MSB VITUG CONST is listed as a company organization in Philippine public procurement records on this site, with 32 linked DPWH project(s) totaling about ₱5,966,042,426.77. Recorded delivery grade C (from public DPWH project records — not a finding of wrongdoing).
MSB VITUG CONST
CGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 32
- Total value
- ₱5,966,042,426.77
- Published flags
- 0
- Region
- Flood Control Management Cluster · National Capital Region
Licensed officers (PCAB)
- Mark Stephen Basi Vitug · Authorized Managing Officer (PCAB license 33019) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for MSB VITUG CONST — not an accusation or finding of wrongdoing.
Score: 72.50 / 100 · Projects in sample: 32 · As of Oct 28, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 62.5/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 62.5
- lateCompletedProjects
- 0
- onTimeCompletedProjects
- 20
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 26
- pastTargetOngoingProjects
- 6
- undatedCompletedProjectsExcluded
- 4
- Termination rate
Component score: 71.9/100 · Weight: 24%
- totalProjects
- 32
- componentScore
- 71.9
- terminatedProjects
- 3
- terminationRatePct
- 9.4
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0.2
- componentScore
- 100
- projectsWithAbcAndCost
- 31
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 32
- componentScore
- No data for this figure; the component is excluded, not scored
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 32
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
26 geotagged projects — Open full map · Download projects (CSV)
- CONSTRUCTION/REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG UGUIS RIVER, BRGY. UGUIS AND ALONG TIBANGRAN RIVER, BRGY. BARANGOBONG, MUNICIPALITY OF NUEVA ERA, ILOCOS NORTE19Z00021 · ₱715,058,396.95 · mapped
- PASIG MARIKINA RIVER CHANNEL IMPROVEMENT PROJECT, PHASE V, CONTRACT PACKAGE 2 AND 3 - RIVER IMPROVEMENT WORKS ALONG UPPER MARIKINA RIVER UPSTREAM OF MARIKINA BRIDGE) STA. 14+100 TO STA. 15+450, LEFT BANK, MARIKINA CITY17Z00022 · ₱714,732,784.62 · mapped
- PROPOSED MANILA BAY REHABILITATION PROGRAM (DREDGING AND DISPOSAL OF SOLID WASTE OR SLUDGE WASTE USING OCEAN-BASED METHODOLOGY INCLUDING CONSTRUCTION/EXTENSION OF THREE (3) DRAINAGE OUTFALLS)19Z00038 · ₱502,312,433.13 · mapped
- CONSTRUCTION/IMPROVEMENT OF CATBALOGAN CITY, DRAINAGE SYSTEM, CATBALOGAN CITY, INCLUDING ANTIAO RIVER CONTROL, SAMAR PROVINCE18Z00032 · ₱445,272,995.61 · mapped
- CONSTRUCTION/IMPROVEMENT OF CATBALOGAN CITY DRAINAGE SYSTEM, CATBALOGAN CITY INCLUDING ANTIAO RIVER CONTROL, SAMAR16Z00019 · ₱438,806,571.28 · mapped
- AGNO RIVER BASIN FLOOD CONTROL PROJECT (PHASE1)-CONSTRUCTION OF PROTECTION WORKS USING GABIONS AND MATTRESSES. BRGY. DORONGAN SAWAT, STA. 2+840 TO STA.3+140 AND STA. 3+140 T0 STA. 3+640, DORONGAN KETAKET, STA 1+592 TO STA. 2+840 MANGATAREM; (PHASE II-A)-R17Z00003 · ₱363,217,253.32 · mapped
- CONSTRUCTION OF GENERAL TRIAS RETARDING BASIN II (YLANG-YLANG RIVER) UNDER THE FLOOD RISK MANAGEMENT FOR YLANG-YLANG RIVER AND RIO CHICO GRANDE RIVER IN THE PROVINCE OF CAVITE INCLUDING ROW17Z00013 · ₱350,224,794.02 · mapped
- CONSTRUCTION OF NATIONAL LABOR RELATIONS COMMISSION (NLRC) OFFICE BUILDING, AGHAM ROAD CORNER NORTH AVENUE, QUEZON CITY22O00112 · ₱285,152,630.07 · mapped
- REVETMENT AND DREDGING WORKS ALONG STA. 14+038 TO STA. 16+050 (TULLAHAN RIVER-LEFT BANK) TULLAHAN BRIDGE, BRGY. TALIPAPA-GOOD WILL HOMES I SUBDIVISION, BRGY. SAN BARTOLOME, QUEZON CITY17OB0377 · ₱279,960,209.08 · mapped
- CONSTRUCTION/IMPROVEMENT OF FLOOD CONTROL STRUCTURES IN METRO CEBU, BRGY. PASIL AND ERMITA, BRGY. TEJERO AND BRGY. TIPOLO, CEBU CITY18Z00034 · ₱266,562,984.71 · mapped
- CONSTRUCTION OF TWO (2) PUMPING STATION ALONG NAVOTAS COASTAL DIKE (PHASE 6), NAVOTAS CITY23Z00005 · ₱250,851,621.09 · mapped
