Roads20PB0007

NETWORK DEVELOPMENT-PAVING OF UNPAVED ROADS - TERTIARY ROADS APAYAO-ILOCOS NORTE RD K0630+801 - K0631+851

NETWORK DEVELOPMENT-PAVING OF UNPAVED ROADS - TERTIARY ROADS APAYAO-ILOCOS NORTE RD K0630+801 - K0631+851 is a DPWH-tracked public work in Apayao 1st DEO, Cordillera Administrative Region. Reported contract value: ₱47,513,362.69. Status: Reported complete (DPWH). Contractor on record: OMENGAN CONST. Figures trace to dpwh.

Apayao 1st DEO, Cordillera Administrative Region
Region: Cordillera Administrative Region

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2020 · ₱20,000 (shared by many projects, not this project's own line)

    Possible match · score 0.80

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    ₱35,719,343 · OMENGAN CONST & DEVELOPMENT CORP

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2020-03-07 → 2025-05-02

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Road, cost per km (new paving / upgrading)

₱45,250,822 per km= 1.1x the Cordillera Administrative Region median (n=103)

Contract cost ₱47,513,363 ÷ 1.05 km read from the DPWH title (“K0630+801 - K0631+851”; K-post / station range length). National percentile: 83. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: NETWORK DEVELOPMENT-PAVING OF UNPAVED ROADS - TERTIARY ROADS APAYAO-ILOCOS NORTE RD K0630+801 - K0631+851

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 80%

UACS
18001
Amount
₱20,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Barren River (downstream) Flood Control, Brgy. Paddaoan, Conner, Apayao
GAA fiscal year
FY2020
DBM GAA source document

2. Allotment

Agency-level releases for FY2020, not tied to this contract

Apayao 1st DEO · SARO 1,970 (₱160,521,624,356.00) · NCA 998 (₱407,918,568,220.27)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

Construction Projects

₱35,719,342.81 · OMENGAN CONST & DEVELOPMENT CORP

Award / contract ref: 20PB0007

Contractor

C

62 projects · ₱4.2B total · 0 flags

Other projects by this contractor

No sat.

CONST/IMPVT OF ACCESS RDS LEADING TO AIRPORTS, SEAPORTS, AND DTD, CUDOG-MUNGAYANG-KIANGAN ROAD LEADING TO AMBUAYA LAKE, YAMASHITA SHRINE, AND KIYANGAN SETTLEMENT, KIANGAN AND LAGAWE, IFUGAO (INCLUDING CONSTRUCTION OF BRIDGES)

Cordillera Administrative Region, Cordillera Administrative Region

2016₱188.7M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONST. OF MISSING LINKS/NEW ROADS BAGUIO - LA TRINIDAD - ITOGON - SABLAN - TUBA AND TUBLAY, ASIN - NANGALISANJCT. - BAYABAS - MONGLO JCT. (SECTION 1)

Cordillera Administrative Region, Cordillera Administrative Region

2020₱173.5M
Reported complete (DPWH)
No sat.

CONSTRUCTION AND MAINTAINANCE OF BRIDGE ALONG NATIONAL ROADS CONSTRUCTION OF NEW PERMANENT BRIDGE TABBAYAGAN BRIDGE ALONG APAYAO-ILOCOS NORTE ROAD

Cordillera Administrative Region, Cordillera Administrative Region

2017₱154.4M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1: ASSET PRESERVATION - CONSTRUCTION / UPGRADING / REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - PRIMARY ROADS - MANUEL S. AGYAO BOULEVARD-K0499 + 908 -K0500 + 467, K0508 + 130 - K0509 + 351

Lower Kalinga DEO, Cordillera Administrative Region

2024₱152.8M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION OF REVETMENT AND EMBANKMENT OF DIKE AND CHANNELING ALONG CHICO RIVER, TABUK CITY, KALINGA

Cordillera Administrative Region, Cordillera Administrative Region

2023₱144.8M
Past target date (DPWH On-Going)
No sat.

ROAD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL ROAD STRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED ROAD STANDARDS (HDM-4 PROJECT ANALYSIS) APAYAO - ILOCOS NORTE ROAD, K0616+000 - K0619+750

Cordillera Administrative Region, Cordillera Administrative Region

2017₱144.7M
Reported complete (DPWH)
View all 62 projects →

4. Implementation

Contract Amount

₱47,513,362.69

Progress

Reported complete (DPWH)

Start Date

October 21, 2020

Target End

May 30, 2021

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Cordillera Administrative Region (CAR)ApayaoKabugaoDibagat
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
LandslideDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.