J D LEGASPI CONST is listed as a company organization in Philippine public procurement records on this site, with 43 linked DPWH project(s) totaling about ₱6,262,606,337.99. Recorded delivery grade C (pattern summary from public DPWH/PhilGEPS links — not a finding of wrongdoing).
J D LEGASPI CONST
CRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 43
- Total value
- ₱6,262,606,337.99
- Published flags
- 0
- Region
- Marinduque DEO · National Capital Region
Public Record Grade
A transparent, data-derived summary of reported public records for J D LEGASPI CONST — not an accusation or finding of wrongdoing.
Score: 72.70 / 100 · Projects in sample: 43 · As of Oct 22, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 52.8/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 52.8
- lateCompletedProjects
- 6
- onTimeCompletedProjects
- 25
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 42
- pastTargetOngoingProjects
- 11
- undatedCompletedProjectsExcluded
- 1
- Termination rate
Component score: 93/100 · Weight: 24%
- totalProjects
- 43
- componentScore
- 93
- terminatedProjects
- 1
- terminationRatePct
- 2.3
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0.2
- componentScore
- 100
- projectsWithAbcAndCost
- 43
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 43
- componentScore
- —
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 43
- componentScore
- —
- linkedObservations
- 0
Computed automatically from public DPWH, PhilGEPS and COA records, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
33 geotagged projects — Open full map
- CONSTRUCTION OF ESTERO DE SUNOG APOG PUMPING STATION (HERMOSA STREET), MANILA CITY17O00008 · ₱640,668,196.63
- CONSTRUCTION OF 9TH POST ENGINEER DETACHMENT BUILDING WITH MOTORPOOL, FORT ANDRES BONIFACIO, TAGUIG CITY20O00013 · ₱633,252,446.00 · mapped
- CONSTRUCTION OF BANK PROTECTION WORKS ALONG CHICO RIVER AT PIAT. AND TUAO, CAGAYAN19Z00009 · ₱415,927,487.00 · mapped
- PASIG MARIKINA RIVER CHANNEL IMPROVEMENT PROJECT, PHASE V, CONTRACT PACKAGE 9 - CONSTRUCTION OF MALANDAY PUMPING STATION AND ASSOCIATED WORKS, MARIKINA CITY17Z00021 · ₱399,492,148.24 · mapped
- CONSTRUCTION OF PROFESSIONAL REGULATIONS COMMISSION BUILDING (PHASE III), CENTRAL BUSINESS PART I ISLAND A, MACAPAGAL BOULEVARD, PASAYCITY23O00037 · ₱285,466,561.00 · mapped
- CONSTRUCTION OF UNIVERSITY OF THE PHILIPPINES (UP) DILIMAN COLLEGE OF ARTS AND LETTERS (CAL) BUILDING, PHASE 2, DILIMAN, QUEZON CITY23O00023 · ₱282,521,780.63 · mapped
- CONSTRUCTION OF COOPERATIVE DEVELOPMENT AUTHORITY BUILDING PHASE 1, 827 AURORA BLVD. BRGY. IMMACULATE CONCEPTION, CUBAO, QUEZON CITY CONSTRUCTION OF NATIONAL HEADQUARTERS OF THE COOPERATIVE DEVELOPMENT AUTHORITY (CDA), 827 AURORA BLVD., CUBAO, QUEZON CI21O00067 · ₱281,491,223.18 · mapped
- CONSTRUCTION OF THE PROFESSIONAL REGULATIONS COMMISSION (PRC) OFFICE BUILDING, PHASE IV, CENTRAL BUSINESS PART 1 ISLAND A, PRES. DIOSDADO MACAPAGAL BOULEVARD, PASAY CITY24O00049 · ₱239,287,925.70 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING & SITE DEVELOPMENT AT TCU COMPOUND, BRGY. CENTRAL BICUTAN, TAGUIG CITY20O00050 · ₱225,803,191.00 · mapped
- UPGRADING OF SANTIBAÑEZ PUMPING STATION, PACO, MANILA22O00086 · ₱192,001,813.90 · mapped
- FLOOD CONTROL PROJECT BASED ON FLOOD MASTER PLAN FOR METRO MANILA AND SORROUNDING AREAS, ZAPOTE RIVE18OI0109 · ₱191,422,230.39 · mapped
- REHABILITATION OF BEATA PUMPING STATION (PHASE II), PANDACAN, MANILA22O00079 · ₱187,347,813.00 · mapped
- UPGRADING OF SANTIBAÑEZ PUMPING STATION (PHASE II), PACO, MANILA22O00087 · ₱185,620,512.35 · mapped
- CONSTRUCTION OF NATIONAL HEADQUARTERS OF THE COOPERATIVE DEVELOPMENT AUTHORITY (CDA), 827 AURORA BLVD., CUBAO, QUEZON CITY22O00030 · ₱159,511,170.00 · mapped
- PMRCIP,PHASE V CONTRACT PACKAGE 10-1, RIVER IMPROVEMENT WORKS ALONG UPPER MARIKINA RIVER, STATION 0+500 TO STATION 0+75715OB0471 · ₱150,981,954.46 · mapped
- ROAD UPGRADING (UNPAVED TO PAVED) OF SIBUYAN CIRCUMFERENTIAL ROAD, SIBUYAN, ROMBLON (K0068+919-K0070+194; K0070+448-K0071+283; K0071+434-K0071+490; K0076+138-K0078+633; K0078+983-K0079+249; K0079+577-K0081+060; K0081+776-K0082+297)17E00069 · ₱137,983,226.40
