FLOOD MANAGEMENT PROGRAM -CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF MINANTE 1 FLOOD CONTROL STRUCTURE, PHASE 2, BARANGAY MINANTE 1, CAUAYAN CITY, ISABELA

FLOOD MANAGEMENT PROGRAM -CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF MINANTE 1 FLOOD CONTROL STRUCTURE, PHASE 2, BARANGAY MINANTE 1, CAUAYAN CITY, ISABELA is a DPWH-tracked public work in Isabela 4th DEO, Region II. Reported contract value: ₱144,431,737.76. Status: Past target date (DPWH On-Going). Contractor on record: EDDMARI CONST. Figures trace to dpwh.

Isabela 4th DEO, Region II
Region: Region II

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2024 · ₱50,000 (shared by many projects, not this project's own line)

    Possible match · score 0.84

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    ₱144,431,738 · EDDMARI CONSTRUCTION AND TRADING

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    81% reported · imagery 2022-10-17 → 2025-06-02

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: FLOOD MANAGEMENT PROGRAM -CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF MINANTE 1 FLOOD CONTROL STRUCTURE, PHASE 2, BARANGAY MINANTE 1, CAUAYAN CITY, ISABELA

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 84%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Dammang West Flood Control Structure, Echague, Isabela
GAA fiscal year
FY2024
DBM GAA source document

2. Allotment

Agency-level releases for FY2024, not tied to this contract

Isabela 4th DEO · SARO 1,917 (₱267,033,855,698.00) · NCA 1,287 (₱846,238,484,493.07)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

24BH0342

₱144,431,737.76 · EDDMARI CONSTRUCTION AND TRADING

Contractor

Not graded

181 projects · ₱8.8B total · 0 flags

Other projects by this contractor

No sat.

NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, LUBAO-GUAGUA-MINALIN-STO. TOMAS ROAD (STO. TOMAS-MINALIN SECTION), PACKAGE 5 AND PACKAGE 6, PROVINCE OF PAMPANGA

Region III, Region III

2023₱243.2M
Past target date (DPWH On-Going)
No sat.

NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, LUBAO-GUAGUA-MINALIN-STO. TOMAS ROAD (STO. TOMAS-MINALIN SECTION), PACKAGE 4, PROVINCE OF PAMPANGA

Region III, Region III

2021₱214.2M
Reported complete (DPWH)
No sat.

LOCAL INFRASTRUCTURE PROGRAM (LIP) -NATIONAL ROADS, CONSTRUCTION OF APALIT BYPASS ROAD CONNECTING TWO PROVINCES IN REGION III, BULACAN AND PAMPANGA

Region III, Region III

2017₱198.0M
Reported complete (DPWH)
No sat.

NETWORK DEVELOPMENT-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, LUBAO-GUAGUA-MINALIN-STO. TOMAS ROAD (STO. TOMAS-MINALIN SECTION), PACKAGE 2, PROVINCE OF PAMPANGA

Region III, Region III

2020₱193.0M
Reported complete (DPWH)
No sat.

CONST./REP/REHAB./IMPR'VT. OF VARIOUS INFRA INCLUDING LOCAL PROJECTS-LOCAL ROADS & BRIDGES-LOCAL ROADS-REHAB./IMPR'VT. (UPGRADING & WIDENING TO 4-LANES WITH CONCRETE SLOPE PROTECTION) OF SAN MATIAS-STO. ROSARIO PAU ROAD, STO. TOMAS, PAMPANGA

Region III, Region III

2021₱193.0M
Reported complete (DPWH)

REHABILITATION/RESTORATION OF DETERIORATED DIKES/ERODED RIVERBANKS ALONG PAMPANGA RIVER INCLUDING CANDABA CUT-OFF CHANNEL, CANDABA, PAMPANGA (INLCUDING ROW), CANDABA AND SAN SIMON, PAMPANGA

Flood Control Management Cluster, Central Office

2018₱174.3M
Reported complete (DPWH)
View all 181 projects →

4. Implementation

Contract Amount

₱144,431,737.76

Progress

Past target date (DPWH On-Going)

Start Date

April 15, 2025

Target End

June 19, 2026

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region II (Cagayan Valley)IsabelaCity of CauayanMinante I
Storms whose wind field reached it
Peilou 2026Fung-Wong 2025Matmo 2025Ragasa 2025Mitag 2025
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
Dry conditions likelyPAGASA · 2026-10-07El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.