Construction of Deet-Pudok Flood Control Structure, Tayum, Abra
Construction of Deet-Pudok Flood Control Structure, Tayum, Abra is a DPWH-tracked public work in TAYUM (ABRA), ABRA, Cordillera Administrative Region. Reported contract value: ₱144,747,542.00. Status: Reported complete (DPWH). Contractor on record: MG SAMIDAN CONST. Figures trace to sumbong.
Total Contract Cost