- CONSTRUCTION OF NATIONAL LABOR RELATIONS COMMISSION (NLRC) OFFICE BUILDING, AGHAM ROAD CORNER NORTH AVENUE, QUEZON CITY (PHASE II)24O00035 · ₱237,099,190.42
- CONSTRUCTION OF NATIONAL LABOR RELATIONS COMMISSION (NLRC) OFFICE BUILDING, AGHAM ROAD CORNER NORTH AVENUE, QUEZON CITY23O00026 · ₱144,750,000.00 · mapped
- METRO CEBU FLOOD CONTROL PROJECT AND DRAINAGE IMPROVEMENT PROJECT - SUBANG DAKU, LAHUG, GUADALUPE AND BULACAO RIVER BASINS, CEBU CITY17Z00023 · ₱142,148,174.81 · mapped
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD MITIGATION FACILITIES AT LINGAYEN - BINMALEY, PANGASINAN23A00324 · ₱130,140,637.16 · mapped
- CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, COMPLETION OF FLOOD MITIGATION STRUCTURE ALONG LAOAG-BONGO RIVER, LAOAG CITY SECTION AND SAN NICOLAS SECTION, ILOCOS NORTE17A00045 · ₱96,499,393.63
- REHABILITATION OF PASIG-MARIKINA RIVER CHANNEL, STA. 1+500 - STA. 3+000, PASIG CITY22OB0070 · ₱88,572,118.24 · mapped
- REHABILITATION OF TULLAHAN RIVER, BRGY. NORTH FAIRVIEW (PHASE III), Q.C.19OF0063 · ₱83,789,573.00 · mapped
- Rehabilitation of San Juan River, Phase V, Quezon City22OG0136 · ₱77,323,411.00 · mapped
- PASIG-MARIKINA RIVER CHANNEL IMPROVEMENT PROJECT PHASE IV (CONTRACT PACKAGE NO. 2) MIDDLE MARIKINA RIVER IMPROVEMENT WORKS, LEFT BANK, STA. 7+235 TO STA. 7+33517OB0476 · ₱67,145,656.74 · mapped
- UPGRADING OF CATMON PUMPING STATION, MALABON CITY (PROVISION OF BACK-UP GENERATOR AND IMPROVEMENT OF RETARDING BASIN)21O00103 · ₱50,130,876.37 · mapped
- Maintenance and Rehabilitation of Flood Control Structure along Manggahan Floodway, Pasig City22OB0074 · ₱46,499,760.00 · mapped
- CONSTRUCTION OF PUMPING STATION AT BARANGAY SALAPAN, SAN JUAN CITY17OB0077 · ₱36,630,910.58 · mapped
- CONSTRUCTION OF REVETMENT ALONG ANGAT RIVER CANIOGAN SECTION CALUMPIT, BULACAN17CC0078 · ₱32,531,622.48
- CONSTRUCTION OF SOPE PROTECTION WITHIN AGNO RIVER BASIN, SD 1-5, BRGY. MINIEN WEST, STA. BARBARA, PANGASINAN18AJ0076 · ₱29,983,115.76 · mapped
- Rehabilitation of San Juan River (Phase VI), Quezon City22OG0107 · ₱28,931,540.41 · mapped
- MFO2-FLOOD MANAGEMENT SERVICES-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAIANGE SYSTEMS-REHABILITATION/IMPROVEMENT/CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG PILILLA RIVER, PILILLA RIZAL 2ND LD17DO0010 · ₱18,186,320.48
- REHABILITATION OF TULLAHAN RIVER, BRGY. FAIRVIEW, Q.C.19OF0060 · ₱13,964,858.00 · mapped
- REHABILITATION OF EAST MANGGAHAN RIVER BASIN, PASIG CITY17OB0340 · ₱13,101,435.10 · mapped
- CONSTRUCTION OF FLOOD MITIGATION FACILITY-UPGRADING OF LUNETA PUMPING STATION (EXPANSION INCLUDING D19OH0024 · ₱9,539,179.36 · mapped
- CONSTRUCTION OF BOX CULVERT/IMPROVEMENT OF OPEN CANAL ALONG AGUINALDO HIGHWAY SERVICE ROAD, BARANGAY LA HUERTA, PARAÑAQUE CITY, METRO MANILA17OC0004 · ₱6,921,979.35
- REHABILITATION OF BUHANGIN CREEK AND ITS VICINITY, BRGY. PLAINVIEW AND BRGY. OLD ZANIGA, MANDALUYONG CITY16OB0325 · ₱0.00
Equipment & capacity
PCAB license
- License no.
- 33019
- Category
- AA · Large A
- Minimum net worth for this category
- ₱90,000,000.00
- Allowable range of contract cost (ARCC)
- up to ₱450M
- License valid until
- Dec 18, 2027
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 33019); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
4 evaluations listed across 4 GPPB CPES releases; average final rating 90.6% over 2 rated projects; 4 site-visit ratings. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| Dec 2, 2024 | DPWH | ₱960,000,000.00 | On-going | 90.9% | — | 39th (rev), p. 145 |
| Jun 20, 2023 | DPWH | ₱88,937,109.00 | Final | 93.3% | 90.2% | 36th, p. 142 |
| Oct 14, 2022 | DPWH | ₱88,572,118.00 | On-going | 88.1% | — | 35th, p. 116 |
| Mar 4, 2020 | DPWH | ₱9,539,179.00 | Completed | 93.0% | 91.0% | 37th, p. 73 |
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →