Flood Control and Drainage23B00056

OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION WORKS FOR CAGAYAN RIVER BASIN, CAGAYAN RIVER AT ALICAOCAO, CA

OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION WORKS FOR CAGAYAN RIVER BASIN, CAGAYAN RIVER AT ALICAOCAO, CA is a DPWH-tracked public work in Region II, Region II. Reported contract value: ₱182,619,874.39. Status: Past target date (DPWH On-Going). Contractor on record: JOMARCANN GEN CONST. Figures trace to dpwh.

Region II, Region II
Region: Region II

Satellite images processing — before/after tiles will appear here after the next batch run.

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2023 GAA. DBM GAA FY2023

2. Allotment

No matching SARO/NCA release found for this project. Source: DBM SARO/NCA listings.

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

41 projects · ₱2.3B total · 0 flags

Other projects by this contractor

No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS (SECONDARY ROADS) BAGUIO - BONTOC ROAD K0267+810-K0268+000, K0270+000-K0270+178, K0279+00

Cordillera Administrative Region, Cordillera Administrative Region

2018₱210.4M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE (SECONDARY ROADS) BAGUIO BONTOC ROAD

Cordillera Administrative Region, Cordillera Administrative Region

2019₱129.3M
Reported complete (DPWH)
No sat.

RD UPGRNG CLAVERIA - CALANASAN - KABUGAO ROAD, K0661+929

Cordillera Administrative Region, Cordillera Administrative Region

2016₱123.3M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS MARCOS HI-WAYKO272+800 - KO272+909TUBA, BENGUET

Cordillera Administrative Region, Cordillera Administrative Region

2021₱120.6M
Reported complete (DPWH)
No sat.

REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/ HIGHWAY DEVELOPMENT MANAGEMENT (HDM-4) BAGUIO - BONTOC ROAD, K0265+750-K0266+000, K0266+000-K0266+475, K0266+680-K0266+840, K

Cordillera Administrative Region, Cordillera Administrative Region

2017₱112.2M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS CONG. ANDRES ACOP COSALAN ROAD K0318 + 220 - K0318

Cordillera Administrative Region, Cordillera Administrative Region

2021₱106.2M
Reported complete (DPWH)
View all 41 projects →

4. Implementation

Contract Amount

₱182,619,874.39

Progress

Past target date (DPWH On-Going)

Start Date

June 2, 2023

Target End

September 4, 2024

5. Audit