A DE GUIA CONST AND DEVELOPMENT CORP FORMERLY: A DE GUIA CONST is listed as a company organization in Philippine public procurement records on this site, with 112 linked DPWH project(s) totaling about ₱4,083,635,799.49. Recorded delivery grade B (pattern summary from public DPWH/PhilGEPS links — not a finding of wrongdoing).
A DE GUIA CONST AND DEVELOPMENT CORP FORMERLY: A DE GUIA CONST
BRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 112
- Total value
- ₱4,083,635,799.49
- Published flags
- 2
- Region
- Isabela 3rd DEO · Region II
Online presence
Google Maps: A. De Guia Construction★ 2 (1 reviews)Google Maps, 2026-10-22
QPM2+J2P, Alicia, Isabela
Licensed officers (PCAB)
- EDWARD FRANCIS YAP LABIANO · Authorized Managing Officer (PCAB license 18228) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for A DE GUIA CONST AND DEVELOPMENT CORP FORMERLY: A DE GUIA CONST — not an accusation or finding of wrongdoing.
Score: 88.90 / 100 · Projects in sample: 112 · As of Oct 22, 2026 UTC
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 80.4/100 · Weight: 47%
- graceDays
- 30
- componentScore
- 80.4
- lateCompletedProjects
- 21
- onTimeCompletedProjects
- 82
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 109
- pastTargetOngoingProjects
- 6
- undatedCompletedProjectsExcluded
- 3
- Termination rate
Component score: 100/100 · Weight: 21%
- totalProjects
- 112
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 21%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 112
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
Component score: 99.5/100 · Weight: 11%
- projects
- 112
- componentScore
- 99.5
- flagsPerProject
- 0.02
- publishedV2Flags
- 2
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 112
- componentScore
- —
- linkedObservations
- 0
Computed automatically from public DPWH, PhilGEPS and COA records, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
50 geotagged project(s) — Open full map
- Construction of Slope Protection Works for Cagayan River Basin, Siffu River at Anao, Roxas, Isabela23B00058 · ₱190,598,720.80 · mapped
- Construction of Flood Mitigation Structure along Magat River, Turod Section, Reina Mercedes, Isabela Package 124BG0046 · ₱144,457,257.80 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM: CONSTRUCTION OF BY-PASS AND DIVERSION ROADS- CORDON BY-PASS ROAD - PACKAGE 123B00004 · ₱111,144,389.98 · mapped
- NETWORK DEV'T: CONST'N OF BY-PASS AND DIVERSION ROAD ALONG SAN MATEO-ALFONSO LISTA DIVERSION ROAD, INCLUDING ROW, ISABELA, K0000+000-K0002+820=STA. 000++000-STA. 002+820, SAN MATEO, ISABELA18B00020 · ₱110,341,986.69 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT: CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - ALICIA BYPASS ROAD, ALICIA, ISABELA ROAD, ISABELA; STA. 0+860 - STA. 1+747.02, ALICIA, ISABELA20B00032 · ₱100,939,469.15 · mapped
- ORGANIZATIONAL OUTCOME 2 : FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF MALLIG RIVER FLOOD CONTROL PROJECT, BARANGAY LUNA PHASE II, QUIRINO, ISABEL24BF0048 · ₱96,498,005.33 · mapped
- Construction of Siffu River Flood Control Project (San Luis Section), Roxas, Isabela22BF0074 · ₱96,495,711.51 · mapped
- OO2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION OF MAGAT RIVER FLOOD CONTROL STRUCTURE, BARANGAY MALALATANG TUNGI, REINA MERCEDES25BG0096 · ₱96,429,790.23 · mapped
- Construction of Flood Control Structure along Ganano River Bank, Barangay San Antonio, Alicia, Isabela21BG0151 · ₱96,427,479.98 · mapped
- OO2: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF MALLIG RIVER FLOOD CONTROL PROJECT, (SANTIAGO SECTION PHASE 4) QUIRINO, ISABELA25BF0034 · ₱96,404,174.29 · mapped
- OO2: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF MALLIG RIVER FLOOD CONTROL PROJECT, (SANTIAGO SECTION PHASE 3), BARANGAY SANTIAGO, QUIRINO, ISABELA25BF0033 · ₱96,402,515.74 · mapped
- OO2: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS -CONSTRUCTION OF MALLIG RIVER FLOOD CONTROL PROJECT (IMBIAO SECTION PHASE II), ROXAS, ISABELA25BF0036 · ₱96,402,433.29 · mapped
- OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONSTRUCTION OF CAGAYAN RIVER FLOOD CONTROL PROJ, BRGY DISTRICT 1 CONT. (STA 0+246.80-STA 0+701.10)24BG0063 · ₱96,400,992.25 · mapped
- Construction of Siffu River Flood Control Project, Barangay San Jose Phase II, Sta.0+600 - Sta. 1+400, Quirino, Isabela24BF0034 · ₱96,400,096.41 · mapped
- Construction of Cagayan River Flood Control Project, Brgy. Napaccu Grande, Reina Mercedes, Isabela22BG0053 · ₱95,057,153.07 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM: CONSTRUCTION OF BY-PASS AND DIVERSION ROADS- CAUAYAN CITY ALTERNATE ROUTE, ISABELA - PACKAGE 223B00002 · ₱93,871,204.83 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT: CONSTRUCTION OF BY-PASS AND DIVERSION ROADS-SAN MATEO-ALFONSO LISTA DIVERSION ROAD, ISABELA; STA. 002+820-STA. 004+179.54; STA. 004+654.54-STA. 004+99520B00015 · ₱93,832,707.70 · mapped
- OO2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS- FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF RIVER FLOOD CONTROL STRUCTURE, BARANGAY SAN MANUEL, NAGUILIAN, ISABELA25BG0109 · ₱93,605,021.57 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM: CONSTRUCTION OF BY-PASS AND DIVERSION ROADS- SANTIAGO CIRCUMFERENTIAL ROAD, PACKAGE 1, ISABELA23B00010 · ₱92,434,288.92 · mapped
- NETWORK DEVELOPMENT-IMPROVEMENT/WIDENING OF NATIONAL ROADS PRIMARY ROADS-OTHER PRIMARY ROADS ALONG NATIONAL ROADS ALONG SANTIAGO-TUGUEGARAO ROAD, K0369+000-K0371+000, K0373+000-K0374+000, K0374+947-K0376+000, AURORA AND SAN MANUEL, ISABELA17BF0027 · ₱91,156,995.64 · mapped
- NETWORK DEVELOPMENT:WIDENING OF NATIONAL ROADS ALONG NATIONAL ROAD 1 (N1)/DM/ASIAN HIGHWAY 26-DM (LZ), REINAMERCEDES, NAGUILLIAN AND GAMU, ISABELA15B00053 · ₱79,349,760.82 · mapped
- NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - ALICIA BY-PASS ROAD, INCL. ROW AND SLOPE PROTECTION, ALICIA, ISABELA18BG0068 · ₱77,391,966.27 · mapped
- OO2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/ REHAB OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CAGAYAN RIVER, BRGY. CENTRO 3, ANGADA24BG0183 · ₱77,124,828.15 · mapped
- NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROAD - ALICIA BYPASS ROAD INCL. ROW AND SLOPE PROTECTION, ALICIA, ISABELA19BG0001 · ₱75,359,539.53 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT - CONSTRUCTION OF MISSING LINKS/NEW ROADS - NAGUILIAN (JCT. CVR) - PALANAN ROAD, ISABELA21BG0089 · ₱71,286,876.66 · mapped
- OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF RIVER FLOOD CONTROL PROJECT, BRGY.PALATTAO, NAGUILIAN, ISABELA21BG0062 · ₱56,076,932.33 · mapped
- Construction of Flood Mitigation Structure along Cagayan River, Roxas Section, Naguilian, Isabela24BG0030 · ₱48,941,780.88 · mapped
- LOCAL INFRASTRUCTURE PROGRAM -LOCAL ROADS AND BRIDGES - CONCRETING OF BANNAWAG-CALOACAN ROAD BRGY. CALOACAN-BANNAWAG, ANGADANAN, LSABELA19BG0060 · ₱48,488,396.44 · mapped
- Construction of Siffu River Flood Control Project (Barangay Rizal Section), Sta. 0+000 - Sta. 0+600, Barangay Rizal, Quirino, Isabela,23BF0047 · ₱48,217,377.67 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT - CONSTRUCTION OF MISSING LINKS/NEW ROADS - NAGUILIAN-BENITO SOLIVEN-SAN MARIANO-DIVILACAN-MACONACON-PALANAN ROAD, SAN MARIANO, ISABELA20BG0079 · ₱47,773,287.33 · mapped
- PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF CASILI CREEK FLOOD CONTROL PROJECT (MALLIG PUBLIC MARKET SECTION), MALLIG, ISABELA19BF0054 · ₱47,504,513.04 · mapped
- CONSTRUCTION OF SAN MARIANO EVACUATION CENTER (PHASE I), SAN MARIANO, ISABELA18BF0177 · ₱46,796,134.97 · mapped
- CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS: CONSTRUCTION OF CAGAYAN RIVER FLOOD CONTROL PROJECT (ROXAS SECTION), NAGUILIAN, ISABELA, NAGUILIAN, ISABELA18BF0059 · ₱46,546,419.61 · mapped
- NETWORK DEVELOPMENT, IMPROVEMENT/WIDENING OF NATIONAL ROADS, SANTIAGO-TUGUEGARAO RD., K0342+(-039)-K0343+884, OSCARIZ, RAMON, ISABELA - SINAMAR SUR, SAN MATEO, ISABELA17BG0027 · ₱46,505,901.02 · mapped
- ASSET PRESERVATION: REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-TERTIARY ROAD ALONG NAGUILIAN-SAN MARIANO ROAD (S00789LZ) K0399+000-K0400+000, K0400+000-K0401+000, K0401+000-K0402+000, K0402+000-K0402+470, STA.FILOMENA AND ZONE III, SAN18BF0027 · ₱46,500,987.95 · mapped
- OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS -FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF RIVER FLOOD CONTROL PROJECT, BRGY. PALATTAO SECTION, NAGUILIAN, ISABELA20BG0014 · ₱45,838,873.80 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT - ROAD WIDENING -TERTIARY ROADS - ALICIA-SAN MATEO RD - K0353+000-K0354+384, ALICIA, ISABELA20BG0017 · ₱44,491,686.48 · mapped
- Construction of Cagayan River Flood Control Project, Barangay Nappacu Pequeño, Reina Mercedes, Isabela23BG0035 · ₱43,439,626.45 · mapped
- Construction of Cagayan River Flood Control Project, Barangay District 3, Gamu, Isabela23BG0003 · ₱43,438,480.05 · mapped
- Construction of Flood Control Structure along the bank of Cagayan River, Rancho Bassit, Angadanan, Isabela22BG0002 · ₱41,507,114.34 · mapped
- NETWORK DEVELOPMENT - ROAD WIDENING - TERTIARY ROADS - ALICIA - SAN MATEO ROAD - K0351+710 TO K0353+00019BG0007 · ₱41,459,110.61 · mapped
- NETWORK DEVELOPMENT-ROAD WIDENING-PRIMARY ROADS ALONG DAANG MAHARLIKA(LZ) (S00782LZ) K0382+(-1051) - K0382+000, K0383+450 - K0383+668, K0383+740 - K0383+830, K0386+193 - K0386+291, NAGUILIAN, ISABELA18BF0062 · ₱40,692,870.45 · mapped
- CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS: CONSTRUCTION OF CAGAYAN RIVER FLOOD CONTROL PROJECT (QUIRINO SECTION), NAGUILIAN, ISABELA, NAGUILIAN, ISABELA18BF0037 · ₱37,231,331.13 · mapped
- CONSTRUCTION OF EVACUATION CENTER, BRGY. CENTRO 03, ANGADANAN, ISABELA20B00051 · ₱34,180,830.73 · mapped
- CONSTRUCTION OF FOUR(4) STOREY TWENTY(20) CLASSROOM SCHOOL BUILDING, ALICIA NATIONAL HIGH SCHOOL, ALICIA ISABELA SCHOOL ID NO.30050016BG0036 · ₱30,163,972.61 · mapped
- ASSET PRESERVATION OF NATIONAL ROADS-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT AND MANAGEMENT-4(HDM-4)-TERTIARY ROADS ALONG NAGUILIAN-SAN MARIANO ROAD17BF0018 · ₱28,973,221.32 · mapped
- Construction of Cagayan River Flood Control Project, Brgy. Rancho Bassit, Angadanan, Isabela21BG0002 · ₱28,957,991.85 · mapped
- LOCAL INFRASTRUCTURE PROGRAM - BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE / FACILITIES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (SAN MARIANO EVACUATION CENTER - PHASE 2), BRGY. MINANGA, SAN MARIANO, ISABELA20BG0137 · ₱28,802,768.24 · mapped
- CONSTRUCTION/ REPAIR/ REHABILITATION/ IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE / FACILITIES - CONSTRUCTION OF EVACUATION CENTER (PHASE 2), SAN MARIANO, ISABELA20BG0138 · ₱28,797,361.85 · mapped
- CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS: CONSTRUCTION OF CAGAYAN RIVER FLOOD CONTROL PROJECT (GAMU BRIDGE SECTION), GAMU, ISABELA, GAMU, ISABELA18BF0060 · ₱27,927,190.80 · mapped
