DRAGON TWELVE BUILDERS is listed as a company organization in Philippine public procurement records on this site, with 448 linked DPWH project(s) totaling about ₱5,819,923,275.78. Recorded delivery grade B (from public DPWH project records — not a finding of wrongdoing).
DRAGON TWELVE BUILDERS
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 448
- Total value
- ₱5,819,923,275.78
- Published flags
- 0
- Region
- Isabela 1st DEO · Region II
Online presence
Google Maps: Dragon twelve builders & Construction Supply★ 4 (4 reviews)Google Maps, 2026-10-22
4R7W+85W, Ilagan City, Isabela
Public Record Grade
A transparent, data-derived summary of reported public records for DRAGON TWELVE BUILDERS — not an accusation or finding of wrongdoing.
Score: 87.80 / 100 · Projects in sample: 448 · As of Oct 22, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 77.7/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 77.7
- lateCompletedProjects
- 7
- onTimeCompletedProjects
- 372
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 431
- pastTargetOngoingProjects
- 52
- undatedCompletedProjectsExcluded
- 17
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 448
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 448
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 448
- componentScore
- —
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 448
- componentScore
- —
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 50 of 447 geotagged projects (largest by contract value) — Open full map
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF BALLACAYU FLOOD CONTROL SYSTEM24BE0105 · ₱144,741,195.00 · mapped
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION / REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AL25BE0043 · ₱144,739,245.45 · mapped
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS- FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE25BE0018 · ₱144,736,094.00 · mapped
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS- FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG CAGAYAN RIVER (PACKAGE25BE0080 · ₱140,407,017.05 · mapped
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS- FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE25BE0023 · ₱96,490,523.30 · mapped
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION / REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AL25BE0041 · ₱96,490,127.25 · mapped
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOOD-FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AL23BE0075 · ₱96,169,296.00 · mapped
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOOD-FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AL23BE0052 · ₱96,165,091.40 · mapped
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF SLOPE PROTECTION STRUCTUR25BE0090 · ₱93,604,972.50 · mapped
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS- FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE25BE0081 · ₱93,604,950.40 · mapped
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AL25BE0079 · ₱93,604,040.10 · mapped
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION / REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALO25BE0042 · ₱90,628,710.95 · mapped
- LOCAL INFRASTRUCTURE PROGRAM - BUILDING AND OTHER STRUCTURE - MULTIPURPOSE/FACILITIES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY NAPACCU PEQUENO, REINA MERCEDES, ISABELA20BG0131 · ₱68,535,161.23 · mapped
- CSSP-BASIC INFRASTRUCTURE PROGRAM-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF ROAD WITH DRAINAGE CANAL OF MUNICIPAL GOVERNMENT CENTER PHASE 2, BRGY. NAPACCU PEQUENO, REINA MER23BG0183 · ₱49,489,505.65 · mapped
- CONSTRUCTION OF BRIDGE APPROACHES WITH CHANNELIZATION OF WATERWAY AT PACULAGU BRIDGE, BARANGAY NAGANACAN, STA. MARIA, ISABELA22BE0043 · ₱49,457,567.25 · mapped
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG CAGAYAN RIVER, BARANGAY CALAMAGUI 2ND, CITY OF ILAGAN, ISABELA23BE0037 · ₱48,994,557.80 · mapped
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG CAGAYAN RIVER, BARANGAY BALIGATAN, CITY OF ILAGAN, ISABELA CITY OF ILAGAN, ISABELA23BE0036 · ₱48,994,260.00 · mapped
- CONSTRUCTION OF FLOOD CONTROL PROJECT ALONG ILAGAN RIVER-PHASE III, BARANGAY CAPO, CITY OF ILAGAN, ISABELA23BE0008 · ₱48,993,132.47 · mapped
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG CAGAYAN RIVER - PHASE II, LUQUILU-CASIBARAG SUR, CABAGAN, ISABELA23BE0007 · ₱48,992,870.67 · mapped
- CONSTRUCTION OF BACULOD BRIDGE RIVER CONTROL STRUCTURE ILAGAN CITY, ISABELA22BE0027 · ₱48,967,650.00 · mapped
- CONSTRUCTION OF LULLUTAN BRIDGE RIVER CONTROL STRUCTURE ILAGAN CITY, ISABELA22BE0034 · ₱48,957,666.50 · mapped
