OMENGAN CONST is listed as a company organization in Philippine public procurement records on this site, with 62 linked DPWH project(s) totaling about ₱4,239,069,015.75. Recorded delivery grade C (pattern summary from public DPWH/PhilGEPS links — not a finding of wrongdoing).
OMENGAN CONST
CRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 62
- Total value
- ₱4,239,069,015.75
- Published flags
- 0
- Region
- Lower Kalinga DEO · Cordillera Administrative Region
Public Record Grade
A transparent, data-derived summary of reported public records for OMENGAN CONST — not an accusation or finding of wrongdoing.
Score: 74.00 / 100 · Projects in sample: 62 · As of Oct 22, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 52.1/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 52.1
- lateCompletedProjects
- 31
- onTimeCompletedProjects
- 21
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 61
- pastTargetOngoingProjects
- 9
- undatedCompletedProjectsExcluded
- 1
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 62
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 62
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 62
- componentScore
- —
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 62
- componentScore
- —
- linkedObservations
- 0
Computed automatically from public DPWH, PhilGEPS and COA records, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 41 of 52 geotagged projects (largest by contract value) — Open full map
- CONST/IMPVT OF ACCESS RDS LEADING TO AIRPORTS, SEAPORTS, AND DTD, CUDOG-MUNGAYANG-KIANGAN ROAD LEADING TO AMBUAYA LAKE, YAMASHITA SHRINE, AND KIYANGAN SETTLEMENT, KIANGAN AND LAGAWE, IFUGAO (INCLUDING CONSTRUCTION OF BRIDGES)16P00052 · ₱188,657,500.00
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONST. OF MISSING LINKS/NEW ROADS BAGUIO - LA TRINIDAD - ITOGON - SABLAN - TUBA AND TUBLAY, ASIN - NANGALISANJCT. - BAYABAS - MONGLO JCT. (SECTION 1)20P00009 · ₱173,494,750.39 · mapped
- CONSTRUCTION AND MAINTAINANCE OF BRIDGE ALONG NATIONAL ROADS CONSTRUCTION OF NEW PERMANENT BRIDGE TABBAYAGAN BRIDGE ALONG APAYAO-ILOCOS NORTE ROAD17P00025 · ₱154,392,844.67
- ORGANIZATIONAL OUTCOME 1: ASSET PRESERVATION - CONSTRUCTION / UPGRADING / REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - PRIMARY ROADS - MANUEL S. AGYAO BOULEVARD-K0499 + 908 -K0500 + 467, K0508 + 130 - K0509 + 35124PL0093 · ₱152,822,222.02 · mapped
- CONSTRUCTION OF REVETMENT AND EMBANKMENT OF DIKE AND CHANNELING ALONG CHICO RIVER, TABUK CITY, KALINGA23P00009 · ₱144,750,000.00 · mapped
- ROAD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL ROAD STRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED ROAD STANDARDS (HDM-4 PROJECT ANALYSIS) APAYAO - ILOCOS NORTE ROAD, K0616+000 - K0619+75017P00005 · ₱144,749,997.80
- ROAD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL ROAD STRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED ROAD STANDARDS (HDM-4 PROJECT ANALYSIS) TABUK - BANAWE VIA TANUDAN - BARLIG ROAD, K0536+966 - K0541+12017P00010 · ₱144,739,032.05 · mapped
- ROAD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL ROAD STRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED ROAD STANDARDS (HDM-4 PROJECT ANALYSIS) TABUK - BANAWE VIA TANUDAN - BARLIG ROAD, K0532+680 - K0536+78017P00009 · ₱144,690,803.83 · mapped
- ROAD UPGRADING (UNPAVED TO PAVED) CLAVERIA - CALANASAN - KABUGAO ROAD KO642+03415PO0055 · ₱140,330,335.44 · mapped
- RD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL RD STRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED RD STDS (HDM-4 PROJ ANALYSIS) RIZAL NATIONAL ROAD (ROMUALDEZ-SANTOR-CALAOCAN-SN PASCUA SECTION) K0425+240-K0425+388,K0425+388-K0425+426,K0425+426-K042515P00075 · ₱124,253,513.00 · mapped
