Municipality
Bangued
Bangued, Abra, Cordillera Administrative Region (CAR). 1st income class. Population 48,331 (2024 POPCEN).
Data-quality note: 23 DPWH projects linked to Bangued have no coordinates published by DPWH, so they are not on the map and cannot be checked with satellite images.
PSGC 1400101000 · Source: PSA, PSGC 3Q 2026 Publication Datafile
Public records linked to Bangued
Counts include this municipality and every LGU under it. Each record carries how it was linked and a confidence level; figures are as recorded by the source and exclude single amounts of ₱10B+ held for verification. They are not findings.
DPWH infrastructure projects
Contracts on the DPWH Transparency portal, placed by coordinates first. Source: DPWH Transparency portal
196 records · ₱7,382,524,608.73
26 placed at Bangued level itself; the rest in LGUs under it.
- Oo2: Protect Lives and Properties Against Major Floods, Construction/ Rehabilitation of Flood Mitigation Facilities Within Major River Basins and Principal River, Construction of San Antonio Flood Control Along Abra River, San Antonio, Bangued, Abra₱144,750,000.00 · 2024 · medium confidence (project coordinates inside the barangay boundary)
- Oo2: Protect Lives and Properties Against Major Floods, Construction/ Rehabilitation of Flood Mitigation Facilities Within Major River Basins and Principal River, Construction of BañAcao Flood Control Along Abra River, BañAcao, Bangued, Abra₱144,750,000.00 · 2024 · medium confidence (project coordinates inside the barangay boundary)
- Oo2: Protect Lives and Properties Against Major Floods, Construction/ Rehabilitation of Flood Mitigation Facilities Within Major River Basins and Principal River, Construction of Flood Control Structure Along Abra River Basin, Barangay Quillat, Langiden,₱144,747,000.00 · 2023 · high confidence (project coordinates inside the city/municipality boundary)
- Sustainable Infrastructure Projects Alleviating Gaps (Sipag) Access Roads and/Or Bridges From the National Road/S Leading to Major/ Strategic Public Buildings/ Facilities-Construction of Calaba Viaduct Phase I, Calaba, Bangued, Abra₱139,949,394.28 · 2024 · medium confidence (project coordinates inside the barangay boundary)
- Sustainable Infrastructure Projects Alleviating Gaps (Sipag) Access Roads and/Or Bridges From the National Road/S Leading to Major/ Strategic Public Buildings/ Facilities-Construction of Calaba Viaduct Phase 2, Calaba, Bangued, Abra₱139,833,318.18 · 2024 · medium confidence (project coordinates inside the barangay boundary)
- Sustainable Infrastructure Projects Alleviating Gaps (Sipag)-Access Roads and/Or Bridges From the National Road/S Leading to Major/ Strategic Public Buildings/ Facilities, Construction of Lipcan Bypass Road, Bangued, Abra₱139,052,385.76 · 2024 · medium confidence (project coordinates inside the barangay boundary)
How linked: 170 by project coordinates inside the barangay boundary; 23 by project title names the place; 3 by project coordinates inside the city/municipality boundary.
Contracts this LGU awarded (PhilGEPS)
PhilGEPS awards where the procuring entity is this LGU. Source: PhilGEPS award notices
22 records · ₱10,838,250.02
- Barangay Calaba - Bangued, Abra₱924,960.99 · high confidence (the LGU itself is the buyer)
- Barangay BañAcao - Bangued, Abra₱794,967.57 · high confidence (the LGU itself is the buyer)
- Barangay Agtangao - Bangued, Abra₱789,668.95 · high confidence (the LGU itself is the buyer)
- Barangay Lipcan - Bangued, Abra₱699,968.85 · high confidence (the LGU itself is the buyer)
- Barangay Angad - Bangued, Abra₱635,468.50 · high confidence (the LGU itself is the buyer)
- Barangay Sappaac - Bangued, Abra₱624,625.37 · high confidence (the LGU itself is the buyer)
How linked: 22 by the LGU itself is the buyer.
