BASIC INFRASTRUCTURE PROGRAM (BIP); BIP-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG QUITANGIL RIVER (PHASE III), BARANGAY TURU, MAGALANG, PAMPANGA
BASIC INFRASTRUCTURE PROGRAM (BIP); BIP-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG QUITANGIL RIVER (PHASE III), BARANGAY TURU, MAGALANG, PAMPANGA is a DPWH-tracked public work in Pampanga 3rd DEO, Region III. Reported contract value: ₱148,479,230.79. Status: Past target date (DPWH On-Going). Contractor on record: MCB ZAMORA CONST & SUPPLY 32006. Figures trace to dpwh.
Satellite images processing — before/after tiles will appear here after the next batch run.
Total Contract Cost