A P B CONST is listed as a company organization in Philippine public procurement records on this site, with 202 linked DPWH project(s) totaling about ₱7,500,256,052.87. Recorded delivery grade B (from public DPWH project records — not a finding of wrongdoing).
A P B CONST
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 202
- Total value
- ₱7,500,256,052.87
- Published flags
- 1
- Region
- Region I · Region I
Licensed officers (PCAB)
- Armando P. Baldonado, Sr. · Authorized Managing Officer (PCAB license 17055) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for A P B CONST — not an accusation or finding of wrongdoing.
Score: 86.90 / 100 · Projects in sample: 202 · As of Oct 28, 2026 UTC
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 74.1/100 · Weight: 47%
- graceDays
- 30
- componentScore
- 74.1
- lateCompletedProjects
- 38
- onTimeCompletedProjects
- 144
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 201
- pastTargetOngoingProjects
- 19
- undatedCompletedProjectsExcluded
- 1
- Termination rate
Component score: 100/100 · Weight: 21%
- totalProjects
- 202
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 21%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 202
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
Component score: 99.9/100 · Weight: 11%
- projects
- 202
- componentScore
- 99.9
- flagsPerProject
- 0
- publishedV2Flags
- 1
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 202
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 50 of 185 geotagged projects (largest by contract value) — Open full map · Download projects (CSV)
- CONSTRUCTION OF MISSING LINKS/NEW ROADS, BANTAY (ILOCOS SUR) - SAN QUINTIN - LANGIDEN (ABRA) ROAD, ILOCOS SUR (PACKAGE 5)24A00012 · ₱153,999,998.17 · mapped
- WIDENING OF PERMANENT BRIDGES - BADOC PARALLEL BR. (B00564LZ) ALONG MANILA NORTH RD23A00145 · ₱153,434,949.71 · mapped
- CONSTRUCTION OF MISSING LINKS/NEW ROADS, ROAD CONNECTING SANTA-RANCHO ROAD (S00089LZ) AND SANTA-CAOAYAN ROAD, ILOCOS SUR24A00360 · ₱149,650,776.94 · mapped
- CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) VIGAN BOARDWALK ROAD LEADING TO THE HERITAGE VILLAGE, VIGAN CITY, ILOCOS SUR22A00136 · ₱144,636,000.00 · mapped
- CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD CONTROL MITIGATION FACILITIES ALONG AMBURAYAN RIVER BASIN, BRGY. BIO-BUCAO - EAST BUCAO - WEST-SAN MIGUEL, TAGUDIN, ILOCOS SU19A00039 · ₱115,791,177.89 · mapped
- CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, BAUANG-SAN FERNANDO-SAN JUAN BYPASS ROAD, (SAN FERNANDO-SAN JUAN SECTION), LA UNION21A00150 · ₱106,150,000.00 · mapped
- CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM - ROLL-IT) - BALIGI-BOTIGUE-CABULALAAN-CALAOAGAN ROAD LEADING TO DAIRY AND SUKA MUSCOVADO P21A00134 · ₱104,625,300.00 · mapped
- CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS, PORO POINT FREEPORT ZONE SEAPORT ROAD NETWORK, SAN FERNANDO CITY, LA UNION19A00014 · ₱101,325,000.00 · mapped
- CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES, PORO POINT FREEPORT ZONE, SAN FERNANDO CITY, LA UNION19A00013 · ₱101,325,000.00 · mapped
- CONSTRUCTION OF MISSING LINKS/NEW ROADS, BANTAY (ILOCOS SUR) - SAN QUINTIN - LANGIDEN (ABRA) ROAD, ILOCOS SUR22A00041 · ₱101,325,000.00 · mapped
- BASIC INFRASTRUCTURE PROGRAM (BIP), CONSTRUCTION OF ROAD, BANTAY (ILOCOS SUR) - SAN QUINTIN - LANGUIDEN (ABRA) ROAD, ILOCOS SUR (PACKAGE 4)23A00280 · ₱101,324,995.95 · mapped
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM-TRIP) - VIGAN BOARDWALK ROAD LEADING TO THE HERITAGE VILLAGE, VIGAN CITY, ILOCOS SUR, PACKAGE II21A00050 · ₱101,166,000.00 · mapped