PhilGEPS awards delivered here (all agencies)
Awards by any agency whose area of delivery is this province. PhilGEPS records delivery areas at province level only. Source: PhilGEPS award notices
Not yet linked to Bangued itself. This shows the province figure for Abra.
8,355 records · ₱100,465,305,547.71
8,328 placed at Abra level itself; the rest in LGUs under it.
- Abra₱100,465,305,547.71 · 8,328 awards · high confidence (area of delivery is this province only)
- Abra, Agusan del Norte₱67,685,421.80 · 10 awards · low confidence (area of delivery lists several provinces)
- Abra, Albay, Cotabato, Negros Occidental, Nueva Ecija₱9,712,257.84 · 1 awards · low confidence (area of delivery lists several provinces)
- Abra, Benguet, Ilocos Norte, Ilocos Sur, La Union₱4,869,600.00 · 6 awards · low confidence (area of delivery lists several provinces)
- Abra, Benguet, Ilocos Norte, Ilocos Sur, La Union, Mountain Province₱2,793,144.00 · 5 awards · low confidence (area of delivery lists several provinces)
- Abra, Agusan del Norte, Agusan del Sur₱585,000.00 · 4 awards · low confidence (area of delivery lists several provinces)
How linked: 8,328 by area of delivery is this province only; 27 by area of delivery lists several provinces.
Local Government Support Fund releases
DBM LGSF project releases by province, city/municipality and barangay. Source: DBM COMPASS
5 records · ₱29,762,784.62
4 placed at Bangued level itself; the rest in LGUs under it.
- Rehabilitation of Barangay Hall (Multi-Purpose Bldg)₱9,762,784.62 · 2022 · high confidence (location columns in the DBM release)
- Construction of Multipurpose Building in Barangay Cabuloan, Bangued, Abra, Cordillera Administrative Region (Car)₱5,000,000.00 · 2025 · high confidence (location columns in the DBM release)
- Assistance to Indigent Individuals Or Families - Food Assistance/Rice Distribution Project₱5,000,000.00 · 2026 · high confidence (location columns in the DBM release)
- Concreting of Multi-Purpose Building in Bangued, Abra₱5,000,000.00 · 2024 · high confidence (location columns in the DBM release)
- Concreting of Multi-Purpose Building in Barangay Zone 6 Pob., Bangued₱5,000,000.00 · 2024 · high confidence (location columns in the DBM release)
How linked: 5 by location columns in the DBM release.
GAA budget lines naming this place
General Appropriations Act lines whose text ends in this city/municipality and province. Source: DBM General Appropriations Act
141 records · ₱5,635,901,000.00
97 placed at Bangued level itself; the rest in LGUs under it.
- Construction of BañAcao Flood Control Along Abra River, BañAcao, Bangued, Abra₱150,000,000.00 · 2024 · high confidence (GAA line text names the place)
- Construction of Bangbangar Section Bypass Road, Bangued, Abra₱150,000,000.00 · 2024 · high confidence (GAA line text names the place)
- Construction of Cabuloan Bypass Road, Bangued, Abra₱150,000,000.00 · 2024 · high confidence (GAA line text names the place)
- Construction of Calaba Viaduct Phase 1, Calaba, Bangued, Abra₱150,000,000.00 · 2024 · high confidence (GAA line text names the place)
- Construction of Calaba Viaduct Phase 2, Calaba, Bangued, Abra₱150,000,000.00 · 2024 · high confidence (GAA line text names the place)
- Construction of Lipcan Bypass Road, Bangued, Abra₱150,000,000.00 · 2024 · high confidence (GAA line text names the place)
How linked: 141 by GAA line text names the place.
COA annual audit reports
Not yet linked: the COA reports loaded so far cover national agencies only. LGU audit reports are published at coa.gov.ph.
Published anomaly flags
Patterns in the linked records that reviewers checked and published. A flag is a question worth asking, not a finding of wrongdoing.
