Construction of Flood Control System along Abra River Upstream and Downstream of Calungbuyan Bridge, Santa, Ilocos Sur
Construction of Flood Control System along Abra River Upstream and Downstream of Calungbuyan Bridge, Santa, Ilocos Sur is a DPWH-tracked public work in SANTA (ILOCOS SUR), ILOCOS SUR, Region I. Reported contract value: ₱104,218,299.80. Status: Reported complete (DPWH). Contractor on record: BET CONST & SUPPLY / M G LUALHATI CONST CORP. Figures trace to sumbong.
Total Contract Cost
