BJMJB CONST is listed as a company organization in Philippine public procurement records on this site, with 360 linked DPWH project(s) totaling about ₱4,549,376,170.43. Recorded delivery grade F (from public DPWH project records — not a finding of wrongdoing).
BJMJB CONST
FGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 360
- Total value
- ₱4,549,376,170.43
- Published flags
- 0
- Region
- Ilocos Norte 1st DEO · Region I
Public Record Grade
A transparent, data-derived summary of reported public records for BJMJB CONST — not an accusation or finding of wrongdoing.
Score: 57.30 / 100 · Projects in sample: 360 · As of Oct 28, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 18.5/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 18.5
- lateCompletedProjects
- 2
- onTimeCompletedProjects
- 93
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 301
- pastTargetOngoingProjects
- 206
- undatedCompletedProjectsExcluded
- 49
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 360
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 360
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 360
- componentScore
- No data for this figure; the component is excluded, not scored
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 360
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 50 of 345 geotagged projects (largest by contract value) — Open full map · Download projects (CSV)
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD MITIGATING STRUCTURE RIGHT BANK, BARANGAY ISIC-ISIC, VINTAR ILOCOS NORTE (PHASE 2)24AA0098 · ₱57,899,804.15 · mapped
- CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATIONSTRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OFFLOOD CONTROL STRUCTURE ALONG PADSAN RIVER, BARANGAY10, SARRAT, ILOCOS NORTE (PHASE 2)24AA0084 · ₱57,899,358.77 · mapped
- FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BISLAK RIVER, SITIO DALIM, BARANGAY CABAYO, VINTAR, ILOCOS NORTE25AA0033 · ₱56,438,918.57 · mapped
- FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BISLAK RIVER, SANJERA BENGBENGKAG, BARANGAY ISIC-ISIC, VINTAR, ILOCOS NORTE25AA0032 · ₱56,122,686.85 · mapped
- FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG DAURAO CREEK, BARANGAY CAAOACAN, LAOAG CITY, ILOCOS NORTE25AA0140 · ₱55,575,913.63 · mapped
- FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE MANGATO BRIDGE UPSTREAM, LAOAG CITY, ILOCOS NORTE25AA0030 · ₱55,552,365.36 · mapped
- CONSTRUCTION /MAINTENANCE OF FLOOD MITIGATION STRUCTURES ANDDRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROLSTRUCTURE ALONG PADSAN RIVER, BARANGAY 18 SAN ISIDRO,SARRAT, ILOCOS NORTE (PHASE 2)24AA0088 · ₱48,999,932.42 · mapped
- CONSTRUCTION/MAINTENANCE OFFLOOD MITIGATION STRUCTURES AND DRAINAGESYSTEMS - CONSTRUCTION OF FLOOD MITIGATINGSTRUCTURE, DOWNSTREAM SPILLWAY, BARANGAYISIC ISIC, VINTAR, ILOCOS NORTE24AA0095 · ₱48,999,899.20 · mapped
- CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATING STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD MITIGATING STRUCTURE, DOWNSTREAM SPILLWAY, BARANGAY ISIC-ISIC, VINTAR, ILOCOS NORTE (PHASE2)24AA0096 · ₱48,999,897.43 · mapped
- CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD MITIGATING STRUCTURE ALONG BACARRA- VINTAR RIVER AND TRIBUTARIES, BARANGAY CABAYO, VINTAR, ILOCOS NORTE ( PHASE 2)24AA0127 · ₱48,999,885.17 · mapped
- SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR / STRATEGIC PUBLIC BUILDINGS / FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TULNAGAN RIVER, PASUQUIN, ILOCOS NORTE24AA0194 · ₱48,999,239.02 · mapped
- CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD MITIGATING STRUCTURE LEFT BANK, BARANGAY ISIC-ISIC, VINTAR, ILOCOS NORTE24AA0123 · ₱48,249,929.24 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BANBAN RIVER, DOWNSTREAM OF BANBAN-DADAOR BRIDGE, BRGY UTOL, BANGUI, ILOCOS NORTE23AA0483 · ₱48,101,408.87 · mapped
- SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE BARANGAY POBLACION, ADAMS, ILOCOS NORTE24AA0205 · ₱47,603,520.73 · mapped
- FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LAOAG RIVER, BARANGAY DARAYDAY, LAOAG CITY, ILOCOS NORTE25AA0145 · ₱47,487,995.53 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF DIVERSION DAM, PAGUDPUD, PASUQUIN AND SARRAT, I.N.25AA0467 · ₱47,400,293.12 · mapped
- SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, BARANGAY BACSIL TO BARANGAY PAYAC, BANGUI, ILOCOS NORTE24AA0171 · ₱47,240,412.62 · mapped
- FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BANBAN RIVER, BARANGAY UTOL, BANGUI, ILOCOS NORTE25AA0123 · ₱47,076,675.96 · mapped
- FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF GROUNDSILL AND ITS APPURTENANT STRUCTURE, BONGA PUMP 3, BARANGAY TANGID, LAOAG CITY, ILOCOS NORTE25AA0036 · ₱47,061,145.17 · mapped
- FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BUAGAO RIVER, BANGUI, ILOCOS NORTE25AA0125 · ₱47,060,630.76 · mapped
- FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY SANTA MAGDALENA, SARRAT, ILOCOS NORTE25AA0171 · ₱47,059,683.13 · mapped
- FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LAOAG RIVER, BARANGAY ZAMBOANGA, LAOAG CITY, ILOCOS NORTE25AA0146 · ₱47,049,514.26 · mapped
- CONSTRUCTION /MAINTENANCE OF FLOOD MITIGATION STRUCTURES ANDDRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD MITIGATINGSTRUCTURE RIGHT BANK, BARANGAY ISIC ISIC, VINTAR, ILOCOSNORTE24AA0097 · ₱47,047,565.88 · mapped
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY CABUNGAAN, LAOAG CITY, ILOCOS NORTE25AA0483 · ₱47,046,196.16 · mapped
- FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BASBASA RIVER, BARANGAY PAYAC, BANGUI, ILOCOS NORTE25AA0124 · ₱47,042,195.86 · mapped
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG DAURAO CREEK, BARANGAY CASILI, LAOAG CITY, ILOCOS NORTE25AA0484 · ₱47,040,543.11 · mapped
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATIONSTRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OFMANGATO FLOOD CONTROL, BARANGAY MANGATO, LAOAG CITY,ILOCOS NORTE24AA0101 · ₱47,036,778.81 · mapped
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES -CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY MANGATO, LAOAG CITY, ILOCOS NORTE25AA0482 · ₱47,033,602.84 · mapped
- FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BANBAN RIVER, BARANGAY DADAOR, BANGUI, ILOCOS NORTE25AA0039 · ₱47,030,654.37 · mapped
- FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LAOAG RIVER, BARANGAY BENGCAG, LAOAG CITY, ILOCOS NORTE25AA0144 · ₱47,028,716.10 · mapped
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATIONSTRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OFFLOOD MITIGATING STRUCTURE ALONG BISLAK RIVER ANDTRIBUTARIES, BARANGAY CABAYO, VINTAR, ILOCOS NORTE24AA0323 · ₱47,026,541.45 · mapped
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/ FACILITIES - CONSTRUCTION OF FLOOD CONTROL PROJECT, BARANGAY 22, SAN CRISTOBAL, SARRAT, ILOCOS NORTE23AA0277 · ₱47,023,060.40 · mapped
