Construction of Flood Control Structure along Abra Major River Basin, Barangay Ampalioc, Luba, Abra
Construction of Flood Control Structure along Abra Major River Basin, Barangay Ampalioc, Luba, Abra is a DPWH-tracked public work in LUBA (ABRA), ABRA, Cordillera Administrative Region. Reported contract value: ₱144,750,000.00. Status: Reported complete (DPWH). Contractor on record: MG SAMIDAN CONST. Figures trace to sumbong.
Total Contract Cost
