Flood Control and Drainage17Z00005

REHABILITATION OF DIKE SYSTEM ALONG CURA-LABUGAON RIVER (BREACHED AND ERODED DIKE, LEFT AND RIGHT BANK) LAOAG RIVER BASIN FLOOD CONTROL AND SABO PROJECT

REHABILITATION OF DIKE SYSTEM ALONG CURA-LABUGAON RIVER (BREACHED AND ERODED DIKE, LEFT AND RIGHT BANK) LAOAG RIVER BASIN FLOOD CONTROL AND SABO PROJECT is a DPWH-tracked public work in Flood Control Management Cluster, Central Office. Reported contract value: ₱862,000,881.74. Status: Reported complete (DPWH). Contractor on record: TOKWING CONST CORP FOR TOKWING CONSTRUC. Figures trace to dpwh.

Flood Control Management Cluster, Central Office
Region: Central Office

Follow the peso

1 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 17Z00005 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2017-01-16 → 2021-09-27

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

High flood hazard · Ilocos Norte

Based on the coordinates published with the DPWH record and NOAH file IlocosNorte.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: REHABILITATION OF DIKE SYSTEM ALONG CURA-LABUGAON RIVER (BREACHED AND ERODED DIKE, LEFT AND RIGHT BANK) LAOAG RIVER BASIN FLOOD CONTROL AND SABO PROJECT

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2017 GAA. DBM GAA FY2017

2. Allotment

No matching SARO/NCA release found for this project. Source: DBM SARO/NCA listings.

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

66 projects · ₱11.2B total · 0 flags

Other projects by this contractor

CONSTRUCTION OF SMALL RIVER IMPOUNDING PROJECT (SRIP) ANDDRAINAGE SYSTEMS ALONG THE FOLLOWING RIVERS;A.) CADCADIR RIVER, BRGY. BACSAY CATARAOAN SUR, CLAVERIA, CAGAYANB.) CADCADIR RIVER, BRGYS. UNION AND CADCADIR, CLAVERIA, CAGAYANC.) CABICUNGAN RI

Flood Control Management Cluster, Central Office

2023₱1.4B
Reported complete (100% progress, DPWH status On-Going)

CONSTRUCTION OF BANK PROTECTION WORKS ALONG CAGAYAN RIVER AT IGUIG, CAGAYAN AND AGGUNETAN, LASAM, CAGAYAN

Flood Control Management Cluster, Central Office

2019₱945.5M
Reported complete (100% progress, DPWH status On-Going)
No sat.

REHABILITATION OF DIKE SYSTEM ALONG MADONGAN RIVER (BREACHED AND ERODED DIKE, LEFT AND RIGHT BANK), LAOAG RIVER BASIN FLOOD CONTROL AND SABO PROJECT

Flood Control Management Cluster, Central Office

2017₱862.9M
Reported complete (DPWH)

PASIG MARIKINA RIVER CHANNEL IMPROVEMENT PROJECT, PHASE V, CONTRACT PACKAGE 6 - RIVER IMPROVEMENT WORKS ALONG UPPER MARIKINA RIVER (UPSTREAM OF MARIKINA BRIDGE) STA. 17+450 TO STA. 18+130, LEFT AND RIGHT BANKS, MARIKINA CITY

Flood Control Management Cluster, Central Office

2017₱689.3M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF SMALL RIVER IMPOUNDING PROJECT (SRIP) AT PAPA RIVER, BRGY. STO. NIÑO, NUEVA ERA, ILOCOS NORTE

Flood Control Management Cluster, Central Office

2019₱533.8M
Past target date (DPWH On-Going)

METRO MANILA FLOOD MANAGEMENT PROJECT, PHASE I, REHABILITATION WORKS FOR BALUT PUMPING STATION

Flood Control Management Cluster, Central Office

2018₱390.9M
Reported complete (DPWH)
View all 66 projects →

4. Implementation

Contract Amount

₱862,000,881.74

Progress

Reported complete (DPWH)

Start Date

October 13, 2017

Target End

November 25, 2020

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region I (Ilocos Region)Ilocos NorteDingrasLumbad
Storms whose wind field reached it
Peilou 2026Noul 2026Fung-Wong 2025Matmo 2025Ragasa 2025
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.