REHABILITATION OF DIKE SYSTEM ALONG MADONGAN RIVER (BREACHED AND ERODED DIKE, LEFT AND RIGHT BANK), LAOAG RIVER BASIN FLOOD CONTROL AND SABO PROJECT
REHABILITATION OF DIKE SYSTEM ALONG MADONGAN RIVER (BREACHED AND ERODED DIKE, LEFT AND RIGHT BANK), LAOAG RIVER BASIN FLOOD CONTROL AND SABO PROJECT is a DPWH-tracked public work in Flood Control Management Cluster, Central Office. Reported contract value: ₱862,857,754.67. Status: Reported complete (DPWH). Contractor on record: TOKWING CONST CORP FOR TOKWING CONSTRUC. Figures trace to dpwh.
Total Contract Cost