Flood Control and Drainage23D00200

CONSTRUCTION OF FLOOD CONTROL AND SLOPE PROTECTION STRUCTURES ALONG LUKUTANG MALAKI RIVER, BARANGAY SAN ISIDRO, RODRIGUEZ, RIZAL PACKAGE 3

CONSTRUCTION OF FLOOD CONTROL AND SLOPE PROTECTION STRUCTURES ALONG LUKUTANG MALAKI RIVER, BARANGAY SAN ISIDRO, RODRIGUEZ, RIZAL PACKAGE 3 is a DPWH-tracked public work in Region IV-A, Region IV-A. Reported contract value: ₱192,194,528.03. Status: Past target date (DPWH On-Going). Contractor on record: PREMIUM MEGASTRUCTURES INC. Figures trace to dpwh.

Region IV-A, Region IV-A
Region: Region IV-A

Satellite images processing — before/after tiles will appear here after the next batch run.

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2023 GAA. DBM GAA FY2023

2. Allotment

No matching SARO/NCA release found for this project. Source: DBM SARO/NCA listings.

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

99 projects · ₱12.6B total · 0 flags

4. Implementation

Contract Amount

₱192,194,528.03

Progress

Past target date (DPWH On-Going)

Start Date

July 17, 2023

Target End

December 27, 2024

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.