Construction of Mapacopaco Flood Control, Sta. 38+850 - Sta. 39+900 (R/S), Posnaan, Aguinaldo, Ifugao
Construction of Mapacopaco Flood Control, Sta. 38+850 - Sta. 39+900 (R/S), Posnaan, Aguinaldo, Ifugao is a DPWH-tracked public work in AGUINALDO (IFUGAO), IFUGAO, Cordillera Administrative Region. Reported contract value: ₱98,000,000.00. Status: Reported complete (DPWH). Contractor on record: MA CONST / R S SEPIAN CONST & TRUCKING. Figures trace to sumbong.
Total Contract Cost