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOOD-FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION OF REINFORCED CONCRETE REVETMENT WITH STEEL PILES (PACKAGE 1)23BE0074 · ₱48,830,980.00 · mapped
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOOD-FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG CAGAYAN RIVER, PHASE III,23BE0081 · ₱48,823,781.50 · mapped
- REPAIR/MAINTENANCE OF FLOOD CONTROL STRUCTURE AT SAN IGNACIO, CITY OF ILAGAN, ISABELA21BE0099 · ₱46,835,564.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM- BASIC INFRASTRUTURE PROGRAM (BIP) - BIP - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG CAGAYAN RIVER, PHASE 4, BARANGAY NGAR25BE0118 · ₱43,205,337.70 · mapped
- REHABILITATION OF MUNICIPAL HALL AT BARANGAY CENTRO, CABAGAN, ISABELA24BE0162 · ₱39,594,791.99 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUTURE PROGRAM (BIP) - BIP - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG CAGAYAN RIVER, PHASE 5, BARANGAY MALA25BE0091 · ₱38,411,925.20 · mapped
- LOCAL INFRASTRUCTURE PROGRAM - BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE / FACILITIES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (MUNICIPAL BUILDING), BARANGAY NAPACCU PEQUEÑO, REINA MERCEDES, ISABELA20BG0136 · ₱34,649,968.78 · mapped
- REPAIR/MAINTENANCE OF FLOOD CONTROL STRUCTURES AT CABISERA 07, CITY OF ILAGAN, ISABELA21BE0095 · ₱32,567,521.60 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR /STRATEGIC PUBLIC BUILDINGS / FACILITIES - CONSTRUCTION OF BARANGAY BUBUG-SANTO TOMAS-QUEZON ROAD, SANTO24BE0091 · ₱29,694,894.10 · mapped
- REHABILITATION OF ROAD ALONG BRGY. BALASIG TO BRGY. MASIPI WEST, CABAGAN, ISABELA23BE0058 · ₱29,693,540.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR /STRATEGIC PUBLIC BUILDINGS / FACILITIES - CONSTRUCTION OF CONCRETE ROAD AT BARANGAY SAN JUAN (LINKING TO24BE0043 · ₱29,692,920.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM- BASIC INFRASTRUCTURE PROGRAM (BIP)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-REHABILITATION OF ROAD LEADING TO CABAGAN SCIENCE ELEMENTARY SCHOOL, BA25BE0040 · ₱29,692,821.25 · mapped
- CONSTRUCTION OF CONCRETE ROAD AT MT. HAMUT, SIMANU NORTE, SAN PABLO, ISABELA23BE0086 · ₱29,684,737.93 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/ REHABILITATION OF WATER SUPPLY/ SEPTAGE AND SEWERAGE/ RAINWATER COLLECTOR SYSTEM - WATER SUPPLY SYSTEM - CONSTRUCTION OF GAMU WATER SYSTEM, GAMU, ISABELA22BG0132 · ₱29,349,992.29 · mapped
- LOCAL PROGRAM - BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE/FACILITIES - LOCAL INFRASTRUCTURE PROGRAM, CONSTRUCTION OF MULTI-PURPOSE BUILDINGS (TERMINAL BUILDING), BRGY. NAPACCU PEQUENO, REINA MERCEDES, ISABELA20BG0135 · ₱29,345,115.37 · mapped
- CONCRETING OF BRGY. TALLAG PROPER-SITIO PUNTA FMR, BRGY. TALLAG, CABAGAN, ISABELA25BE0083 · ₱28,954,395.40 · mapped
- CONSTRUCTION OF ANNARONAN SAN ANTONIO-BALAGAN BRIDGE OVER PACULAGU CREEK CABAGAN, ISABELA20BE0077 · ₱28,214,672.00 · mapped
- CONSTRUCTION OF MARANA-BACULOD BRIDGE RIVER CONTROL ILAGAN CITY, ISABELA20BE0078 · ₱28,214,526.50 · mapped
- CONSTRUCTION OF FLOOD CONTROL PROJECT CALAMAGUI, SAN PABLO, ISABELA19BE0060 · ₱27,930,986.90 · mapped
- CONSTRUCTION OF FLOOD CONTROL PROJECT NGARAG, CABAGAN, ISABELA19BE0021 · ₱27,929,834.55 · mapped
- CONSTRUCTION OF FLOOD CONTROL PROJECT CAPO, ILAGAN CITY, ISABELA19BE0022 · ₱27,929,800.00 · mapped
- REHABILITATION / MAJOR REPAIR OF PERMANENT BRIDGES - MALALAM BR. (B01121LZ) ALONG DAANG MAHARLIKA (LZ) CITY OF ILAGAN, ISABELA23BE0092 · ₱26,153,653.30 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - BRIDGE - REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES - ABUAN BR. (B03237LZ) ALONG ILAGAN-BIGAO-PALANAN RD CITY OF ILAGAN, ISABELA24BE0008 · ₱25,197,676.45 · mapped
- CONSTRUCTION OF 2-STOREY 8-CLASSROOM SCHOOL BUILDING IN AGGUB ELEMENTARY SCHOOL, BRGY. AGGUB, CABAGAN, ISABELA24BE0163 · ₱24,869,843.40 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (PUBLIC MARKET) PHASE 2, BARANGAY NAPPACU PEQUENO, REINA MERCEDES, ISABELA23BG0177 · ₱24,749,989.15 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM- MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, MUNICIPAL BUILDING (PHASE 3), BARANGAY NAPPACU PEQUENO, REINA MERCEDES, ISABELA23BG0178 · ₱24,739,742.01 · mapped
- CONSTRUCTION OF FLOOD CONTROL SYSTEM ALONG PINACANAUAN RIVER, PHASE II, BARANGAY CALIGAYAN, TUMAUINI, ISABELA22BE0006 · ₱24,456,679.00 · mapped
- CONSTRUCTION OF PACULAGU BRIDGE BRGY. NAGANACAN, STA. MARIA, ISABELA21BE0072 · ₱23,756,118.54 · mapped
- CONCRETING OF NAGANACAN PHASE I FMR, BRGY. NAGANACAN, STA. MARIA, ISABELA21BE0090 · ₱23,640,724.90 · mapped
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
