Construction of Flood Mitigation Structure24BG0059

Construction of Flood Mitigation Structure along Magat River, Turod Section, Reina Mercedes, Isabela Package 2

Construction of Flood Mitigation Structure along Magat River, Turod Section, Reina Mercedes, Isabela Package 2 is a DPWH-tracked public work in REINA MERCEDES (ISABELA), ISABELA, Region II. Reported contract value: ₱144,724,873.40. Status: Reported complete (DPWH). Contractor on record: ROAD EDGE TRADING & DEVELOPMENT SERVICES. Figures trace to sumbong.

REINA MERCEDES (ISABELA), ISABELA, Region II
Region: Region II

Money Trail

1. Appropriation

Probable match · score 93%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Mitigation Structure along Cagayan River, Roxas Section, Naguilian, Isabela
GAA fiscal year
FY2024
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-BMB-B-24-0019638

₱-685,078,986.00 · FY2024

Released to Central Office (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-ROII-24-0003846

₱276,213.00 · FY2024

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-ROII-24-0004352

₱1,853,487.00 · FY2024

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-ROII-24-0010584

₱135,000.00 · FY2024

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-ROII-24-0004354

₱173,574.00 · FY2024

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-ROII-24-0009805

₱1,459,000.00 · FY2024

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

83 projects · ₱5.7B total · 15 flags

Other projects by this contractor

OO2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG CAGAYAN RIVER, BUENAVISTA

Isabela 3rd DEO, Region II

2024₱144.7M
Reported complete (DPWH)
No sat.

OO2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG CAGAYAN RIVER, DAMMAO SEC

Isabela 3rd DEO, Region II

2024₱144.7M
Past target date (DPWH On-Going)
No sat.

REHAB./RECONST. OF ROAD WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG PORT BARTON TO BRGY. KEMDENG ROAD, STA. 014+050.00-STA. 014+360.00, SAN VICENTE, PALAWAN

Region IV-B, Region IV-B

2022₱122.9M
Reported complete (DPWH)

Construction of Flood Control Structure along Dangoan River, Package 2, Medina, Misamis Oriental

MEDINA (MISAMIS ORIENTAL), MISAMIS ORIENTAL, Region X

2024₱120.6M
Reported complete (DPWH)

Construction of Flood Control Structure along Dangoan River, Package 3, Medina, Misamis Oriental

MEDINA (MISAMIS ORIENTAL), MISAMIS ORIENTAL, Region X

2024₱120.6M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM - FLOOD MITIGATION STRUCTURE PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES-CONSTRUCTION OF CAGAYAN RIVER FLOOD CONTROL PROJECT, BRGY. ROXAS (STA. 0+000 - STA. 0+510) NAGUILIAN, ISABELA

Isabela 3rd DEO, Region II

2023₱99.0M
Past target date (DPWH On-Going)
View all 83 projects →

4. Implementation

Contract Amount

₱144,724,873.40

Progress

Reported complete (DPWH)

Start Date

March 27, 2024

Target End

March 9, 2025

5. Audit