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY LA PAZ, LAOAG CITY, ILOCOS NORTE25AA0486 · ₱47,016,434.50 · mapped
- CONSTRUCTION OF FLOOD CONTROL FACILITIES AND STRUCTURES ALONG LAOAG RIVER BRGY. STO. TOMAS, SARRAT, ILOCOS NORTE23AA0479 · ₱46,367,335.03 · mapped
- CONSTRUCTION /MAINTENANCE OF FLOOD MITIGATION STRUCTURES ANDDRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROLSTRUCTURE ALONG PRINCIPAL RIVER AND TRIBUTARIES (BISLAKRIVER), BARANGAY DAGUPAN, VINTAR, ILOCOS NORTE24AA0117 · ₱43,424,956.60 · mapped
- CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SARRAT PADSAN RIVER FROM SARRAT BRIDGE TO RIVERMOUNT, BARANGAY 18 SAN ISIDRO, SARRAT, ILOCOS NORTE24AA0092 · ₱39,199,506.21 · mapped
- FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BISLAK RIVER, BARANGAY ISIC-ISIC, VINTAR, ILOCOS NORTE25AA0064 · ₱37,964,318.05 · mapped
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURESAND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROLSTRUCTURE ALONG BACARRA-VINTAR RIVER AND TRIBUTARIES,BARANGAY CABAYO, VINTAR, ILOCOS NORTE24AA0073 · ₱37,631,848.67 · mapped
- FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BISLAK RIVER, BARANGAY SARICAO, VINTAR, ILOCOS NORTE25AA0061 · ₱37,629,377.42 · mapped
- FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BISLAK RIVER, SITIO SARSARGUELAS, BARANGAY 34, VINTAR, ILOCOS NORTE25AA0065 · ₱37,628,258.22 · mapped
- FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BISLAK RIVER, BARANGAY CABAYO, VINTAR, ILOCOS NORTE25AA0066 · ₱37,624,764.76 · mapped
- FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BISLAK RIVER BARANGAY TAMDAGAN-DIMAMAGA, VINTAR, ILOCOS NORTE25AA0057 · ₱37,619,490.83 · mapped
- FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BISLAK RIVER, BARANGAY ESPERANZA, VINTAR, ILOCOS NORTE25AA0062 · ₱37,609,291.47 · mapped
- FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BISLAK RIVER, BARANGAY DAGUPAN, VINTAR, ILOCOS NORTE25AA0056 · ₱37,605,716.75 · mapped
- FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD MITIGATING STRUCTURE ALONG BACARRA-VINTAR RIVER, BARANGAY 34, CABARUAN, BACARRA, ILOCOS NORTE24AA0554 · ₱36,868,057.70 · mapped
- SIPAG - INTERJURISDICTIONAL ROADS AND/OR BRIDGES (OR, ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS) - CONSTRUCTION OF PIDDIG-DINGRAS DIVERSION ROAD (PIDDIG SECTION), ILOCOS NORTE24AA0190 · ₱36,694,808.98 · mapped
- CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY ESPERANZA, VINTAR, ILOCOS NORTE24AA0094 · ₱32,936,136.36 · mapped
- BIP - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF ROAD, MARIANO MARCOS STATE UNIVERSITY - DINGRAS CAMPUS, DINGRAS, ILOCOS NORTE25AB0105 · ₱29,402,595.34 · mapped
- CONSTRUCTION / MAINTENANCE OFFLOOD MITIGATION STRUCTURES AND DRAINAGESYSTEMS - CONSTRUCTION OF FLOOD CONTROLSTRUCTURE ALONG BISLAK RIVER, BARANGAY SANGIL,BACARRA, ILOCOS NORTE24AA0079 · ₱29,399,757.04 · mapped
- REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS, MANILA NORTH RD - K0564 + 600 - K0565 + 73724A00507 · ₱28,950,000.00 · mapped
Equipment & capacity
PCAB license
No PCAB license is linked to this record. It may be a joint venture, a foreign firm, or a name we could not match. Search PCAB.
Government performance ratings (CPES)
No CPES evaluation lists this contractor's PCAB license in the GPPB releases we loaded (34th–41st).
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →