3,672 DPWH flood-control projects worth ₱162.13B sit within 300 km of this storm’s track. Peak sustained wind 144 kt (267 km/h, 1-minute average). Being on this list says nothing about a project’s quality. It is where photos after the storm are most useful.

Send a check-in photo

Track and projects

Red line: storm centre (best track). Shaded band: 300 km around the track (median 34-kt wind radius near the Philippines, or 100 km where radii were not reported). Blue dots: projects with DPWH coordinates.

Projects in path

3,672

Contract value

₱162.13B

Reported complete

2,926

Ongoing or not reported

746

Largest contractors in the path

  1. MG SAMIDAN CONST107 · ₱11.61B
  2. JWU CONST AND SUPPLY102 · ₱9.38B
  3. EGB CONST CORP FORMERLY: EGB CONST106 · ₱5.89B
  4. TOKWING CONST CORP FOR TOKWING CONSTRUC6 · ₱5.02B
  5. MEGAPOLITAN BUILDERS AND CONST SUPPLY104 · ₱4.70B
  6. RAYMAN BUILDERS INC4 · ₱3.79B
  7. ST TIMOTHY CONST CORP64 · ₱3.54B
  8. 739 BUILDERS79 · ₱3.38B
  9. MAV CONST SUPPLY AND POWER DEVELOPMENT35 · ₱3.01B
  10. BJMJB CONST105 · ₱2.60B

By DPWH implementing office

  1. ISABELA244 · ₱15.37B
  2. Ilocos Norte 1st DEO610 · ₱14.87B
  3. Abra DEO217 · ₱14.15B
  4. Flood Control Management Cluster14 · ₱11.65B
  5. Isabela 3rd DEO149 · ₱10.55B
  6. ILOCOS NORTE193 · ₱9.53B
  7. ABRA105 · ₱7.65B
  8. CAGAYAN157 · ₱6.95B
  9. Region I99 · ₱5.74B
  10. Isabela 4th DEO91 · ₱5.64B
  11. Isabela 2nd DEO95 · ₱5.30B
  12. ILOCOS SUR135 · ₱4.39B

Satellite before and after

Largest projects in the path with archived imagery. Imagery dates are before and after the contract, not the storm. They are not proof of completion.

Imagery © Esri, Maxar, Earthstar Geographics, and the GIS User Community (World Imagery Wayback).

Projects to check (largest 1,500 of 3,672)

Near one of these? Open the project and use “Check in” to add a dated photo. Faces and plates are blurred automatically.

ProjectPlaceCostStatusContractorkm from track
CONSTRUCTION OF SMALL RIVER IMPOUNDING PROJECT (SRIP) ANDDRAINAGE SYSTEMS ALONG THE FOLLOWING RIVERS;A.) CADCADIR RIVER, BRGY. BACSAY CATARAOAN SUR, CLAVERIA, CAGAYANB.) CADCADIR RIVER, BRGYS. UNION AND CADCADIR, CLAVERIA, CAGAYANC.) CABICUNGAN RIFlood Control Management Cluster₱1.45BReported completeTOKWING CONST CORP FOR TOKWING CONSTRUC77Check in
CONSTRUCTION OF BANK PROTECTION WORKS ALONG CAGAYAN RIVER (SECTION B) AT GATTARAN , CAGAYANFlood Control Management Cluster₱1.10BReported completeRAYMAN BUILDERS INC158Check in
CONSTRUCTION OF BANK PROTECTION WORKS ALONG CAGAYAN RIVER (SECTION A) AT GATTARAN, CAGAYANFlood Control Management Cluster₱1.04BReported completeR-II BUILDERS INC159Check in
CONSTRUCTION OF BANK PROTECTION WORKS ALONG CAGAYAN RIVER AT IGUIG, CAGAYAN AND AGGUNETAN, LASAM, CAGAYANFlood Control Management Cluster₱945.5MReported completeTOKWING CONST CORP FOR TOKWING CONSTRUC188Check in
CONSTRUCTION OF BANK PROTECTION WORKS ALONG TUGUEGARAO RIVER AT CAGGAY, TUGUEGARAO CITY, CAGAYANFlood Control Management Cluster₱931.7MReported completeRAYMAN BUILDERS INC195Check in
RIVER IMPROVEMENT WORKS ALONG CAGAYAN RIVER, BUNTUN BRIDGE, TUGUEGARAO AND SOLANA AT STA. 3+950 TO STA. 5+800 AND SLOPE PROTECTION WORKS FOR BUNTUN BRIDGE, RIGHT BANK STA. 0+042 TO STA. 0+410, TUGUEGARAO CITY, CAGAYANFlood Control Management Cluster₱907.5MReported completeRAYMAN BUILDERS INC197Check in
REHABILITATION OF DIKE SYSTEM ALONG MADONGAN RIVER (BREACHED AND ERODED DIKE, LEFT AND RIGHT BANK), LAOAG RIVER BASIN FLOOD CONTROL AND SABO PROJECTFlood Control Management Cluster₱862.9MReported completeTOKWING CONST CORP FOR TOKWING CONSTRUC151Check in
REHABILITATION OF DIKE SYSTEM ALONG CURA-LABUGAON RIVER (BREACHED AND ERODED DIKE, LEFT AND RIGHT BANK) LAOAG RIVER BASIN FLOOD CONTROL AND SABO PROJECTFlood Control Management Cluster₱862.0MReported completeTOKWING CONST CORP FOR TOKWING CONSTRUC148Check in
CONSTRUCTION / ADDITIONAL FLOOD CONTROL STRUCTURE ALONG ABRA RIVER, MUNICIPALITIES OF BUCAY, LANGIDEN, TAYUM, SALLAPADAN, LAGANGILANG, MANABO, AND LA PAZ ABRAFlood Control Management Cluster₱853.1MReported completeRAYMAN BUILDERS INC219Check in
CONSTRUCTION/REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG UGUIS RIVER, BRGY. UGUIS AND ALONG TIBANGRAN RIVER, BRGY. BARANGOBONG, MUNICIPALITY OF NUEVA ERA, ILOCOS NORTEFlood Control Management Cluster₱715.1M94% reported progressMSB VITUG CONST173Check in
REHABILITATION OF DIKE SYSTEM ALONG SOLSONA RIVER (BREACHED AND ERODED DIKE, LEFT AND RIGHT BANK), LAOAG RIVER BASIN FLOOD CONTROL AND SABO PROJECTFlood Control Management Cluster₱669.3MReported completeE M CUERPO INC151Check in
CONSTRUCTION OF SMALL RIVER IMPOUNDING PROJECT (SRIP) AT PAPA RIVER, BRGY. STO. NIÑO, NUEVA ERA, ILOCOS NORTEFlood Control Management Cluster₱533.8M94% reported progressTOKWING CONST CORP FOR TOKWING CONSTRUC164Check in
CONSTRUCTION OF BANK PROTECTION WORKS ALONG CHICO RIVER AT PIAT. AND TUAO, CAGAYANFlood Control Management Cluster₱415.9M90% reported progressJ D LEGASPI CONST182Check in
CONSTRUCTION/REHABILITATION OF BOLO RIVER DAM, BRGY. SAN ISIDRO, DUMALNEG, ILOCOS NORTEFlood Control Management Cluster₱366.6MReported completeTOKWING CONST CORP FOR TOKWING CONSTRUC100Check in
Construction of Shoreline Protection (Groins) along Santa Catalina, Ilocos SurSANTA CATALINA (ILOCOS SUR), ILOCOS SUR₱241.2MReported completeA P B CONST / EGB CONST CORP FORMERLY: EGB CONST211Check in
Construction of Flood Control Mitigation Facilities along Amburayan River Basin at Barangays Bucao West, Bucao East, Lantag, Baritao and Tarangotong, Tagudin, Ilocos SurTAGUDIN (ILOCOS SUR), ILOCOS SUR₱241.2MReported completeA P B CONST / EGB CONST CORP FORMERLY: EGB CONST282Check in
Construction of Flood Control Structure along Bislak River, Upstream and Downstream, Leftside of Vintar Bridge, Brgy. Abkir-Alviar, Vintar, Ilocos NorteVINTAR (ILOCOS NORTE), ILOCOS NORTE₱211.3MReported completeJOZEN BUILDERS AND CONST SUPPLY CORP / EGB CONST CORP FORMERLY: EGB CONST134Check in
BASIC INFRASTRUCTURE PROGRAM (BIP), CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG QUIAOIT RIVER (CONSTRUCTION OF DIVERSION CHANNEL), PAOAY, ILOCOS NORTE (PACKAGE B)Region I₱198.0MReported completeALPHA157Check in
BASIC INFRASTRUCTURE PROGRAM (BIP), CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG QUIAOIT RIVER (CONSTRUCTION OF DIVERSION CHANNEL), BATAC, ILOCOS NORTE (PACKAGE B)Region I₱198.0M95% reported progressKATHA BUILDERS & SUPPLIES INC157Check in
CONSTRUCTION / REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF LENGTAN FLOOD CONTROL ALONG CHICO RIVER, SAMOKI, BONTOC, MOUNTAIN PROVINCECordillera Administrative Region₱193.0M90% reported progressBALINTUGAN CONST256Check in
Rehabilitation/Improvement of Samac SWIP, Bugnay SWIP, Bingao SWIP Small Water Impounding Projects Barangays Sta. Asuncion, San Agustin, San Pedro, San Nicolas, Ilocos NorteSAN NICOLAS (ILOCOS NORTE), ILOCOS NORTE₱193.0MReported completeBADOC BUILDERS & SUPPLY INC FORMERLY: BADOC BUILDER & SUPPLY / ST GERRARD CONST GEN CONTRACTOR & DEVELOPMENT CORP FORMERLY:ST GERRARD CONST147Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION WORKS FOR CAGAYAN RIVER BASIN, SIFFU RIVER AT SAN PLACIDO, RORegion II₱191.0M88% reported progressR S K M CONST SERVICES251Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION WORKS FOR CAGAYAN RIVER BASIN, ILAGAN RIVER AT AGGASIAN, ILAGRegion II₱190.8M93% reported progressEGB CONST CORP FORMERLY: EGB CONST253Check in
CONSTRUCTION OF FLOOD CONTROL STRUCTURE, PINTO STA.31+800 - STA. 33+650 (L/S) ALFONSO LISTA, IFUGAOCordillera Administrative Region₱190.0M50% reported progressDJY CONST266Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF TUGUEGARAO CIRCUMFERENTIAL DIKE ROAD, TUGUEGARARegion II₱183.0MReported completeDOUBLE J1908 CONST198Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION WORKS FOR CAGAYAN RIVER BASIN, CAGAYAN RIVER AT ALICAOCAO, CARegion II₱182.6M72% reported progressJOMARCANN GEN CONST271Check in
CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, LAOAG-SAN NICOLAS BYPASS ROAD (SAN NICOLAS SECTION), ILOCOS NORTERegion I₱173.0MReported completeBADOC BUILDERS143Check in
CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA RIVER, UPSTREAM AND DOWNSTREAM OF QUIRINO BRIDGE, QUIRINO, ILOCOS SUR (PHASE 2)Region I₱157.3MReported completeA I P CONST256Check in
Construction of Flood Control Structure along Abra River, Upstream and Down Stream of Quirino Bridge, Quirino, Ilocos Sur (Phase 1)QUIRINO (ANGKAKI) (ILOCOS SUR), ILOCOS SUR₱157.3MReported completeA I P CONST254Check in
CONSTRUCTION OF DALAGUISEN FLOOD CONTROL STRUCTURE, LAGANGILANG, ABRAAbra DEO₱148.5M92% reported progressMG SAMIDAN CONST205Check in
Construction of Salangsang Flood Control Structure, La Paz, AbraLA PAZ (ABRA), ABRA₱148.5MReported completeMG SAMIDAN CONST198Check in
CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA RIVER, DOWNSTREAM OF QUIRINO BRIDGE, QUIRINO, ILOCOS SURRegion I₱145.1M91% reported progressA I P CONST253Check in
CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA RIVER, UPSTREAM OF QUIRINO BRIDGE, QUIRINO, ILOCOS SURRegion I₱145.1M89% reported progressA I P CONST257Check in
Construction of Mega Dike Project along Chico River (Left Bank), Tabuk City, KalingaCITY OF TABUK (CAPITAL) (KALINGA), KALINGA₱144.8MReported completeJTM CONST / EGB CONST CORP FORMERLY: EGB CONST216Check in
Construction of Flood Control Structure along Abra Major River Basin, Barangay San Jose Sur, Manabo, AbraMANABO (ABRA), ABRA₱144.8MReported completeMG SAMIDAN CONST220Check in
Construction of Pudok Flood Control (Phase 2), Tayum, AbraTAYUM (ABRA), ABRA₱144.8MReported completeMG SAMIDAN CONST200Check in
Construction of Flood Control Structure along Abra Major River Basin, Barangay Ampalioc, Luba, AbraLUBA (ABRA), ABRA₱144.8MReported completeMG SAMIDAN CONST230Check in
Construction of Flood Control Structure along Abra Major River Basin, Barangay Lagben, Lagangilang, AbraLAGANGILANG (ABRA), ABRA₱144.8MReported completeMG SAMIDAN CONST200Check in
CONSTRUCTION OF REVETMENT AND EMBANKMENT OF DIKE AND CHANNELING ALONG CHICO RIVER, TABUK CITY, KALINGACordillera Administrative Region₱144.8M93% reported progressOMENGAN CONST216Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF SAN ANTONIO FLOOD CONTROL ALONG ABRA RIVER, SAN ANTONIO, BANGUED, ABRAAbra DEO₱144.8MReported completeMG SAMIDAN CONST202Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA MAJOR RIVER BASIN, BARANGAY MUDIIT, DOLORAbra DEO₱144.8M84% reported progressMG SAMIDAN CONST200Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE, CONSTRUCTION OF LINGEY FLOOD CONTROL, LINGEY, BUCLOC, ABRAAbra DEO₱144.8MReported completeMG SAMIDAN CONST217Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF BAÑACAO FLOOD CONTROL ALONG ABRA RIVER, BAÑACAO, BANGUED, ABRAAbra DEO₱144.8M84% reported progressMG SAMIDAN CONST204Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURE AND DRAINAGE, CONSTRUCTION OF AMPALIOC FLOOD CONTROL, AMPALIOC, LUBA, ABRAAbra DEO₱144.8M87% reported progressMG SAMIDAN CONST229Check in
Construction of Deet-Pudok Flood Control Structure, Tayum, AbraTAYUM (ABRA), ABRA₱144.7MReported completeMG SAMIDAN CONST201Check in
Construction of Toon-San Gregorio Flood Control Structure, La Paz, AbraLA PAZ (ABRA), ABRA₱144.7MReported complete739 BUILDERS201Check in
Construction of Naguillan Flood Control Structure, La Paz, AbraLA PAZ (ABRA), ABRA₱144.7MReported completeMG SAMIDAN CONST / RM30 PSG CONST CORP201Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF BAAY FLOOD CONTROL , LICUAN-BAAY, ABRAAbra DEO₱144.7M93% reported progressMG SAMIDAN CONST207Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF ABANG FLOOD CONTROL ALONG ABRA RIVER, ABANG, BUCAY, ABRAAbra DEO₱144.7M95% reported progressMG SAMIDAN CONST211Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY QUILLAT, LANGIDEN,Abra DEO₱144.7M93% reported progressMG SAMIDAN CONST207Check in
CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL MITIGATION FACILITIES ALONG AMBURAYAN RIVER BASIN, BRGY. JARDIN - TARANGOTONG, TAGUDIN, ILOCOS SUR, STA 8+118 - STA 9Region I₱144.7MReported completeGEMMA CONST SUPPLY INC FORMERLY:GEMMA CON280Check in
Construction of Magat River Flood Control Project, Barangay Turod, Reina Mercedes, IsabelaREINA MERCEDES (ISABELA), ISABELA₱144.7MReported completeROAD EDGE TRADING & DEVELOPMENT SERVICES / MAV CONST SUPPLY AND POWER DEVELOPMENT264Check in
Construction of Flood Control Structure along Abra Major River Basin, Barangay Nagtupacan, Dolores, AbraDOLORES (ABRA), ABRA₱144.7MReported completeMG SAMIDAN CONST199Check in
ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF SLOPE PROTECTION STRUIsabela 2nd DEO₱144.7MReported completeJWU CONST AND SUPPLY271Check in
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF BALLACAYU FLOOD CONTROL SYSTEMIsabela 1st DEO₱144.7MReported completeDRAGON TWELVE BUILDERS211Check in
OO2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/ REHAB OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG CAGAYAN RIVER, PACKAGE 2, GUIBANG,Isabela 3rd DEO₱144.7M94% reported progressJWU CONST AND SUPPLY259Check in
OO2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG CAGAYAN RIVER, TALLUNGANIsabela 3rd DEO₱144.7M90% reported progressJWU CONST AND SUPPLY268Check in
OO2:PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG CAGAYAN RIVER, TALLUNGAN SEIsabela 3rd DEO₱144.7M91% reported progressJWU CONST AND SUPPLY268Check in
OO2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG CAGAYAN RIVER, BUENAVISTAIsabela 3rd DEO₱144.7MReported completeROAD EDGE TRADING & DEVELOPMENT SERVICES257Check in
OO2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG CAGAYAN RIVER, DAMMAO SECIsabela 3rd DEO₱144.7M86% reported progressROAD EDGE TRADING & DEVELOPMENT SERVICES257Check in
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF GUMBAUAN FLOOD CONTROL STRUCTURE, STA. 0+000 - STA. 0Isabela 4th DEO₱144.7M81% reported progressJWU CONST AND SUPPLY293Check in
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF GUMBAUAN FLOOD CONTROL STRUCTURE, STA. 0+305 - STA. 0Isabela 4th DEO₱144.7M73% reported progressJWU CONST AND SUPPLY293Check in
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SINABBARAN FLOOD CONTROL STRUCTURE, STA. 0+305 - STA.Isabela 4th DEO₱144.7M49% reported progressJWU CONST AND SUPPLY295Check in
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS- FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONSTRUCTION OF FLOOD MITIGATION STRUCTUREIsabela 1st DEO₱144.7M98% reported progressDRAGON TWELVE BUILDERS253Check in
Construction of Slope Protection Works for Cagayan River Basin, Cagayan River, Santa Maria, IsabelaSANTA MARIA (ISABELA), ISABELA₱144.7MReported completeDRAGON TWELVE BUILDERS & CONST SUPPLY215Check in
Construction of Flood Mitigation Structure along Magat River, Turod Section, Reina Mercedes, Isabela Package 2REINA MERCEDES (ISABELA), ISABELA₱144.7MReported completeROAD EDGE TRADING & DEVELOPMENT SERVICES264Check in
Construction of Flood Mitigation Structure along Cagayan River, Package 2, Barangay District 2, Gamu, IsabelaGAMU (ISABELA), ISABELA₱144.7MReported completeROAD EDGE TRADING & DEVELOPMENT SERVICES / HIGH ROAD CONST SERVICES260Check in
Construction of Flood Mitigation Structure along Cagayan River, Package 1, Barangay District 2, Gamu, IsabelaGAMU (ISABELA), ISABELA₱144.7MReported completeROAD EDGE TRADING & DEVELOPMENT SERVICES / HIGH ROAD CONST SERVICES259Check in
Construction of Poblacion-Deet Flood Control along Abra River, Tayum, AbraTAYUM (ABRA), ABRA₱144.7MReported completeMG SAMIDAN CONST / TWINFORMERS CONST SERVICES201Check in
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF COMPANIA FLOOD CONTROL,Isabela 1st DEO₱144.7MReported completeARVEA'S CONST236Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF MUDIIT FLOOD CONTROL ALONG ABRA RIVER, MUDIIT, DOLORES, ABRAAbra DEO₱144.6M92% reported progressMG SAMIDAN CONST200Check in
Construction of Flood Mitigation Structure along Magat River, Turod Section, Reina Mercedes, Isabela Package 1REINA MERCEDES (ISABELA), ISABELA₱144.5MReported completeA DE GUIA CONST AND DEVELOPMENT CORP FORMERLY: A DE GUIA CONST264Check in
FLOOD MANAGEMENT PROGRAM -CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF MINANTE 1 FLOOD CONTROL STRUCTURE, PHASE 2, BARANGAY MINANTE 1, CAUAYAN CITY, ISABELAIsabela 4th DEO₱144.4M81% reported progressEDDMARI CONST275Check in
OO2:PROTECT LIVES & PROP AGAINST MAJOR FLOODS-FLOOD MNGT PROG-CONS/ REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJ RIVER BASINS & PRINCIPAL RIVERS-CONS OF APAYAO-ABULUG RIVER BASIN FC STRUCTURE,BAROCBOC-SAN MARIANO SECTION,STA.21+426-STA.22+002(L/S),STA. MApayao 2nd DEO₱143.9MReported completeISNAG BUILDERS & DEV'T CORP123Check in
OO2:PROTECT LIVES & PROP AGAINST MAJOR FLOODS-FLOOD MNGT PROG- CONS/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONS OF APAYAO-ABULUG RIVER BASIN FLOOD CTRL STRUCT, SAN MARIANO SECTION, STA.23+808-STA.24+384(R/S)Apayao 2nd DEO₱143.9M98% reported progressISNAG BUILDERS & DEV'T CORP124Check in
OO2:PROTECT LIVES & PROP AGAINST MAJOR FLOODS-FLOOD MNGT PROG-CONS/ REHAB OF FLOOD MITIGATION FACI W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONS OF APAYAO-ABULUG RIVER BASIN FLOOD CTRL STRUCTURE,BAROCBOC-SAN MARIANO SEC,STA.22+002-STA.22+578(R/S)Apayao 2nd DEO₱143.9MReported completeISNAG BUILDERS & DEV'T CORP123Check in
Construction of Gen. E. Batalla Flood Control Structure, Sta. 0 + 000 - Sta. 0 + 550, Camalaniugan, CagayanCAMALANIUGAN (CAGAYAN), CAGAYAN₱143.9MReported completeGVDPM CONST CORP FORMERLY: ZM CONSTRUCTIO127Check in
OO2:PROTECT LIVES AND PROP AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROG-CONS/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONS OF APAYAO-ABULUG RIVER BASIN FLOOD CTRL STRUCTURE, BAGUTONG SEC,STA.29+205-STA.29+760(R/S)Apayao 2nd DEO₱142.9MReported completeISNAG BUILDERS & DEV'T CORP128Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA MAJOR RIVER BASIN, BARANGAY PALAQUIO, BUCAbra DEO₱142.8M96% reported progressMG SAMIDAN CONST207Check in
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF SLOPE PROTECTION WORKS FOIsabela 4th DEO₱142.6MReported completeEGB CONST CORP FORMERLY: EGB CONST270Check in
CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG QUIAOIT RIVER, DOWNSTREAM, PHASE 1, ALWINALDO BRIDGE, BARANGAY MAIPALIG, BATAC CITY, ILOCOS NORTEIlocos Norte 2nd DEO₱141.9M75% reported progressMEGAPOLITAN BUILDERS AND CONST SUPPLY164Check in
CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG QUIAOIT RIVER, DOWNSTREAM, PHASE 2, ALWINALDO BRIDGE, BARANGAY MAIPALIG, BATAC CITY, ILOCOS NORTEIlocos Norte 2nd DEO₱141.9M72% reported progressMEGAPOLITAN BUILDERS AND CONST SUPPLY164Check in
OO2: PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROG-CONS/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONS OF FLOOD CONTROL STRUCT ,APAYAO-ABULUG RIVER BASIN,SWAN SECTION, STA. 36+566-STA. 37+121Apayao 2nd DEO₱141.8M74% reported progressISNAG BUILDERS & DEV'T CORP132Check in
OO 2: PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONS/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONS OF FLOOD CONTROL STRUCTURE, APAYAO-ABULUG RIVER BASIN, STA. LINA SEC., STA.22+515-STAApayao 2nd DEO₱141.8M70% reported progressISNAG BUILDERS & DEV'T CORP121Check in
OO2:PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MNGT PROG-CONS/REHAB OF FLOOD MITIGATION FACI W/IN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONS OF APAYAO-ABULUG RIVER BASIN FLOOD CONTROL STRUCTURE,CAPANNIKIAN SECTION,STA.33+885-STA. 34+440(L/S),Apayao 2nd DEO₱141.8M81% reported progressISNAG BUILDERS & DEV'T CORP129Check in
CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MADUNGON RIVER, BARANGAY STA. ANA, SOLSONA, ILOCOS NORTEIlocos Norte 2nd DEO₱141.4M61% reported progressEUS CONST152Check in
Construction of Catotoran Norte Flood Control Structure, Sta. 0 + 000 - Sta. 0 + 130, Sta. 0+00 - Sta. 0+057, Sta. 0+000 - Sta. 0+200, Camalaniugan, CagayanCAMALANIUGAN (CAGAYAN), CAGAYAN₱141.1MReported completeGVDPM CONST CORP FORMERLY: ZM CONSTRUCTIO122Check in
SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), REHABILITATION OF FLOOD CONTROL STRUCTURE, DRAINAGE STRUCTURE AND SMALL WATER IMPOUNDING PROJECT (SWIP), BARANGAY 20, SAN PABLO, SAN NICOLAS, ILOCOS NORTERegion I₱140.4M0% reported progressA B TAYLAN CONST & DEVT FORMERLY: ADSM CONST149Check in
OO2: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF SIFFU RIVER FLOOD CONTROL STRUCTURE (CULLALABO SUR SECTION), BARANGAY CULLALABO, BURGOS, ISABELAIsabela 2nd DEO₱140.4M42% reported progressRR BUILDERS253Check in
OO2: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF SIFFU RIVER FLOOD CONTROL STRUCTURE (LANTING SECTION), ROXAS,ISABELAIsabela 2nd DEO₱140.4M47% reported progressJWU CONST AND SUPPLY253Check in
OO2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF MAGAT RIVER FLOOD CONTROL STRUCTURE, BARANGAY BANQUERO, DOWNSTREAM, PHASE2Isabela 3rd DEO₱140.4M57% reported progressJWU CONST AND SUPPLY264Check in
OO2:FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES DRAINAGE SYSTEMS -CONSTRUCTION OF BUGNAY CREEK FLOOD CONTROL PROJECT, DALIG SECTION, BURGOS, ISABELAIsabela 2nd DEO₱140.4M43% reported progressJWU CONST AND SUPPLY262Check in
OO2: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF SIFFU RIVER FLOOD CONTROL PROJECT, RIZAL SECTION, ROXAS, ISABELAIsabela 2nd DEO₱140.4M4% reported progressJWU CONST AND SUPPLY251Check in
FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PASUQUIN RIVER, BARANGAY SULBEC, PASUQUIN, ILOCOS NORTEIlocos Norte 1st DEO₱140.4M70% reported progressA L SALAZAR CONST INC124Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM, CONSTRUCTION OF CARDONA FLOOD CONTROL STRUCTURE, CARDONA, DOLORES, ABRAAbra DEO₱140.3M86% reported progressMG SAMIDAN CONST197Check in
Construction of Flood Mitigation Structure along Ilagan River, Barangay Alinguigan 1st to Barangay Alinguigan 2nd, City of Ilagan, IsabelaILAGAN CITY (CAPITAL) (ISABELA), ISABELA₱139.9MReported completeDRAGON TWELVE BUILDERS & CONST SUPPLY252Check in
Construction of Flood Mitigation Structure along Cagayan River-Phase IV, Barangay Malapagay, Sto. Tomas, IsabelaSANTO TOMAS (ISABELA), ISABELA₱139.9MReported completeDRAGON TWELVE BUILDERS & CONST SUPPLY224Check in
Construction of Flood Mitigation Structure along Cagayan River - Phase II (Package 1), Barangay Calamagui 2nd, City of Ilagan, IsabelaILAGAN CITY (CAPITAL) (ISABELA), ISABELA₱139.9MReported completeDRAGON TWELVE BUILDERS & CONST SUPPLY251Check in
Construction of Flood Mitigation Structure along Cagayan River - Phase II, Barangay Alibagu, City of Ilagan, IsabelaILAGAN CITY (CAPITAL) (ISABELA), ISABELA₱139.9MReported completeEGB CONST CORP FORMERLY: EGB CONST254Check in
Construction of Flood Mitigation Structure along Cagayan River - Phase III, Ngarag, Cabagan, IsabelaCABAGAN (ISABELA), ISABELA₱139.9MReported completeDRAGON TWELVE BUILDERS & CONST SUPPLY219Check in
FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF DRAINAGE CANAL, LAOAG CITY, ILOCOS NORTEIlocos Norte 1st DEO₱139.0M19% reported progressA B TAYLAN CONST140Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA MAJOR RIVER BASIN, NORO-DEMET, POBLACION,Abra DEO₱139.0M90% reported progressMG SAMIDAN CONST195Check in
CONSTRUCTION OF NAGUILLAN FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, LA PAZ, ABRAAbra DEO₱139.0M95% reported progressMG SAMIDAN CONST201Check in
CONSTRUCTION OF CULIONG FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY CULIONG, SAN JUAN, ABRAAbra DEO₱138.9M85% reported progressMG SAMIDAN CONST193Check in
CONSTRUCTION OF KAWITAN FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, DANGLAS, ABRAAbra DEO₱138.9M95% reported progressMG SAMIDAN CONST194Check in
CONSTRUCTION OF CARDONA FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY CARDONA, DOLORES, ABRAAbra DEO₱138.9M96% reported progressMG SAMIDAN CONST196Check in
CONSTRUCTION OF CATACDEGAN VIEJO FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY CATACDEGAN VIEJO, MANABO, ABRAAbra DEO₱138.8M21% reported progressMG SAMIDAN CONST220Check in
CONSTRUCTION OF MALIBCONG FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, MALIBCONG, ABRAAbra DEO₱138.8M80% reported progressMG SAMIDAN CONST198Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE, CONSTRUCTION OF CABARUYAN FLOOD CONTROL, CABARUYAN, DAGUIOMAN, ABRAAbra DEO₱138.7M94% reported progressMG SAMIDAN CONST217Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA MAJOR RIVER BASIN (PHASE II), BARANGAY LIAbra DEO₱138.5M93% reported progressMG SAMIDAN CONST198Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF QUILIAT FLOOD CONTROL ALONG ABRA RIVER, QUILIAT, LANGIDEN, ABRAAbra DEO₱138.3MReported completeMG SAMIDAN CONST207Check in
CONSTRUCTION OF BULBULALA FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY BULBULALA, LA PAZ, ABRAAbra DEO₱138.2M95% reported progressMG SAMIDAN CONST199Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA MAJOR RIVER BASIN (PHASE II), BARANGAY BAAbra DEO₱138.1M95% reported progress739 BUILDERS207Check in
CONSTRUCTION OF LIPCAN FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY LIPCAN, BANGUED, ABRAAbra DEO₱138.0M40% reported progressMG SAMIDAN CONST208Check in
CONSTRUCTION OF SOOT FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, LA PAZ, ABRAAbra DEO₱137.8M95% reported progressMG SAMIDAN CONST201Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE, CONSTRUCTION OF MAGMAGUEY FLOOD CONTROL STRUCTURE, LA PAZ, ABRAAbra DEO₱137.7M97% reported progressMG SAMIDAN CONST196Check in
CONSTRUCTION OF AGTANGAO FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY AGTANGAO, BANGUED, ABRAAbra DEO₱137.7M47% reported progressMG SAMIDAN CONST208Check in
CONSTRUCTION OF AGUET FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY AGUET, LAGANGILANG, ABRAAbra DEO₱137.6M91% reported progressMG SAMIDAN CONST202Check in
CONSTRUCTION OF CALAO FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY CALAO, BUCAY, ABRAAbra DEO₱137.6M76% reported progressMG SAMIDAN CONST205Check in
CONSTRUCTION OF BLISS FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BANGUED, ABRAAbra DEO₱137.6M95% reported progressMG SAMIDAN CONST208Check in
CONSTRUCTION OF DAOIDAO FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY DAOIDAO, SAN JUAN, ABRAAbra DEO₱137.6M91% reported progressMG SAMIDAN CONST194Check in
CONSTRUCTION OF PANG-OT FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY PANG-OT, LAGAYAN, ABRAAbra DEO₱137.6M23% reported progressMG SAMIDAN CONST186Check in
CONSTRUCTION OF POBLACION FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY POBLACION, LAGAYAN, ABRAAbra DEO₱137.6M0% reported progressMG SAMIDAN CONST186Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF BANGBANGCAG FLOOD CONTROL ALONG ABRA RIVER, BANGBANGCAG, BUCAY, ABRAAbra DEO₱137.5MReported completeMG SAMIDAN CONST207Check in
CONSTRUCTION OF BAGATOY FLOOD CONTROL STRUCTURE, LA PAZ, ABRAAbra DEO₱137.5M89% reported progressMG SAMIDAN CONST195Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA MAJOR RIVER BASIN, BARANGAY SAN GREGORIO,Abra DEO₱137.5M85% reported progressMG SAMIDAN CONST201Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF LAGAYAN FLOOD CONTROL (PHASE 2), LAGAYAN, ABRAAbra DEO₱137.5M99% reported progressMG SAMIDAN CONST187Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF NAGTUPACAN FLOOD CONTROL ALONG ABRA RIVER, NAGTUPACAN, LAGANGILANG, ABRAAbra DEO₱137.5M90% reported progressMG SAMIDAN CONST205Check in
CONSTRUCTION OF SAGAP FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY SAGAP, BANGUED, ABRAAbra DEO₱137.5M75% reported progressMG SAMIDAN CONST200Check in
CONSTRUCTION OF NAGTUPACAN-ISIT FLOOD CONTROL, DOLORES, ABRAAbra DEO₱137.5MReported completeMG SAMIDAN CONST200Check in
REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CAGAYAN RIVER FLOOD MANAGEMENT PROJECTS, BRGY. ANQUIRAY, AMULUNG, CAGAYAN (DOWNSTREAM) STA. 0+320 - STA. 0+520Cagayan 3rd DEO₱136.4M92% reported progressMEGAY CONST INC FORMERLY: MEGAY CONST174Check in
REHABILITATION OF FLOOD CONTROL MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CAGAYAN RIVER FLOOD MANAGEMENT PROJECTS, BRGY. PATA, ENRILE, CAGAYAN (DOWNSTREAM) STA. 0+230 - STA. 0+430Cagayan 3rd DEO₱136.3M55% reported progressMEGAY CONST INC FORMERLY: MEGAY CONST202Check in
CONSTRUCTION OF LACUB FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, LACUB, ABRAAbra DEO₱136.2M80% reported progressMG SAMIDAN CONST193Check in
SUSTAINABLE INFRASTRUCTURE PROJECT ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURE PROTECTING PUBLIC INFRASTRUCTURE/ FACILITIES, CONSTRUCTION OF PATAGUI-DAGSIAN FLOOD CONTROL STRUCTURE, LA PAZ, ABRAAbra DEO₱135.9M81% reported progressMG SAMIDAN CONST197Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA MAJOR RIVER BASIN (PHASE II), BARANGAY CAAbra DEO₱135.1M84% reported progressMG SAMIDAN CONST195Check in
OO2:PROTECT LIVES AND PROP AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROG-CONS/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONS OF APAYAO-ABULUG RIVER BASIN FLOOD CTRL STRUCTURE,BAGUTONG SEC,STA. 30+315-STA.30+831 (R/S)Apayao 2nd DEO₱134.4MReported completeISNAG BUILDERS & DEV'T CORP129Check in
CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, REHABILITATION OF FLOOD MITIGATION STRUCTURES (AMBURAYAN RIVER), MINDORO, BANGAR, LA UNIONRegion I₱126.2MReported completeH G LOPEZ CONST284Check in
Rehabilitation of Flood Control Structure On Scoured and Eroded River Bank along Badoc River, barangay Las-ud and San Julian, Badoc, Ilocos NorteBADOC (ILOCOS NORTE), ILOCOS NORTE₱125.4MReported completeBADOC BUILDERS & SUPPLY INC FORMERLY: BADOC BUILDER & SUPPLY / ST MATTHEW GEN CONTRACTOR & DEVELOPMENT CORP172Check in
25PJ0029: FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE, STA. 26 +900 - STA. 28+200 (R/S), BUSILAC, ALFONSO LISTA, IFUGAOIfugao 2nd DEO₱123.5M78% reported progressDJY CONST273Check in
CLUSTER: 1. CONSTRUCTION OF SAN JUAN FLOOD CONTROL, STA. 38+023 - STA. 38+792 (LS) 2. CONSTRUCTION OF CALUPAAN FLOOD CONTROL, STA. 40+975 - STA. 41+668 (LS), 3. CONSTRUCTION OF CALIMAG FLOOD CONTROL, STA. 5+823 - STA. 6+132, ALFONSO LISTA, IFUGAOCordillera Administrative Region₱123.5MReported completeDJY CONST279Check in
CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG QUIAOIT RIVER, BARANGAY MABALENG, BATAC CITY, ILOCOS NORTERegion I₱122.7M75% reported progressMEGAPOLITAN BUILDERS AND CONST SUPPLY162Check in
OO 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MNG'T PROGRAM - CONST'N/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS: CONST'N OF MAGAT RIVER FLOOD MNG'T, SAN ROQUE, SAN MATEO, ISABELARegion II₱121.9MReported completeJ H PAJARA CONST CORP275Check in
Construction of Barren River (Downstream) Flood Control within Chico River Basin, Sta. 37+995 - Sta. 39+300 (R/S), Conner, ApayaoCONNER (APAYAO), APAYAO₱115.8MReported completeJOMARCANN GEN CONST / RODEKOM GEN CONST AND ENT175Check in
CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF QUIAOIT RIVER DIVERSION CANAL, BATAC CITY, ILOCOS NORTERegion I₱115.8MReported completeMEGAPOLITAN BUILDERS AND CONST SUPPLY157Check in
CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF QUIAOIT RIVER DIVERSION CANAL, PAOAY, ILOCOS NORTERegion I₱115.8MReported completeRCD GEN CONTRACTOR & CONST SUPPLY157Check in
CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD CONTROL MITIGATION FACILITIES ALONG AMBURAYAN RIVER BASIN, BRGY. BIO-BUCAO - EAST BUCAO - WEST-SAN MIGUEL, TAGUDIN, ILOCOS SURegion I₱115.8MReported completeA P B CONST283Check in
Construction of Gen. E. Batalla Flood Control System, Camalaniugan, CagayanCAMALANIUGAN (CAGAYAN), CAGAYAN₱114.6MReported completeGVDPM CONST CORP FORMERLY: ZM CONSTRUCTIO128Check in
OO2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF BALLACAYU FLOOD CONTROL SYSTEMS (UPSTREAM), SAN PABLO ISABELARegion II₱114.4M89% reported progressEGB CONST CORP FORMERLY: EGB CONST207Check in
LOCAL PROGRAM: FLOOD CONTROL AND DRAINAGE/FLOOD CONTROL STRUCTURES/FACILITIES-LOCAL INFRASTRUCTURE PROGRAM-CONSTRUCTION OF ARCON FLOOD CONTROL SYSTEM, PHASE IIRegion II₱112.9MReported completeEGB CONST CORP FORMERLY: EGB CONST235Check in
SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), CONSTRUCTION OF SWIP, BARANGAY CAMANDINGAN, CITY OF BATAC, ILOCOS NORTERegion I₱112.3M0% reported progressMEGAPOLITAN BUILDERS AND CONST SUPPLY153Check in
DISASTER-RELATED AND EMERGENCY REHABILITATION - FLOOD CONTROL SYSTEMS 1.) RECOVERY/RECONSTRUCTION OF FLOOD CONTROL PROJECTS IN DOLORES, ABRA 2.) REPAIR/REHABILITATION OF FLOOD CONTROL PROJECTS IN DOLORES, ABRACordillera Administrative Region₱112.3M26% reported progressS D PLATON CONST INC197Check in
CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA RIVER, BARANGAY PANTAY AND BARANGAY TAMURONG, CAOAYAN, ILOCOS SURIlocos Sur 1st DEO₱112.3M95% reported progress739 BUILDERS223Check in
CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SABO DAM ALONG SOLSONA RIVER, SOLSONA, ILOCOS NORTERegion I₱112.3M49% reported progressA B TAYLAN CONST & DEVT FORMERLY: ADSM CONST149Check in
SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF RIVERBANK PROTECTION AT NANGUNEG WEST AND SAN PEDRO, NARVACAN, ILOCOS SURIlocos Sur 2nd DEO₱112.3M60% reported progressSATRAP CONST CO INC229Check in
Construction of Balug Flood Control at Tumauini, IsabelaTUMAUINI (ISABELA), ISABELA₱109.1MReported completeEGB CONST CORP FORMERLY: EGB CONST237Check in
ORGANIZATIONAL OUTCOME 2 - PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTUREApayao 1st DEO₱108.8M87% reported progressOMENGAN CONST153Check in
Construction of Carpentero-Compania Flood Control Phase II, Tumauini, IsabelaTUMAUINI (ISABELA), ISABELA₱108.7MReported completeARVEA'S CONST / EGB CONST CORP FORMERLY: EGB CONST236Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM - CONSTRUCTION OF CAPO FLOOD CONTROL SYSTEM, ILAGAN CITY, ISABELARegion II₱108.4MReported completeEGB CONST CORP FORMERLY: EGB CONST248Check in
Construction of Flood Control Structure along Quiaoit River (Upstream of Barsa Bridge), Sitio Barsa, barangay Nalasin, Paoay, Ilocos NortePAOAY (ILOCOS NORTE), ILOCOS NORTE₱106.1MReported completeST MATTHEW GEN CONTRACTOR & DEVELOPMENT CORP155Check in
CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SABO DAM ALONG MADONGAN RIVER, NUEVA ERA, ILOCOS NORTERegion I₱106.1M67% reported progressAMETHYST HORIZON BUILDERS AND GEN CONTRACTOR AND DEVELOPMENT CORP158Check in
Construction of Flood Control System along Abra River Upstream and Downstream of Calungbuyan Bridge, Santa, Ilocos SurSANTA (ILOCOS SUR), ILOCOS SUR₱104.2MReported completeBET CONST & SUPPLY / M G LUALHATI CONST CORP219Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF CATOTORAN SUR FLOOD CONTROL STRUCTURE, CAMALANIUGAN CAGAYANRegion II₱102.8MReported completeR A PAHATI CONST & SUPPLY INC122Check in
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE AIsabela 1st DEO₱101.3M85% reported progressEGB CONST CORP FORMERLY: EGB CONST252Check in
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURIsabela 1st DEO₱101.3M73% reported progressEGB CONST CORP FORMERLY: EGB CONST251Check in
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURIsabela 1st DEO₱101.3MReported completeEGB CONST CORP FORMERLY: EGB CONST218Check in
OO 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-RIVER BANK PROTECTION FOR LOWER CAGAYAN RIVER, TUMAUINI, ISABELA (UPSTREAM)Region II₱100.9MReported completeDRAGON TWELVE BUILDERS & CONST SUPPLY237Check in
CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS -CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BAAG RIVER RIGHT BANK, SITIO BAAG, BRGY. PASALENG, PAGUDPUD, ILOCOS NORTEIlocos Norte 1st DEO₱99.3MReported completeMEGAPOLITAN BUILDERS AND CONST SUPPLY95Check in
Rehabilitation of Flood Control along Galpac Creek, Paoay, Ilocos NortePAOAY (ILOCOS NORTE), ILOCOS NORTE₱99.0MReported completeBADOC BUILDERS & SUPPLY INC FORMERLY: BADOC BUILDER & SUPPLY159Check in
Construction of Cagayan River Flood Control Project, Bgy. District 1 (Package 2), Reina Mercedes, IsabelaREINA MERCEDES (ISABELA), ISABELA₱99.0MReported completeMAR-DEB CONST & DEVELOPMENT CORP FORMERLY: MAR-DEB CONST & DEVELOPMENT266Check in
BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/ FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE PATANAD SECTION 2, SAN ISIDRO, ISABELAIsabela 4th DEO₱99.0M96% reported progressEGB CONST CORP FORMERLY: EGB CONST294Check in
Construction of Cagayan River Flood Control Project, Bgy. District 1 (Package 1), Reina Mercedes, IsabelaREINA MERCEDES (ISABELA), ISABELA₱99.0MReported completeMAR-DEB CONST & DEVELOPMENT CORP FORMERLY: MAR-DEB CONST & DEVELOPMENT266Check in
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION (COMPLETION) OF CAGAYAN RIVER FLOOD CONTROL PROJECT, BRGY. DISTRICT I, REINAIsabela 3rd DEO₱99.0MReported completeMAR-DEB CONST267Check in
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF MAGAT RIVER FLOOD CONTROL PROJECT, BRGY. BANQUERO, REINA MERCEDES, ISABELAIsabela 3rd DEO₱99.0MReported completeMAR-DEB CONST264Check in
CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES-CONSTRUCTION (CONTINUATION) OF CAGAYAN RIVER FLOOD CONTROL PROJECT, BRGY. DISTRICT I, REINA MERCEDES,Isabela 3rd DEO₱99.0MReported completeMAR-DEB CONST267Check in
CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM - FLOOD MITIGATION STRUCTURE PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES-CONSTRUCTION OF CAGAYAN RIVER FLOOD CONTROL PROJECT, BRGY. ROXAS (STA. 0+000 - STA. 0+510) NAGUILIAN, ISABELAIsabela 3rd DEO₱99.0M96% reported progressROAD EDGE TRADING & DEVELOPMENT SERVICES263Check in
CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS -CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PASALENG RIVER, SITIO MADARDARAT EAST, BRGY. PANCIAN, PAGUDPUD, ILOCOS NORTEIlocos Norte 1st DEO₱98.8M94% reported progressDJCM CONST CORP FORMERLY: DJCM CONST96Check in
CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONSTRUCTION OF FLOOD CONTROL ALONG ABRA RIVER, BANTAY SECTION, PHASE II, BANTAY, ILOCOS SURRegion I₱98.3MReported completeA P B CONST212Check in
Construction of Mapacopaco Flood Control, Sta. 38+850 - Sta. 39+900 (R/S), Posnaan, Aguinaldo, IfugaoAGUINALDO (IFUGAO), IFUGAO₱98.0MReported completeMA CONST / R S SEPIAN CONST & TRUCKING273Check in
CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BISLAK RIVER, BRGY. CANAAM, VINTAR, ILOCOS NORTEIlocos Norte 1st DEO₱98.0MReported completeNORTH TECH BUILDERS AND CONST SUPPLY125Check in
CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BISLAK RIVER, BRGY. CABAYO, VINTAR, ILOCOS NORTEIlocos Norte 1st DEO₱98.0MReported completeMG SAMIDAN CONST117Check in
CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF BAYUDAN-CHICO RIVER FLOOD-EROSION CONTROL PROJECTCordillera Administrative Region₱97.5MReported completeFIAT CONST SERVICES266Check in
Construction of Flood Mitigation Structure along Laoag River Basin, Dingris River, Right Bank, barangay Maruaya, Piddig, Ilocos NortePIDDIG (ILOCOS NORTE), ILOCOS NORTE₱97.5MReported completeMGB CONST & TRADING137Check in
Construction of Flood Mitigation Structure along Laoag River Basin, Dingris River, Left Bank, barangay Calambeg, Piddig, Ilocos NortePIDDIG (ILOCOS NORTE), ILOCOS NORTE₱97.5MReported completeNORTH TECH BUILDERS AND CONST SUPPLY / SOLID NORTH CONST137Check in
Construction of Flood Mitigation Structure along Laoag River Basin, Dingris River, Left Bank, barangay Maruaya, Piddig, Ilocos NortePIDDIG (ILOCOS NORTE), ILOCOS NORTE₱97.5MReported completeMGB CONST & TRADING137Check in
CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BAAG RIVER LEFT BANK, SITIO BAAG, BRGY. PASALENG, PAGUDPUD , ILOCOS NORTEIlocos Norte 1st DEO₱97.4M99% reported progressR A PAHATI CONST95Check in
CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS(SIPAG), SIPAG- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/FACILITIES CONSTRUCTION OF BARREN RIVER (DOWNSTREAM) FLOOD CONTROL STRUCTApayao 1st DEO₱96.7MReported completeJOMARCANN GEN CONST181Check in
Construction of Flood Control Structure at Brgy. Carabatan Chica, Cauayan City, IsabelaCITY OF CAUAYAN (ISABELA), ISABELA₱96.5MReported completeMA TESORO CONST / EGB CONST CORP FORMERLY: EGB CONST271Check in
Construction of Flood Control Structure along Abra Major River Basin (Phase II), Banglolao - Labon, Bucay, AbraBUCAY (ABRA), ABRA₱96.5MReported completeMG SAMIDAN CONST210Check in
Construction of Canayun-Sirit-Dana-Ili Flood Control along Abulug River (Sta. 13+300 - Sta. 13+580) left side, Abulug, CagayanABULUG (CAGAYAN), CAGAYAN₱96.5MReported completeEGB CONST CORP FORMERLY: EGB CONST108Check in
Construction of Flood Mitigation Structure along Agno River, Poblacion Buguias Section, Sta. 10 + 451 - 10 + 888 (L.S), Sta. 10 + 506 - 10 + 689 (RS), Sta. 10 + 917 - 11 + 039 (L.S), Sta. 0 + 000 - 0 + 056 (L.S), Sta. 0 + 000 - 0 + 075 (RS) and Sta. 11 + 152 - 11 + 392 (LS), Buguias, BenguetBUGUIAS (BENGUET), BENGUET₱96.5MReported completeMG SAMIDAN CONST / GELLE CONST SERVICES297Check in
Construction of Lias Flood Control Structure (Section 1L), Sta. 055+825 - Sta. 056+700 (Right Side), Barlig, Mountain ProvinceBARLIG (MOUNTAIN PROVINCE), MOUNTAIN PROVINCE₱96.5MReported completeE T LATAWAN CONST256Check in
Construction of Flood Control Structure, Barangay Cardona, Dolores, AbraDOLORES (ABRA), ABRA₱96.5MReported completeST TIMOTHY CONST CORP195Check in
Reconstruction of Canayun-Sirit-Dana-ili Flood Control Along Abulug River , Abulug, Cagayan Sta. 12+700 - Sta. 12+860, Sta. 13+220 - Sta. 13+300 (L/S)CAGAYAN₱96.5MReported completeEGB CONST CORP FORMERLY: EGB CONST108Check in
Construction of Baybayatin Flood Control, Lagayan, AbraLAGAYAN (ABRA), ABRA₱96.5MReported completeMG SAMIDAN CONST185Check in
Construction of Guyabal Flood Control Project, Guyabal, Cauayan City, IsabelaCITY OF CAUAYAN (ISABELA), ISABELA₱96.5MReported completeMA TESORO CONST / EGB CONST CORP FORMERLY: EGB CONST274Check in
Construction of Flood Control Structure along Abra Major River Basin (Phase II), Banacao, Bangued, AbraBANGUED (CAPITAL) (ABRA), ABRA₱96.5MReported completeMG SAMIDAN CONST204Check in
Construction of Flood Control Structure along Bayudan River, Kabulawan-Busilac Bila-Otucan Sur, Sta. 55+800 - Sta. 56+480 (B.S.), Bauko, Mountain ProvinceBAUKO (MOUNTAIN PROVINCE), MOUNTAIN PROVINCE₱96.5MReported completeMG SAMIDAN CONST / R S SEPIAN CONST & TRUCKING267Check in
Construction of Seawall along the Shoreline of Ballesteros, CagayanBALLESTEROS (CAGAYAN), CAGAYAN₱96.5MReported completeTJMT CONST / JEICCA BUILDERS110Check in
Construction of Buringal Proper Flood Control (Sulinek Section), Sta. 065+507 - Sta. 066+407 (Right Side), Buringal, Paracelis, Mountain ProvincePARACELIS (MOUNTAIN PROVINCE), MOUNTAIN PROVINCE₱96.5MReported completeUPLAND CONST AND ENGINEERING SERVICES243Check in
Construction of Flood Control Structure along Apayao River Basin, Namaltugan Section, Calanasan, ApayaoCALANASAN (BAYAG) (APAYAO), APAYAO₱96.5MReported completeTAGEL CORP / E C V CONST140Check in
Share card: Ragasa (Nando) 2025: flood-control projects in its path

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Track: IBTrACS v04r01, NOAA National Centers for Environmental Information (Knapp et al., 2010), including JTWC data. Recent storms use provisional tracks that may change. Local name assigned by PAGASA. Projects: DPWH flood-control project list; distance is from the project’s reported coordinates to the track line.