Construction of Flood Control Structure along Abra Major River Basin (Phase II), Banacao, Bangued, Abra
Construction of Flood Control Structure along Abra Major River Basin (Phase II), Banacao, Bangued, Abra is a DPWH-tracked public work in BANGUED (CAPITAL) (ABRA), ABRA, Cordillera Administrative Region. Reported contract value: ₱96,500,000.00. Status: Reported complete (DPWH). Contractor on record: MG SAMIDAN CONST. Figures trace to sumbong.
Total Contract Cost
