Flood Control and Drainage23A00324

CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD MITIGATION FACILITIES AT LINGAYEN - BINMALEY, PANGASINAN

CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD MITIGATION FACILITIES AT LINGAYEN - BINMALEY, PANGASINAN is a DPWH-tracked public work in Region I, Region I. Reported contract value: ₱130,140,637.16. Status: Past target date (DPWH On-Going). Contractor on record: MSB VITUG CONST. Figures trace to dpwh.

Region I, Region I
Region: Region I

Satellite images processing — before/after tiles will appear here after the next batch run.

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2023 GAA. DBM GAA FY2023

2. Allotment

No matching SARO/NCA release found for this project. Source: DBM SARO/NCA listings.

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

32 projects · ₱6.0B total · 0 flags

Other projects by this contractor

No sat.

CONSTRUCTION/REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG UGUIS RIVER, BRGY. UGUIS AND ALONG TIBANGRAN RIVER, BRGY. BARANGOBONG, MUNICIPALITY OF NUEVA ERA, ILOCOS NORTE

Flood Control Management Cluster, Central Office

2019₱715.1M
Past target date (DPWH On-Going)
No sat.

PASIG MARIKINA RIVER CHANNEL IMPROVEMENT PROJECT, PHASE V, CONTRACT PACKAGE 2 AND 3 - RIVER IMPROVEMENT WORKS ALONG UPPER MARIKINA RIVER UPSTREAM OF MARIKINA BRIDGE) STA. 14+100 TO STA. 15+450, LEFT BANK, MARIKINA CITY

Flood Control Management Cluster, Central Office

2017₱714.7M
Past target date (DPWH On-Going)
No sat.

PROPOSED MANILA BAY REHABILITATION PROGRAM (DREDGING AND DISPOSAL OF SOLID WASTE OR SLUDGE WASTE USING OCEAN-BASED METHODOLOGY INCLUDING CONSTRUCTION/EXTENSION OF THREE (3) DRAINAGE OUTFALLS)

National Capital Region, National Capital Region

2019₱502.3M
Past target date (DPWH On-Going)

CONSTRUCTION/IMPROVEMENT OF CATBALOGAN CITY, DRAINAGE SYSTEM, CATBALOGAN CITY, INCLUDING ANTIAO RIVER CONTROL, SAMAR PROVINCE

Flood Control Management Cluster, Central Office

2018₱445.3M
Reported complete (DPWH)

CONSTRUCTION/IMPROVEMENT OF CATBALOGAN CITY DRAINAGE SYSTEM, CATBALOGAN CITY INCLUDING ANTIAO RIVER CONTROL, SAMAR

Flood Control Management Cluster, Central Office

2016₱438.8M
Reported complete (DPWH)
No sat.

AGNO RIVER BASIN FLOOD CONTROL PROJECT (PHASE1)-CONSTRUCTION OF PROTECTION WORKS USING GABIONS AND MATTRESSES. BRGY. DORONGAN SAWAT, STA. 2+840 TO STA.3+140 AND STA. 3+140 T0 STA. 3+640, DORONGAN KETAKET, STA 1+592 TO STA. 2+840 MANGATAREM; (PHASE II-A)-R

Flood Control Management Cluster, Central Office

2017₱363.2M
Reported complete (100% progress, DPWH status On-Going)
View all 32 projects →

4. Implementation

Contract Amount

₱130,140,637.16

Progress

Past target date (DPWH On-Going)

Start Date

June 14, 2023

Target End

March 9, 2024

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.