- Contractor Concentration (Flood Control)Mg Samidan ConstContractor: Mg Samidan Const
- Contractor Concentration (Flood Control)Mg Samidan ConstContractor: Mg Samidan Const
- High Concurrent Workload for One ContractorMg Samidan ConstContractor: Mg Samidan Const
- Awards Very Close to the Budget CeilingConstruction of Angad Flood Control, Bangued, AbraContractor: Mg Samidan Const
- Awards Very Close to the Budget CeilingConstruction of Flood Control Structure Along Abra Major River Basin (Phase Ii), Banacao, Bangued, AbraContractor: Mg Samidan Const
- Awards Very Close to the Budget CeilingConstruction of BañAcao Flood Control, Bangued, AbraContractor: Mg Samidan Const
Contractors on linked DPWH projects
All 21 contractors on DPWH projects linked to Bangued and the LGUs under it. Click a column to sort.
| Mg Samidan Const | 29 | ₱3,163,432,596.10 | 6 |
| 739 Builders | 45 | ₱886,308,834.65 | 0 |
| Phesco INC 145 | 14 | ₱730,505,234.57 | 0 |
| Viking Const | 22 | ₱718,528,154.01 | 0 |
| E T Latawan Const | 4 | ₱554,669,194.64 | 0 |
| A D Marrero Gen Const | 22 | ₱352,621,489.19 | 0 |
| R A Fanglayan Raf Gen Const INC Formerly:Raf Gen Const | 22 | ₱293,980,842.62 | 0 |
| Kuatako Construction | 3 | ₱104,700,579.34 | 0 |
| M G Lualhati Const CORP | 2 | ₱95,583,789.34 | 0 |
| L S D Const | 2 | ₱91,402,807.56 | 0 |
| Philippine Chemsteel Industries INC | 1 | ₱84,920,000.00 | 0 |
| R U Aquino Const And Development CORP Fo | 2 | ₱55,737,255.53 | 0 |
| F B Bantales Engineering Const | 1 | ₱48,979,985.73 | 0 |
| Werr CORP International | 3 | ₱48,181,288.90 | 0 |
| Rely Const | 1 | ₱44,340,520.71 | 0 |
| R S Sepian Const | 5 | ₱41,914,572.17 | 0 |
| Kvc Const | 1 | ₱28,512,021.92 | 0 |
| Sembri Const | 2 | ₱14,186,277.60 | 0 |
| Delton Const | 2 | ₱12,024,854.45 | 0 |
| Tuquer Builders | 1 | ₱9,173,188.85 | 0 |
| Baje Const | 1 | ₱2,821,120.85 | 0 |
Costs as recorded by DPWH; single amounts of ₱10B+ are held for verification and excluded. Flags count published automated anomalies on this contractor's projects or awards here, plus flags on the contractor itself; they are not findings.

Share this page
The card shows the public record facts and a QR code back to this page.
Barangays in Bangued (31)
- Agtangao · 2 DPWH projects
- Angad · 2 DPWH projects
- Bañacao · 10 DPWH projects
- Bangbangar · 1 DPWH projects
- Cabuloan · 11 DPWH projects
- Calaba · 20 DPWH projects
- Cosili East · 4 DPWH projects
- Cosili West · 3 DPWH projects
- Dangdangla
- Lingtan · 1 DPWH projects
- Lipcan · 10 DPWH projects
- Lubong · 1 DPWH projects
- Macarcarmay · 2 DPWH projects
- Macray · 3 DPWH projects
- Malita · 2 DPWH projects
- Maoay
- Palao · 7 DPWH projects
- Patucannay · 5 DPWH projects
- Sagap · 4 DPWH projects
- San Antonio · 9 DPWH projects
- Santa Rosa · 7 DPWH projects
- Sao-atan · 3 DPWH projects
- Sappaac · 4 DPWH projects
- Tablac · 1 DPWH projects
- Zone 1 Pob.
- Zone 2 Pob.
- Zone 3 Pob. · 12 DPWH projects
- Zone 4 Pob.
- Zone 5 Pob. · 5 DPWH projects
- Zone 6 Pob. · 2 DPWH projects
- Zone 7 Pob. · 39 DPWH projects
QR codes for Bangued
Print these or the flyer and post them in your barangay hall, market or school. Both use high error correction, so they still scan when partly worn.
