AMETHYST HORIZON BUILDERS AND GEN CONTRACTOR AND DEVELOPMENT CORP is listed as a company organization in Philippine public procurement records on this site, with 154 linked DPWH project(s) totaling about ₱9,606,683,016.18. Recorded delivery grade C (from public DPWH project records — not a finding of wrongdoing).
AMETHYST HORIZON BUILDERS AND GEN CONTRACTOR AND DEVELOPMENT CORP
CGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 154
- Total value
- ₱9,606,683,016.18
- Published flags
- 12
- Region
- South Manila DEO · National Capital Region
Public Record Grade
A transparent, data-derived summary of reported public records for AMETHYST HORIZON BUILDERS AND GEN CONTRACTOR AND DEVELOPMENT CORP — not an accusation or finding of wrongdoing.
Score: 74.60 / 100 · Projects in sample: 154 · As of Oct 28, 2026 UTC
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 49.2/100 · Weight: 47%
- graceDays
- 30
- componentScore
- 49.2
- lateCompletedProjects
- 2
- onTimeCompletedProjects
- 93
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 143
- pastTargetOngoingProjects
- 48
- undatedCompletedProjectsExcluded
- 9
- Termination rate
Component score: 96.1/100 · Weight: 21%
- totalProjects
- 154
- componentScore
- 96.1
- terminatedProjects
- 2
- terminationRatePct
- 1.3
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 21%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 153
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
Component score: 98.4/100 · Weight: 11%
- projects
- 154
- componentScore
- 98.4
- flagsPerProject
- 0.05
- publishedV2Flags
- 8
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 154
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 50 of 152 geotagged projects (largest by contract value) — Open full map · Download projects (CSV)
- Construction of Road Dike/Esplanade along Sitio Anduyanan, Paluan, Occidental Mindoro24E00035 · ₱289,495,739.80 · mapped
- CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF BANK PROTECTION STRUCTURE WITH ROAD DIKE ALONG LUMINTAO RIVER, BRGY. MAGSIKAP AND BRGY. MALAWAAN (DOWNSTREAM), RIZAL, OCC. MINDORO25E00025 · ₱225,581,984.39 · mapped
- Construction of Flood Control Structure along Cavillan River Upstream, Bulalacao, Oriental Mindoro23E00204 · ₱202,647,244.30 · mapped
- CONVERGENCE & SPL. SUPPORT PROG.-SUSTAINABLE INFRA PROJS. ALLEVIATING GAPS (SIPAG)-ACCESS RDS. AND/OR BRS. FR. THE NAT'L. ROAD/S LEAD. TO MAJOR/STRATEGIC PUBLIC BLDG.S/FACILITIES-CONST. OF RD., BRGY. LIYANG, PILAR TO BRGY. BILOLO, ORION, BATAAN PACKAGE 223C00106 · ₱192,999,983.97 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY BATANG - BARANGAY GARAWON, HERNANI, EASTERN SAMAR24I00046 · ₱192,393,616.92 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TAFT RIVER, BARANGAY SAN PABLO, TAFT, EASTERN SAMAR24I00045 · ₱191,893,728.47 · mapped
- FY 2024 DPWH INFRASTRUCTURE PROGRAMORGANIZATIONAL OUTCOME 1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMNETWORK DEVELOPMENT PROGRAMCONSTRUCTION OF BY-PASS AND DIVERSION ROADSPADRE BURGOS BY-PASS ROAD, QUEZON (PACKAGE 4)24D00148 · ₱189,140,525.20 · mapped
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF EAST COASTAL ROAD, BRGY. PAGKAKAISA SECTION, PTO. PRINCESA CITY, PALAWAN24E00179 · ₱186,244,883.56 · mapped
- REHABILITATION OF ROAD AND DRAINAGE (REINFORCED CONCRETE BOX CULVERT) ALONG PATIIS ROAD, SAN MATEO, RIZAL23D00197 · ₱172,854,178.20 · mapped
- CONSTRUCTION OF NEW ILOILO CITY DISTRICT JAIL BUILDING PHASE II, BRGY. BUNTATALA, LEGANES, ILOILO24G00062 · ₱154,400,000.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM- BASIC INFRASTRUCTURE PROGRAM (BIP)- CONSTRUCTION OF CRUISE PORT AND FACILITIES, PACKAGE H, PUERTO PRINCESA CITY, PALAWAN24E00136 · ₱154,289,820.29 · mapped
- COMPLETION OF 4-STOREY 32-CLASSROOM AT PARANG ELEMENTARY SCHOOL, BARANGAY PARANG, MARIKINA CITY24OB0500 · ₱147,730,042.64 · mapped
- DAANG MAHARLIKA (LZ) - K0156 + 911 - K0156 + 932, K0157 + 000 - K0157 + 150, K0158 + -672 - K0158 + -500, K0158 + 1140 - K0159 + 000, K0159 + 940 - K0159 + 1045, K0160 + 000 - K0160 + 150, K0160 + 560 - K0161 + 070, K0161 + 230- K0161 + 255, K0162 + 464 -24D00153 · ₱140,419,370.65 · mapped
- ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF SLOPE PROTECTION STRUCTURE25DD0001 · ₱140,407,500.00 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG HAMTIC RIVER AT HAMTIC BRIDGE (ABUTMENT B, UPSTREAM),24GB0076 · ₱135,100,000.00 · mapped
- LOCAL PROGRAM -NATIONAL BUILDING PROGRAM-BUILDINGS AND OTHER STRUCTURES-MULTI-PURPOSE/FACILITIES-CONSTRUCTION OF CANCER TREATMENT BUILDING AT OSPITAL NG MAYNILA24OH0099 · ₱120,617,597.05 · mapped
- CONSTRUCTION OF COLLEGE BUILDING, THE UNIVERSIDAD DE MANILA, TONDO, MANILA24OE0190 · ₱118,784,605.00 · mapped
- NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING-SECONDARY ROADS, MARINDUQUE CIRCUMFERENTIAL RD - K0081+598-K0082+000, K0082+761 - K0083+000, K0086+000-K0087+39825EA0017 · ₱108,042,890.23 · mapped
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SABO DAM ALONG MADONGAN RIVER, NUEVA ERA, ILOCOS NORTE24A00225 · ₱106,149,871.34 · mapped
- Construction of Flood Control Structure along Agdangan River (Phase II), Agdangan, Quezon23DM0063 · ₱99,000,000.00 · mapped
- CONSTRUCTION OF 7-STOREY MULTI-PURPOSE BUILDING AT ANDRES BONIFACIO INTEGRATED SCHOOL, MANDALUYONG CITY, PACKAGE 124OB0235 · ₱97,513,791.93 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, ZONE 1-12, TONDO, MANILA25OE0200 · ₱97,142,919.03 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE PHASE II AT DATAG RIVER (DOW24HM0013 · ₱96,500,000.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF RIVER CAPACITY ENHANCEMENT STRUCTURE ALONG UPPER MARIKINA RIVER, BRGY. STA.24DO0085 · ₱96,500,000.00 · mapped
- Construction of Riverbank Protection Structure along Balagtas River, Barangay Dalig, Balagtas, Bulacan24CC0005 · ₱96,499,605.25 · mapped
- FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MAASIM RIVER (PACKAGE 1),BRGY.UPIG, SAN ILDEFONSOL,BUL24C00470 · ₱96,499,584.95 · mapped
- REHABILITATION OF EXISTING DIKE ALONG RIO CHICO RIVER, PACKAGE H, (CASTILLO SECTION, RIGHT BANK), CONCEPCION, TARLAC24CK0053 · ₱96,497,299.50 · mapped
- CONSTRUCTION OF SLOPE PROTECTION ALONG BUCAO RIVER, DOWNSTREAM, NORTH APPROACH, BOTOLAN, ZAMBALES, PHASE III24CL0026 · ₱96,497,246.20 · mapped
- CONSTRUCTION OF MANUEL PERALTA LATIAN DATAL ANGGAS-ALABEL BYPASS ROAD, MALITA, DAVAO OCCIDENTAL23LE0047 · ₱96,490,658.29 · mapped
- CONSTRUCTION OF ROAD, SITIO KALAPE, BRGY. LAIS, MALITA, DAVAO OCCIDENTAL23LE0042 · ₱96,490,396.28 · mapped
- CONSTRUCTION OF J. ABAD SANTOS GENERAL HOSPITAL (PHASE II), MANILA CITY24OE0079 · ₱96,461,830.65 · mapped
- REHABILITATION OF EXISTING DIKE ALONG RIO CHICO RIVER, (MATAYUMTAYUM SECTION, RIGHT BANK), U/S OF RIO CHICO BRIDGE PHASE 2, STA. 14+837.48 TO STA. 15+278.69, LA PAZ, TARLAC24CK0046 · ₱96,410,247.10 · mapped
- CONSTRUCTION OF MALOMA RIVER FLOOD CONTROL STRUCTURE, UPSTREAM, PACKAGE 1, SAGPAT SECTION, SAN FELIPE, ZAMBALES24CL0063 · ₱95,158,342.72 · mapped
- CONSTRUCTION OF MALOMA RIVER FLOOD CONTROL STRUCTURE, DOWNSTREAM, PACKAGE 1, SAN FELIPE, ZAMBALES24CL0005 · ₱95,100,675.38 · mapped
- CONSTRUCTION OF MALOMA RIVER FLOOD CONTROL STRUCTURE, DOWNSTREAM, PACKAGE 2, SAN FELIPE, ZAMBALES24CL0006 · ₱95,100,622.54 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LAUIS RIVER, PHASE VII, CANDELARIA, ZAMBALES24CL0069 · ₱95,052,447.71 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LAUIS RIVER, PHASE VI, CANDELARIA, ZAMBALES24CL0068 · ₱95,052,432.95 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LAUIS RIVER, PHASE IX, CANDELARIA, ZAMBALES24CL0067 · ₱95,052,411.59 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, REHABILITATION OF FLOOD CONTROL STRUCTURE PHASE II AT LIKI RIVER24HM0105 · ₱94,569,965.04 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (EVACUATION CENTER) AT BARANGAY LA HUERTA,PARAÑAQUE CITY, METRO MANILA25OC0079 · ₱94,569,403.97 · mapped
- CONSTRUCTION OF RIVER PROTECTION STRUCTURE, BAYANBAYANAN BRIDGE UPSTREAM, SAN PEDRO CITY, LAQUNA25DI0010 · ₱94,191,666.90 · mapped
- Rehabilitation of Revetment along Landayan Waterways (near Landayan Road), Barangay Landayan, City of San Pedro, Laguna24DI0034 · ₱94,087,500.00 · mapped
