Roads22E00101

REHAB./RECONST. OF ROAD WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG PORT BARTON TO BRGY. KEMDENG ROAD, STA. 014+050.00-STA. 014+360.00, SAN VICENTE, PALAWAN

REHAB./RECONST. OF ROAD WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG PORT BARTON TO BRGY. KEMDENG ROAD, STA. 014+050.00-STA. 014+360.00, SAN VICENTE, PALAWAN is a DPWH-tracked public work in Region IV-B, Region IV-B. Reported contract value: ₱122,938,481.78. Status: Reported complete (DPWH). Contractor on record: ROAD EDGE TRADING & DEVELOPMENT SERVICES. Figures trace to dpwh.

Region IV-B, Region IV-B
Region: Region IV-B

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2022 GAA. DBM GAA FY2022

2. Allotment

No matching SARO/NCA release found for this project. Source: DBM SARO/NCA listings.

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

83 projects · ₱5.7B total · 15 flags

Other projects by this contractor

OO2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG CAGAYAN RIVER, BUENAVISTA

Isabela 3rd DEO, Region II

2024₱144.7M
Reported complete (DPWH)
No sat.

OO2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG CAGAYAN RIVER, DAMMAO SEC

Isabela 3rd DEO, Region II

2024₱144.7M
Past target date (DPWH On-Going)

Construction of Flood Mitigation Structure along Magat River, Turod Section, Reina Mercedes, Isabela Package 2

REINA MERCEDES (ISABELA), ISABELA, Region II

2024₱144.7M
Reported complete (DPWH)

Construction of Flood Control Structure along Dangoan River, Package 2, Medina, Misamis Oriental

MEDINA (MISAMIS ORIENTAL), MISAMIS ORIENTAL, Region X

2024₱120.6M
Reported complete (DPWH)

Construction of Flood Control Structure along Dangoan River, Package 3, Medina, Misamis Oriental

MEDINA (MISAMIS ORIENTAL), MISAMIS ORIENTAL, Region X

2024₱120.6M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM - FLOOD MITIGATION STRUCTURE PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES-CONSTRUCTION OF CAGAYAN RIVER FLOOD CONTROL PROJECT, BRGY. ROXAS (STA. 0+000 - STA. 0+510) NAGUILIAN, ISABELA

Isabela 3rd DEO, Region II

2023₱99.0M
Past target date (DPWH On-Going)
View all 83 projects →

4. Implementation

Contract Amount

₱122,938,481.78

Progress

Reported complete (DPWH)

Start Date

January 11, 2023

Target End

September 13, 2023

5. Audit