GAA 2024 SSP24PB0031

CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS(SIPAG), SIPAG- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/FACILITIES CONSTRUCTION OF BARREN RIVER (DOWNSTREAM) FLOOD CONTROL STRUCT

CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS(SIPAG), SIPAG- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/FACILITIES CONSTRUCTION OF BARREN RIVER (DOWNSTREAM) FLOOD CONTROL STRUCT is a DPWH-tracked public work in Apayao 1st DEO, Cordillera Administrative Region. Reported contract value: ₱96,727,727.77. Status: Reported complete (100% progress, DPWH status On-Going). Contractor on record: JOMARCANN GEN CONST. Figures trace to dpwh.

Apayao 1st DEO, Cordillera Administrative Region
Region: Cordillera Administrative Region

Money Trail

1. Appropriation

Possible match · score 82%

UACS
18001
Amount
₱100,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Barren River ( Downstream ) Flood Control Structure along Chico River Basin, Sta. 37 + 200 - Sta. 38 + 973
GAA fiscal year
FY2024
DBM GAA source document

2. Allotment

Agency-level releases for FY2024, not tied to this contract

Apayao 1st DEO · SARO 1,917 (₱267,033,855,698.00) · NCA 1,287 (₱846,238,484,493.07)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

41 projects · ₱2.3B total · 0 flags

Other projects by this contractor

No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS (SECONDARY ROADS) BAGUIO - BONTOC ROAD K0267+810-K0268+000, K0270+000-K0270+178, K0279+00

Cordillera Administrative Region, Cordillera Administrative Region

2018₱210.4M
Reported complete (DPWH)
No sat.

OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION WORKS FOR CAGAYAN RIVER BASIN, CAGAYAN RIVER AT ALICAOCAO, CA

Region II, Region II

2023₱182.6M
Past target date (DPWH On-Going)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE (SECONDARY ROADS) BAGUIO BONTOC ROAD

Cordillera Administrative Region, Cordillera Administrative Region

2019₱129.3M
Reported complete (DPWH)
No sat.

RD UPGRNG CLAVERIA - CALANASAN - KABUGAO ROAD, K0661+929

Cordillera Administrative Region, Cordillera Administrative Region

2016₱123.3M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS MARCOS HI-WAYKO272+800 - KO272+909TUBA, BENGUET

Cordillera Administrative Region, Cordillera Administrative Region

2021₱120.6M
Reported complete (DPWH)
No sat.

REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/ HIGHWAY DEVELOPMENT MANAGEMENT (HDM-4) BAGUIO - BONTOC ROAD, K0265+750-K0266+000, K0266+000-K0266+475, K0266+680-K0266+840, K

Cordillera Administrative Region, Cordillera Administrative Region

2017₱112.2M
Reported complete (DPWH)
View all 41 projects →

4. Implementation

Contract Amount

₱96,727,727.77

Progress

Reported complete (100% progress, DPWH status On-Going)

Start Date

April 8, 2024

Target End

May 18, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.