- RD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL RD STRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED RD STDS (HDM-4 PROJECT ANALYSIS) RIZAL NATIONAL RD (BABALAG-KINAMA-SN FRANCISCO SECT), K0534+475 - K0535+297, K0535+313 - K0535+596, K0535+996 - K0536+16P00017 · ₱123,619,222.00 · mapped
- RD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL RD STRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED RD STDS (HDM-4 PROJECT ANALYSIS) RIZAL NATIONAL ROAD (BABALAG-KINAMA-SN FRANCISCO SECTION), K0529+520 - K0534+475, KALINGA16P00011 · ₱119,212,781.54 · mapped
- CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS - CONSTRUCTION OF NEW PERMANENT BRIDGES - MADDUANG BRIDGE ALONG APAYAO-ILOCOS NORTE ROAD, K0615+(-524) - K0615+(-402.5017P00036 · ₱115,799,978.25
- RD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL RD STRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED RD STDS (HDM-4 PROJ ANALYSIS) BULO NATIONAL ROAD (AGBANNAWAG-BULO-CALLAGDAO SECTION), K0503+400 - K0507+29116P00022 · ₱113,500,009.60 · mapped
- ORGANIZATIONAL OUTCOME 2 - PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE25PB0012 · ₱108,755,500.02 · mapped
- ROAD UPGRADING (UNPAVED TO PAVED) TABUK - BANAWE VIA TANUDAN - BARLIG ROAD K0522+83115P00056 · ₱99,111,513.00 · mapped
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF MEGA DIKE PROJECT ALONG CHICO RIVER, STA. 82+047 - S25PL0015 · ₱96,477,777.09 · mapped
- CONSTRUCTION OF A. CANAO BRIDGE TOWARDS CAMALOG (CHANNELING, EMBANKMENT DIKE, REVETMENT) ALONG CHICO RIVER, STA. 93+500 - STA. 94+500, TABUK CITY, KALINGA20PL0019 · ₱96,455,788.33 · mapped
- NETWORK DEVELOPMENT - ROAD WIDENING - KALINGA - CAGAYAN ROAD (CALANAN - ENRILE SECTION)18PL0078 · ₱95,443,821.73 · mapped
- CONSTRUCTION OF REVETMENT, EMBANKMENT OF DIKE AND CHANNELING ALONG CHICO RIVER, TABUK CITY, KALINGA18PL0101 · ₱95,441,513.00 · mapped
- CONSTRUCTION OF REVETMENT AND EMBANKMENT DIKE AND CHANNELING/WIDENING ALONG CHICO RIVER, KALINGA17PL0090 · ₱94,944,513.00
- NETWORK DEVELOPMENT- PAVING OF UNPAVED ROADS- TERTIARY ROADS APAYAO-ILOCOS NORTE RD K0628+801 TO K0630+80119PB0009 · ₱93,595,513.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM- CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES, MADUANG-DAGARA-MARAGAT-ABRA ROAD IN SUPPORT TO BLACKSMITHING, HANDICRAFT, FURNITURE, HIGH VALUE CROPS AND COFFEE21PB0001 · ₱86,848,777.68 · mapped
- PACKAGE 3: A) TANIOC (LADEK ISLA DAO-ANG) FLOOD CONTROL ALONG TANIOC CREEK, B) TUGA FLOOD CONTROL ALONG TUGA CREEK, C) NEW TANGLAG FLOOD CONTROL ALONG CHICO RIVER17PL0209 · ₱86,094,222.00 · mapped
- ROAD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL ROAD STRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED ROAD STANDARDS (HDM-4 PROJECT ANALYSIS), JCT TALUBIN-BARLIG-NATONIN-PARACELIS-CALACCAD ROAD, K0455+155 - K0457+06917P00031 · ₱77,938,513.00
- GOBGOB FLOOD CONTROL ALONG CHICO RIVER, TABUK CITY, KALINGA17PL0210 · ₱75,452,222.00 · mapped
- ROAD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL ROAD STRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED ROAD STANDARDS (HDM-4 PROJECT ANALYSIS) TABUK-BANAWE VIA TANUDAN-BARLIG ROAD17PL0025 · ₱70,183,500.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM - ROLL-IT), MADUANG-DAGARA-MARAGAT-ABRA BOUNDARY22PB0008 · ₱67,550,000.00 · mapped
- RD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL RD STRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED RD STDS (HDM-4 PROJ ANALYSIS) JUNCTION TALUBIN - BARLIG - NATONIN - PARACELIS - CALACCAD RD, K0453+000 - K0454+73116P00019 · ₱64,138,766.76 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES - ALIOG BR. (B00977LZ) ALONG MANUEL S. AGYAO BOULEVARD25PL0076 · ₱57,111,888.88 · mapped
