNSTREAM), BARANGAY MATANLANG, LABO, CAMARINES NORTE (PACKAGE III), BRGY. MATANLANG, LABO, CAMARINES NORTE | Camarines Norte DEO | ₱144.7M | Reported complete | CENTERWAYS CONST AND DEVELOPMENT INC | 184 | Check in |
| Construction of Flood Control Structure Along Aringay River, Barangay Rizal, Tubao, La Union | TUBAO (LA UNION), LA UNION | ₱144.7M | Reported complete | RODEKOM GEN CONST AND ENT | 67 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BUSIGON RIVER AT MATANLANG-MABILO II, LABO, CAMARINES NORTE (PHASE 5), BRGY. MATANLANG, LABO, CAMARINES NORTE | Camarines Norte DEO | ₱144.7M | 74% reported progress | WAYCON BUILDERS AND CONST SUPPLY CORP FOR:WAYCON BUILDERS | 184 | Check in |
| Construction of Flood Control Structure Along Aringay River, Barangay Halog East, Tubao, La Union | TUBAO (LA UNION), LA UNION | ₱144.7M | Reported complete | RODEKOM GEN CONST AND ENT | 68 | Check in |
| Construction of Flood Mitigation Structure along Peñaranda River, Barangay San Vicente, Gapan City, Nueva Ecija | CITY OF GAPAN (NUEVA ECIJA), NUEVA ECIJA | ₱144.7M | Reported complete | R A PAHATI CONST & SUPPLY INC | 169 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BUSIGON RIVER AT MATANLANG-MABILO II, LABO, CAMARINES NORTE (PHASE 6), BRGY. MATANLANG, LABO, CAMARINES NORTE | Camarines Norte DEO | ₱144.7M | 76% reported progress | WAYCON BUILDERS AND CONST SUPPLY CORP FOR:WAYCON BUILDERS | 184 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PAMPANGA RIVER, BARANGAY POBLACION NORTE, MUNICIPALITY OF RIZAL, NUEVA ECIJA | Nueva Ecija 1st DEO | ₱144.7M | 95% reported progress | R A PAHATI CONST | 121 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MATOGDON RIVER, BARANGAY LUGUI, LABO, CAMARINES NORTE (PACKAGE II), BRGY. LUGUI, LABO, CAMARINES NORTE | Camarines Norte DEO | ₱144.7M | Reported complete | CENTERWAYS CONST AND DEVELOPMENT INC | 187 | Check in |
| Construction of Deet-Pudok Flood Control Structure, Tayum, Abra | TAYUM (ABRA), ABRA | ₱144.7M | Reported complete | MG SAMIDAN CONST | 76 | Check in |
| Construction of Toon-San Gregorio Flood Control Structure, La Paz, Abra | LA PAZ (ABRA), ABRA | ₱144.7M | Reported complete | 739 BUILDERS | 75 | Check in |
| Construction of Naguillan Flood Control Structure, La Paz, Abra | LA PAZ (ABRA), ABRA | ₱144.7M | Reported complete | MG SAMIDAN CONST / RM30 PSG CONST CORP | 75 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF BAAY FLOOD CONTROL , LICUAN-BAAY, ABRA | Abra DEO | ₱144.7M | 93% reported progress | MG SAMIDAN CONST | 70 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF ABANG FLOOD CONTROL ALONG ABRA RIVER, ABANG, BUCAY, ABRA | Abra DEO | ₱144.7M | 95% reported progress | MG SAMIDAN CONST | 65 | Check in |
| LOCAL PROGRAM-CONST./REP./REHAB./IMPR'VT. OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS-FLOOD CONTROL & DRAINAGE-FLOOD CONTROL STRUCTURES/FACILITIES-CONST./REHAB./CONST. OF FLOOD CONTROL STRUCTURES ALONG RIO CHICO RIVER, BRGY. MACARSE, ZARAGOSA, N.E. | Region III | ₱144.7M | Reported complete | R D TALENS CONST AND TRADING | 162 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEM (PACKAGE 2), DAGUPAN CITY, PANGASINAN | Region I | ₱144.7M | Reported complete | HIGH ROCK CONST AND SUPPLIES INC | 106 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY QUILLAT, LANGIDEN, | Abra DEO | ₱144.7M | 93% reported progress | MG SAMIDAN CONST | 69 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), CONSTRUCTION OF FLOOD CONTROL STRUCTURE, SITIO PARATONG, BARANGAY POBLACION, BACNOTAN, LA UNION | Region I | ₱144.7M | 73% reported progress | SILVERWOLVES CONST CORP | 29 | Check in |