- NETWORK DEVELOPMENT-WIDENING OF PERMANENT BRIDGES - RAMOS BR. (B02776LZ) ALONG JUDGE JOSE DE VENECIA SR AVE.18A00013 · ₱104,196,834.71 · mapped
- PROPOSED CONSTRUCTION OF THE DEPARTMENT OF AGRICULTURE (DA) REGIONAL OFFICE III BUILDING, DMGC, BARANGAY MAIMPIS, CITY OF SAN FERNANDO, PAMPANGA, PROVINCE OF PAMPANGA17C00068 · ₱101,099,689.48 · mapped
- CONSTRUCTION OF BALOGO-KILO-KILO ROAD, STA. CRUZ, MARINDUQUE, PHASE 322EA0139 · ₱98,993,927.23 · mapped
- REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS, DR. DAMIAN REYES RD (BOAC SIDE), K0015+799-K0016+00221EA0028 · ₱96,106,216.39 · mapped
- NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/NEW ROADS, DR. DAMIAN REYES MEMORIAL ROAD, STA. 38+830-STA. 39+80022EA0213 · ₱96,011,332.39 · mapped
- NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/ NEW ROADS, DR. DAMIAN REYES MEMORIAL ROAD, STA. 37+860 - STA. 38+83022EA0212 · ₱96,011,205.47 · mapped
- CONSTRUCTION OF THE PROFESSIONAL REGULATIONS COMMISSION (PRC) BUILDING PHASE II, CENTRAL BUSINESS PART I ISLAND A, MACAPAGAL BOULEVARD, PASAY CITY22O00101 · ₱95,073,989.02 · mapped
- NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING SECONDARY ROADS, MARINDUQUE CIRCUMFERENTIAL RD-K0048+000-K0050+00022EA0070 · ₱94,728,204.56 · mapped
- REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS OF TIGWI-DAMPULAN-LIPATA-YOOK-BUENAVI18EA0040 · ₱77,860,774.34 · mapped
- CONST./REHAB. OF FLOOD CONTROL STRUCTURES AT F. MANALO ST., BRGY. BATIS, SAN JUAN CITY, PHASE I & II16O00042 · ₱71,253,000.00
- REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE, CATARMAN - CALBAYOG ROAD, KO783+400 - KO783+550; KO784+100 - KO784+150, CATARMAN, NORTHERN SAMAR 1ST LD18I00044 · ₱69,682,036.80 · mapped
- CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS-CONSTRUCTION/REHABILITATION OF ORANI CHANNEL (INFRONT OF PANTALAN BAGO TO TATLONG BUTAS) ORANI, BATAAN16CA0042 · ₱62,933,660.64 · mapped
- CONSTRUCTION OF CONCRETE DIKE FLOOD CONTROL STRUCTURE ALONG BOAC RIVER AT BRGY. SANTOL-MURALLON SECT18EA0062 · ₱57,040,352.77 · mapped
- OFF-CARRIAGEWAY IMPROVEMENT OF MARINDUQUE CIRCUMFERENTIAL RD - K0003 + 264 - K0004 + 463, K0004 + 600 - K0005 + 300, K0009 + 386 - K0010 + 07618EA0079 · ₱56,334,861.58 · mapped
- CONSTRUCTION OF REVETMENT ALONG LABANGAN CHANNEL IBA SECTION HAGONOY, BULACAN17CC0086 · ₱46,233,641.22
- CONSTRUCTION OF REVETMENT ALONG ANGAT RIVER STO. NINO SECTION CALUMPIT, BULACAN17CC0089 · ₱46,233,352.82
- CONSTRUCTION OF REVETMENT ALONG ANGAT RIVER CALIZON SECTION CALUMPIT, BULACAN17CC0087 · ₱46,233,352.82
- CONSTRUCTION OF REVETMENT ALONG ANGAT RIVER POBLACION SECTION CALUMPIT, BULACAN17CC0088 · ₱46,233,352.82
- SLOPE PROTECTION/BANK IMPROVEMENT OF LIBERTAD CHANNEL (MACAPAGAL BLVD. TO DIOKNO BLVD. (PHASE I),PAS16OH0039 · ₱46,094,436.91
- SLOPE PROTECTION/BANK IMPROVEMENT OF LIBERTAD CHANNEL (MACAPAGAL BLVD. TO DIOKNO BLVD.)(PHASE II),PA16OH0040 · ₱46,053,206.67
- REHABILITATION/CONSTRUCTION OF SLOPE PROTECTION ALONG LAKESHORE PARK, TAGUIG CITY18OB0252 · ₱45,812,571.50 · mapped
- CONSTRUCTION OF TABI FLOOD CONTROL STRUCTURE18EA0058 · ₱42,143,729.05 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG STA. MARIA RIVER (PHASE III - LEFT SIDE), STA. MARIA, BULACAN17CD0020 · ₱38,013,063.09 · mapped
- REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGE VALDEZ BRIDGE (B01522LZ) ALONG SAN ANTONIO-FLORIDABL15CH0112 · ₱28,895,137.27 · mapped
- CONSTRUCTION OF CONCRETE DIKE FLOOD CONTROL STRUCTURE ALONG BOAC RIVER AT BRGY. TANZA18EA0052 · ₱23,751,190.42 · mapped
- REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES, GENGAROG BR.(B00014SM) ALONG POBLACION - GENGAROG - TUBIGDANAO - SAN LORENZO - BONGLAS - MANDUGANG RD, SAN JOSE, N. SAMAR17IH0013 · ₱13,478,753.15 · mapped
- CONSTRUCTION OF 2 STOREY 6 CLASSROOM SCHOOL BUILDING, MONDRAGON AGRO-INDUSTRIAL HIGH SCHOOL, MONDRAGON, N. SAMAR17IH0033 · ₱7,324,784.99
Across government
No DepEd or DOH contract awards matched to this name in PhilGEPS records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
