Construction of Flood Control Structure along Abra River, Upstream and Down Stream of Quirino Bridge, Quirino, Ilocos Sur (Phase 1)
Construction of Flood Control Structure along Abra River, Upstream and Down Stream of Quirino Bridge, Quirino, Ilocos Sur (Phase 1) is a DPWH-tracked public work in QUIRINO (ANGKAKI) (ILOCOS SUR), ILOCOS SUR, Region I. Reported contract value: ₱157,294,568.60. Status: Reported complete (DPWH). Contractor on record: A I P CONST. Figures trace to sumbong.
Total Contract Cost