- CONSTRUCTION OF RIVER PROTECTION STRUCTURE, PARK SPRING VILLAGE, SAN PEDRO CITY, LAGUNA25DI0005 · ₱94,039,250.00 · mapped
- Construction of Flood Control Wall along Sapang Alat Creek, Sta. 3+296 to 3+648, Caloocan City23OD0138 · ₱94,021,597.95 · mapped
- ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF SLOPE PROTECTION STRUCTURE25DD0003 · ₱93,601,980.42 · mapped
- CONSTRUCTION OF DAMPALIT RIVERWALL (KAYLANAN CREEK) PHASE 11, MALABON CITY25OA0013 · ₱93,579,761.48 · mapped
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG SAPANG LABO CREEK (PHASE 1), SAN MATEO, RIZAL24DO0046 · ₱92,157,494.60 · mapped
- Construction of Drainage System along Libertad Main (From Roxas Blvd to Taft Avenue, Pasay City, Sta 0 + 322 to Sta 0 + 483), Phase 524OH0040 · ₱89,071,419.94 · mapped
- REHABILITATION OF FLOOD MITIGATION STRUCTURE ALONG SAN JUAN RIVER (PHASE XLVI), QUEZON CITY24OG0103 · ₱87,811,255.84 · mapped
- Construction of Concrete Revetment (RC Cut-off Wall), Pangian Flood Control, Malita, Davao Occidental23LE0017 · ₱86,840,559.07 · mapped
Equipment & capacity
PCAB license
No PCAB license is linked to this record. It may be a joint venture, a foreign firm, or a name we could not match. Search PCAB.
Government performance ratings (CPES)
No CPES evaluation lists this contractor's PCAB license in the GPPB releases we loaded (34th–41st).
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
- DPWH Infrastructure: 178 awards · ₱11,203,613,569.45
- Municipality of El Nido, Palawan Infrastructure: 1 award · ₱145,470,396.16
- City of Pasig Infrastructure: 1 award · ₱35,990,000.00
- 24C00663₱95,061,251.97· 2025-12-02· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - REGION III
- 25A00503
- Construction Projects₱97,142,919.03· 2025-06-19· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - NORTH MANILA DEO
- 24HM0105 (Re-IB)₱94,569,965.04· 2025-06-03· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - SIQUIJOR DEO
- 25A00491
- Contract ID No. 25OB0308 - Construction (Completi₱94,569,345.07· 2025-05-13· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - METRO MANILA 1ST E
- Contract ID No. 25OB0354 - Construction (Completi₱57,932,816.10· 2025-05-13· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - METRO MANILA 1ST E
- 25O00102
- 24A00675
- 25DB0087 - Convergence and Special Support Progra
- Construction of Multi-Purpose Building₱94,569,403.97· 2025-03-18· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - METRO MANILA 2ND D
- 25OI0037₱41,962,791.77· 2025-03-17· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - LAS PINAS- MUNTINL
- Contract ID No. 25OB0332 - Construction of Multi₱145,470,415.47· 2025-03-14· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - METRO MANILA 1ST E
- 25EA0017₱108,054,389.74· 2025-03-10· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - MARINDUQUE DEO
- 25OG0017₱48,011,637.45· 2025-02-13· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - QUEZON CITY 2ND ED
- 25OA0013₱93,579,761.48· 2025-02-12· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - MALABON-NAVOTAS SD
- 25DI0031₱38,702,165.00· 2025-02-11· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - LAGUNA II DEO
- 25DI0010₱94,191,666.90· 2025-02-11· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - LAGUNA II DEO
- 25DI0005₱94,039,250.00· 2025-02-11· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - LAGUNA II DEO
- 25DD0003₱93,601,980.42· 2025-02-10· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - BATANGAS IV DEO
- 25DD0001₱140,407,500.00· 2025-02-10· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - BATANGAS IV DEO
- 25E00025₱225,581,984.39· 2025-02-07· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - REGION IV-B
- 25DI0032₱47,752,035.51· 2025-01-31· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - LAGUNA II DEO
- Contract ID No. 24OB0514 - Construction (Complet₱48,757,102.50· 2025-01-09· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - METRO MANILA 1ST E
- Contract ID No. 24OB0515 - Construction of Multi₱48,757,617.42· 2025-01-09· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - METRO MANILA 1ST E
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →