LOCAL PROGRAM: FLOOD CONTROL AND DRAINAGE/ FLOOD CONTROL STRUCTURES/ FACILITIES-LOCAL INFRASTRUCTURE PROGRAM-CONSTRUCTION OF ARCON FLOOD CONTROL SYSTEM, PHASE II
LOCAL PROGRAM: FLOOD CONTROL AND DRAINAGE/FLOOD CONTROL STRUCTURES/FACILITIES-LOCAL INFRASTRUCTURE PROGRAM-CONSTRUCTION OF ARCON FLOOD CONTROL SYSTEM, PHASE II is a DPWH-tracked public work in Region II, Region II. Reported contract value: ₱112,875,480.45. Status: Reported complete (DPWH). Contractor on record: EGB CONST CORP FORMERLY: EGB CONST. Figures trace to dpwh.
Total Contract Cost