- CATABBOGAN FLOOD CONTROL ALONG CHICO RIVER17PL0219 · ₱48,322,709.00 · mapped
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATION-MACUTAY-GREENHILLS-SAN PEDRO AND SAN VICENTE ACCESS ROAD LEADING TO ELEPHANT HILL, ARCHEOLOGICAL TOURISM SITE, BRGY. SAN PEDRO, RIZAL, (LIWAN), KALINGA18PL0069 · ₱47,746,222.00 · mapped
- NETWORK DEVELOPMENT -PAVING OF UNPAVED ROADS, TERTIARY ROADS APAYAO-ILOCOS NORTE RD, K0638+974 - K0640+06020PB0020 · ₱47,529,259.08 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM- CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, CAGLAYAN-PADDIG-CUPIS ROAD LEADING TO NABUANGAN RIVER, BANSELAN CAVE, CUPIS LOOMWEAVING, PACKAGE 2, BRGY. CAGLAYAN (NEW POB.)21PB0014 · ₱47,525,500.00 · mapped
- NETWORK DEVELOPMENT-PAVING OF UNPAVED ROADS - TERTIARY ROADS APAYAO-ILOCOS NORTE RD K0630+801 - K0631+85120PB0007 · ₱47,513,362.69 · mapped
- CONSTRUCTION OF MISSING GAPS CONNECTING NATIONAL ROADS INCLUDING ROW APAYAO-ILOCOS NORTE ROAD OPENING (KABUGAO-APAYAO ROAD OPENING SOLSONA,ILOCOS NORTE ROAD), APAYAO 1ST DEO, LD K0614+620-K0615+060, K0620+510-K0621+410, K0621+680-K0622+10016PB0016 · ₱46,334,554.99
- NETWORK DEVELOPMENT PROGRAM - OFF-CARRIAGEWAY IMPROVEMENT - PRIMARY ROADS - KALINGA - CAGAYAN ROAD (CALANAN-ENRILE SECTION) - K0497+510 - K0498+344, K0499+915 - K0503+000, K0505+000 - K0506+494, K0510+780 - K0511+939, TABUK CITY, KALINGA21PL0063 · ₱40,580,222.02 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP), CAGLAYAN-PADDIG-CUPIS ROAD LEADING TO NABUAGAN RIVER, BANSELAN CAVE, CUPIS22PB0006 · ₱39,198,500.00 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - BRIDGE PROGRAM-WIDENING OF PERMANENT BRIDGES-NAMBARAN BR. (B00978LZ) ALONG KALINGA-CAGAYAN RD (CALANAN-ENRILE SECTION)23PL0067 · ₱38,402,513.88 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF SEET-MABACA-TALOCTOC-M24PL0064 · ₱36,222,862.78 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM-ROLL-IT), MADUANG-DAGARA-MARAGAT-ABRA BOUNDARY IN25PB0016 · ₱33,614,888.08 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS - MACUTAY-GREENHILLS-SAN PEDRO AND SAN VICENTE ACCESS ROAD LEADING TO ELEPHANT HILL, ARCHEOLOGICAL TOURISM SITE, BRGY. SAN PEDRO, R20PL0087 · ₱29,400,000.00 · mapped
- CSSP: CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES, AND ECONOMIC ZONES- JCT. NANSUSO-BACARRI-BANTAHS-MPSPC-TAWANG ROAD IN SUPPORT OF BANANA, COFFEE, CACAO,CORN AND FOOD PROCESSING INDUSTRIES, PARACELIS, MT. PROV.18PM0005 · ₱28,798,709.00 · mapped
- CONSTRUCTION OF TULYAO FLOOD CONTROL - TULYAO, TABUK CITY, KALINGA17PL0082 · ₱28,216,189.83
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - (ROLL-IT) - JCT. NANSUSO-BACARRI-BANTAHS-MPSPC-TAWANG ROAD IN SUPPORT OF BANANA, COFFEE, CACAO, CORN AND FOOD PROCESSING INDUSTRIES, PARACELIS, MOUNTAIN PROVINCE25PM0030 · ₱27,728,120.00 · mapped
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM - ROLL-IT) - JCT. NANSUSO-BACARRI-BANTAHS-MPSPC-TAWANG ROAD IN SUPPORT OF BANANA, COFFEE, CA23PM0025 · ₱24,500,000.00 · mapped
- REPLACEMENT OF BRIDGES FROM TEMPORARY TO PERMANENT OF BULO BRIDGE 1 (B01338LZ) ALONG BULO NATIONAL ROAD (AGBANNAWAG-BULO-CALLAGDAO SECTION)16PL0002 · ₱24,308,967.82
- CONSTRUCTION OF CATABBOGAN FLOOD CONTROL ALONG CHICO RIVER, CATABBOGAN, PINUKPUK, KALINGA19PL0012 · ₱24,247,204.72 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS MANUEL S. AGYAO BOULEVARD - K0515 + 000 - K0516 + 00025PL0012 · ₱21,680,888.02 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES, JUNCTION NANSUSO-BACARRI-BANTAHS-MPSPC-TAWANG ROAD IN SUPPORT OF ABACA, BANANA, COFFEE, CACAO,CORN AND FOOD PROCESSING INDU20PM0005 · ₱19,403,888.02 · mapped
Across government
No DepEd or DOH contract awards matched to this name in PhilGEPS records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