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM-ROLL-IT), POBLACION-PUGUIL-TUBADAY ROAD CONNECTING BALAOAN-SANTOL ROAD IN SUPPORT TO SOFT BR21A00108 · ₱99,630,460.00 · mapped
- CONSTRUCTION OF MISSING LINKS/NEW ROADS, BANTAY (ILOCOS SUR) - SAN QUINTIN - LANGIDEN (ABRA) ROAD, ILOCOS SUR23A00070 · ₱99,407,213.43 · mapped
- LOCAL INFRASTRUCTURE PROGRAM - CONSTRUCTION OF MISSING LINKS / NEW ROADS - SANTOL(LA UNION)-KIBUNGAN(BENGUET) ROAD20A00174 · ₱99,000,000.00 · mapped
- LOCAL INFRASTRUCTURE PROGRAM - CONSTRUCTION OF MISSING LINKS/ NEW ROADS, BANTAY (ILOCOS SUR) - SAN QUINTIN-LANGIDEN (ABRA) ROAD (PROPOSED ILOCOS SUR-ABRA ROAD)20A00168 · ₱99,000,000.00 · mapped
- CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONSTRUCTION OF FLOOD CONTROL ALONG ABRA RIVER, BANTAY SECTION, PHASE II, BANTAY, ILOCOS SUR18A00104 · ₱98,275,842.33 · mapped
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES, PORO POINT FREEPORT ZONE, SAN FERNANDO CITY, LA UNION20A00012 · ₱96,794,557.80 · mapped
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES, POBLACION-PUGUIL-TUBADAY ROAD, CONNECTING BALAOAN-SANTOL ROAD IN SUPPORT TO SOFT BROOM INDUSTRY AND OTHER HIGH VALUE AGRICULTURAL PRODUCTS, SANTOL, LA UNION20A00040 · ₱96,545,037.59 · mapped
- CONSTRUCTION OF MISSING LINKS/NEW ROADS - BANTAY (ILOCOS SUR) - SAN QUINTIN - LANGIDEN (ABRA) ROAD, ILOCOS SUR (PACKAGE 3)22A00278 · ₱96,500,000.00 · mapped
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES,INDUSTRIES AND ECONOMIC ZONES, PORO POINT FREEPORT ZONE, SAN FERNANDO CITY, LA UNION18A00095 · ₱96,500,000.00 · mapped
- CONSTRUCTION/ REPAIR/ REHABILITATION/ IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS (VILP) - CONSTRUCTION OF FLOOD CONTROL MITIGATION FACILITIES ALONG AMBURAYAN RIVER BASIN, (RIGHT SIDE) BRGY. PUDOC EAST, TAGUDIN, ILOCOS SUR20A00176 · ₱96,499,999.96 · mapped
- CONSTRUCTION OF MISSING LINKS / NEW ROADS, SANTOL (LA UNION) - KIBUNGAN (BENGUET) ROAD, LA UNION (PACKAGE 3)22A00248 · ₱96,499,933.41 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY SAGPAT, BANTAY, ILOCOS SUR24AC0105 · ₱96,397,273.19 · mapped
- CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - VIGAN-CABUGAO COASTAL/DIVERSION ROAD, ILOCOS SUR21A00067 · ₱96,150,000.00 · mapped
- CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, TAGUDIN BYPASS ROAD, ILOCOS SUR20A00075 · ₱95,301,065.10 · mapped
- CONSTRUCTION OF MISSING LINKS/ NEW ROADS - BANTAY (ILOCOS SUR) - SAN QUINTIN-LANGIDEN (ABRA) ROAD, ILOCOS SUR (PACKAGE 6)25A00106 · ₱94,539,372.76 · mapped
- CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - VIGAN-CABUGAO COASTAL/DIVERSION ROAD, PACKAGE 3, ILOCOS SUR25A00469 · ₱93,597,299.48 · mapped
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), CONSTRUCTION OF ROAD CONNECTING TO SANTA-RANCHO (S00089LZ) TO SANTA-CAOAYAN ROAD (PHASE 2), ILOCOS SUR25A00438 · ₱93,589,106.23 · mapped
- Construction of Flood Control along Bungro River, Sto. Domingo, Ilocos Sur22AC0015 · ₱91,675,000.00 · mapped
- CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - TAGUDIN BYPASS ROAD, ILOCOS SUR21A00100 · ₱91,325,000.00 · mapped
- CONSTRUCTION OF MISSING LINKS/ NEW ROADS, ROAD CONNECTING SANTA-RANCHO ROAD (S00089LZ) AND SANTA-CAOAYAN ROAD, ILOCOS SUR (PACKAGE 3)25A00424 · ₱89,847,563.27 · mapped
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES, POBLACION-PUGUIL-TUBADAY ROAD, CONNECTING BALAOAN-SANTOL ROAD IN SUPPORT TO SOFT BROOM INDUSTRY AND OTHER HIGH VALUE AGRICULTURAL PRODUCTS, PACKAGE 2, SANTOL, LA UN19A00091 · ₱86,850,000.00 · mapped
- REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE -PRIMARY ROADS; KENNON RD. K0245+884-K0246+358,K0246+537-K0246+73325PD0022 · ₱85,863,074.53 · mapped
- CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, TAGUDIN BYPASS ROAD, ILOCOS SUR24A00023 · ₱81,499,979.64 · mapped
- CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - VIGAN-CABUGAO COASTAL/DIVERSION ROAD, PACKAGE 1, ILOCOS SUR23A00133 · ₱76,674,285.07 · mapped
- CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - VIGAN-CABUGAO COASTAL/DIVERSION ROAD, PACKAGE 2, ILOCOS SUR23A00134 · ₱76,674,093.44 · mapped
- CONSTRUCTION OF PUG-OS - SALAPASAP - NAMRUANGAN - DACLAPAN ROAD LEADING TO PUBLIC BEACHES AND SURFING AREA, CABUGAO, ILOCOS SUR24AC0005 · ₱67,550,000.00 · mapped
- CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, VILLASIS BYPASS ROAD, PANGASINAN21A00210 · ₱67,550,000.00 · mapped
- IMPVT/WIDENING OF NATL ROAD PNVR (KO 182+148 - KO 183+735), (KO 188+557 - KO 190+390)18AI0053 · ₱66,296,088.65 · mapped
- IMPLEMENTATION AND MONITORING OF PAMANA PROJECTS: CONCRETING OF DACUDAC-TOKOD-PASNADAN FMR, TADIAN,18PI0045 · ₱64,529,730.00 · mapped
- CONSTRUCTION OF MISSING LINKS/ NEW ROADS - CABUGAO-NUEVA ERA-DANGLAS ROAD, CABUGAO SECTION, ILOCOS SUR23A00164 · ₱60,724,268.96 · mapped
- CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - TAGUDIN BYPASS ROAD, ILOCOS SUR22A00058 · ₱57,200,000.00 · mapped
- CONSTRUCTION OF SEAWALL, BARANGAY VILLAMAR, CAOAYAN, ILOCOS SUR24AC0072 · ₱53,057,631.29 · mapped
- CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, VIGAN-CABUGAO COASTAL/ DIVERSION ROAD, ILOCOS SUR, PACKAGE 222A00093 · ₱52,899,991.38 · mapped
- NETWORK DEVELOPMENT-CONSTRUCTION OF BY-PASS/DIVERSION ROADS, STO. TOMAS-MT. CABUYO ROAD TO WESTERNLINK CIRCUMFERENTIAL ROAD, BYPASS, INCL ROW AND SLOPE PROTECTION, BAGUIO CITY18PD0051 · ₱52,242,309.34 · mapped
- CONSTRUCTION OF FLOOD CONTROL ALONG ABRA RIVER, BANTAY SECTION (PHASE II), BANTAY, ILOCOS SUR19AC0071 · ₱51,411,340.00 · mapped
- CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, TAGUDIN BYPASS ROAD, ILOCOS SUR25A00225 · ₱50,858,199.41 · mapped
- CONSTRUCTION OF SEAWALL, PARATONG - SUBEC, STA. CATALINA, ILOCOS SUR20AC0060 · ₱49,000,000.00 · mapped
- CONSTRUCTION OF FLOOD CONTROL, BRGY. MARATUDO, MAGSINGAL, ILOCOS SUR20AC0004 · ₱49,000,000.00 · mapped
Equipment & capacity
PCAB license
- License no.
- 17055
- Category
- A · Medium B
- Minimum net worth for this category
- ₱30,000,000.00
- Allowable range of contract cost (ARCC)
- up to ₱300M
- License valid until
- Sep 30, 2029
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 17055); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
18 evaluations listed across 6 GPPB CPES releases; average final rating 92.7% over 5 rated projects; 15 site-visit ratings. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| Jul 2, 2025 | DPWH | ₱53,057,631.00 | Completed | 94.8% | 94.4% | 40th, p. 12 |
| May 5, 2025 | DPWH | ₱4,817,180.00 | On-going | 91.8% | — | 40th, p. 12 |
| May 2, 2025 | DPWH | ₱39,188,272.00 | Completed | 97.1% | 94.5% | 40th, p. 12 |
| Feb 15, 2025 | DPWH | ₱53,054,631.00 | On-going | 94.2% | — | 39th (rev), p. 8 |
| May 21, 2024 | DPWH | ₱36,407,018.00 | On-going | 96.3% | — | 38th, p. 7 |
| May 21, 2024 | DPWH (JV) | ₱48,949,452.00 | On-going | 94.0% | — | 38th, p. 7 |
| Mar 21, 2024 | DPWH | ₱19,600,000.00 | Completed | 93.6% | 93.4% | 37th, p. 4 |
| Mar 17, 2023 | DPWH | ₱45,080,000.00 | Completed | 90.4% | 87.9% | 35th, p. 5 |
| Oct 22, 2022 | DPWH | ₱18,849,591.00 | Completed | 93.2% | 93.2% | 35th, p. 5 |
| Oct 21, 2022 | DPWH | ₱45,080,000.00 | On-going | 84.9% | — | 35th, p. 5 |
| Jul 11, 2022 | DPWH | ₱43,276,800.00 | On-going | 87.6% | — | 34th, p. 3 |
| Jun 30, 2022 | DPWH | ₱18,849,591.00 | On-going | 93.2% | — | 34th, p. 4 |
Showing the 12 most recent of 18.
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →