RODEKOM GEN CONST AND ENT is listed as a company organization in Philippine public procurement records on this site, with 80 linked DPWH project(s) totaling about ₱6,377,789,878.98. Recorded delivery grade B (from public DPWH project records — not a finding of wrongdoing).
RODEKOM GEN CONST AND ENT
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 80
- Total value
- ₱6,377,789,878.98
- Published flags
- 29
- Region
- Benguet 1st DEO · Cordillera Administrative Region
Online presence
Google Maps: Rodekon constructionsGoogle Maps, 2026-10-22
CJC2+GM2, Baguio, Benguet
Licensed officers (PCAB)
- Brandy Dalilis Abeya · Authorized Managing Officer (PCAB license 38656) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for RODEKOM GEN CONST AND ENT — not an accusation or finding of wrongdoing.
Score: 87.20 / 100 · Projects in sample: 80 · As of Oct 28, 2026 UTC
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 78.5/100 · Weight: 45%
- graceDays
- 30
- componentScore
- 78.5
- lateCompletedProjects
- 9
- onTimeCompletedProjects
- 63
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 79
- pastTargetOngoingProjects
- 7
- undatedCompletedProjectsExcluded
- 1
- Termination rate
Component score: 100/100 · Weight: 20%
- totalProjects
- 80
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 20%
- avgOverrunPct
- 0.1
- componentScore
- 100
- projectsWithAbcAndCost
- 80
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
Component score: 91/100 · Weight: 10%
- projects
- 80
- componentScore
- 91
- flagsPerProject
- 0.3
- publishedV2Flags
- 24
- COA audit observations (linked)
Component score: 99.7/100 · Weight: 5%
- projects
- 80
- componentScore
- 99.7
- linkedObservations
- 1
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 48 of 78 geotagged projects (largest by contract value) — Open full map · Download projects (CSV)
- CONSTRUCTION OF ROAD, KAPANGAN, BENGUET - SAN GABRIEL, LA UNIONKAPANGAN, BENGUET22P00041 · ₱197,943,348.28 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS / NEW ROADS BAGUIO - LA TRINIDAD - ITOGON - SABLAN - TUBA AND TUBLAY, LABEY - LACAMEN PROVINCIAL ROAD (SECTION 4B OF BLI21P00045 · ₱193,000,000.00 · mapped
- BAGUIO - LA TRINIDAD - ITOGON - SABLAN TUBA AND TUBLAY, ASIN - NANGALISAN JCT. - BAYABAS - MONGLO JCT. (SECTION 1 OF BLISTT OUTER RING CIRCUMFERENTIAL ROAD), PACKAGE 1, BENGUETSABLAN, BENGUET22P00035 · ₱173,610,748.49 · mapped
- Construction of Flood Control Structure along Baroro River, Barangay Bacsil, Bacnotan, LaUnion24A00276 · ₱154,399,996.70 · mapped
- ORGANIZATIONAL OUTCOME 1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS / NEW ROADS BAGUIO - LA TRINIDAD - ITOGON - SABLAN - TUBA AND TUBLAY, LABEY - LACAMEN PROVINCIAL ROAD (SECTION 4A OF BLIS21P00011 · ₱144,750,000.00 · mapped
- CONSTRUCTION OF BY-PASSES/ DIVERSION ROADS INCLUDING ROW BAGUIO-LA TRINIDAD-ITOGON-SABLAN-TUBA-TUBLAY (BLISTT) OUTER RING CIRCUMFERENTIAL ROAD, INCL. ROW AND SLOPE PROTECTION, PHASE 3 (LABEY-LACAMEN SECTION, BOKOD, BENGUET), BENGUET LONE DISTRICT17P00034 · ₱144,750,000.00
- Construction of Flood Control Structure Along Aringay River, Barangay Anduyan, Tubao, La Union24A00152 · ₱144,749,869.10 · mapped
- Construction of Flood Control Structure Along Aringay River, Barangay Rizal, Tubao, La Union24A00154 · ₱144,749,743.40 · mapped
- Construction of Flood Control Structure Along Aringay River, Barangay Halog East, Tubao, La Union24A00153 · ₱144,749,737.00 · mapped
- Construction of Flood Control Structure along Aringay River, Barangay Rizal, Tubao, La Union23A00129 · ₱144,744,232.50 · mapped
- Construction of Flood Control Structure along Aringay River, Barangay Garcia - Gonzales, Tubao, La Union23A00131 · ₱144,732,166.40 · mapped
- Construction of Flood Control Structure along Aringay River, Barangay Halog East - Halog West, Tubao, La Union23A00130 · ₱144,720,639.70 · mapped
- Construction of Flood Control Structure along Aringay River, Barangay Anduyan, Tubao, La Union23A00128 · ₱144,719,366.20 · mapped
- NETWORK DEVELOPMENT-CONSTRUCTION OF BY-PASSES/ DIVERSION ROADS INCLUDING ROW BAGUIO-LA TRINIDAD-ITOGON-SABLAN-TUBA-TUBLAY (BLISTT) OUTER RING CIRCUMFERENTIAL ROAD, INCL. ROW AND SLOPE PROTECTION, PHASE 1 (TUEL-BALLUAY-CALOT-KAMOG SECTION, TUBLAY & SABLAN17P00048 · ₱142,532,584.88
- ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-TERTIARY ROADS, BAGAC-MARIVELES ROAD, PROVINCE OF BATAAN21C00003 · ₱137,616,281.91 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT - CONSTRUCTION OF MISSING LINKS/ NEW ROADS, LABEY-LACAMEN PROVINCIAL ROAD (SECTION 4B OF BLISTT OUTER RING, CIRCUMFERENTIAL ROAD) INCL. ROW AND SLOPE PROTECTION,18P00005 · ₱132,157,599.24 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS ABATAN-MANKAYAN-CERVANTES ROAD K0335 + 350 - K033521P00038 · ₱106,081,707.05 · mapped
- ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS - AYAGA-STA. MARCELA-FLORA-LASAM RD- K0675 + 050 - K0677 + 00025PC0006 · ₱105,877,442.84 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROG- BASIC INFRASTRUCTURE PROG- INTERJURISDICTIONAL ROADS AND/OR BRIDGES (OR, ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS) - REHABILITATION OF ROADS WITH SLIP SLOPES, COLLAPSE, AND LANDSLIDE, BAGAC AND MARIVELES, BATAAN23C00264 · ₱99,000,000.00 · mapped
- Construction of Baguyos Flood Control at Barangay Colalo, Mankayan, Benguet21P00065 · ₱96,500,000.00 · mapped
- ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - ALAMINOS-BOLINAO RD - KO341+600 - KO342+200 AT BRGY. TIEP, BANI, PANGASINAN22AG0113 · ₱96,500,000.00 · mapped
- ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - ALAMINOS-BOLINAO RD - KO340+246 - KO340+500, KO341+278 - KO341+600 AT BRGY. TIEP, BANI, PANGASINAN22AG0112 · ₱96,500,000.00 · mapped
- Construction of Flood Control Structure along Aringay River, Barangay Magsaysay, Tubao, La Union23A00132 · ₱96,463,694.46 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SPECIAL ROAD FUND - MOTOR VEHICLE USERS CHARGE (MVUC) AS PER R.A. 11239 - REHABILITATION / RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG ABATAN - MANKAYAN - CERVANTES ROAD, KO347+21P00005 · ₱96,381,938.48 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION-REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE- SECONDARY ROADS- GUREL-BOKOD-KABAYAN-BUGUIAS-ABATAN ROAD, K0353+320-K03519PF0012 · ₱95,499,949.48 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM: OFF-CARRIAGEWAY IMPROVEMENT BAGUIO-BONTOC ROAD (SECONDARY), K0277+000-K0277+213, K0277+235-K0277+K0556, K0277+556-K0278+214, K0278+367-K0278+608, K0278+819PF0022 · ₱95,101,715.00 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE, CHICO RIVER BASIN, RIPANG SECTION,STA. 34+414 - 35+489 (R.S.), BARANGAY RIPANG, CONNER, APAYAO25P00023 · ₱95,060,496.52 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE, CHICO RIVER BASIN, RIPANG SECTIONSTA. 35+489 - STA. 36+564 (R.S.)25P00014 · ₱95,042,609.73 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE, CHICO RIVER BASIN, CAGLAYAN SECTION, STA. 37+926 - STA. 39+239 (LEFT SIDE), BARANGAY CALAFUG, CONNER, APAYAO25P00024 · ₱95,030,989.39 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE, CHICO RIVER BASIN, GANGAT SECTION, STA. 39+001 - STA. 40+076 (R/S), BARANGAY CALAFUG, CONNER, APAYAO25P00018 · ₱95,016,104.77 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE, CHICO RIVER BASIN, GANGAT SECTION, STA. 39+001 - STA. 40+076 (L/S), BARANGAY CALAFUG, CONNER, APAYAO25P00019 · ₱94,971,768.43 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE, CHICO RIVER BASIN, GANGAT SECTION, STA. 40+076 - STA. 41+151 (R/S), BARANGAY CALAFUG, CONNER, APAYAO25P00017 · ₱94,932,370.00 · mapped
- ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SOIL COLLAPSE AND LANDSLIDE ALONG ACOP-KAPANGAN-KIBUNGAN-BAKUN ROAD, TUBLAY, BENGUET, K0273+081 - K0273+235, K0273+700 - K0275+050, K0275+120 - K0275+400, K0275+550 - K0276+0118PF0029 · ₱94,475,910.06 · mapped
- NETWORK DEVELOPMENT- PAVING OF UNPAVED ROADS- TERTIARY ROADS APAYAO-ILOCOS NORTE RD19PB0010 · ₱93,603,906.30 · mapped
- REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG GUREL- BOKOD- KABAYAN- BUGUIAS- ABATAN ROAD, K0326+300 - K0326+420, KABAYAN, BENGUET20PE0067 · ₱92,749,731.00 · mapped
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF FLOOD CONTROL POBLACION TO KARAO, BOKOD, BENGUET18PE0053 · ₱92,561,713.00 · mapped
- REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG GUREL- BOKOD- KABAYAN- BUGUIAS- ABATAN ROAD, K0340+500 - K0340+600, KABAYAN, BENGUET20PE0066 · ₱92,547,073.00 · mapped
- CONSTRUCTION OF MISSING LINKS/NEW ROADS, BAGUIO-LA TRINIDAD-ITOGON-SABLAN-TUBA-TUBLAY (BLISTT), LABEY-LACAMEN PROVINCIAL ROAD19PF0028 · ₱91,500,000.00 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION-REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE- SECONDARY ROADS, ACOP-KAPANGAN-KIBUNGAN-BAKUN ROAD, K0345+600-K0345+70019PF0027 · ₱90,677,190.00 · mapped
- CONSTRUCTION OF MISSING LINKS/NEW ROADS: LABEY-LACAMEN PROVINCIAL ROAD (SECTION 4A OF BLISTT OUTER RING CIRCUMFERENTIAL ROAD) INCLUDING ROW AND SLOPE PROTECTION, TUBLAY, BENGUET (STA.271+600 - STA.273+600)18PF0015 · ₱89,414,613.40 · mapped
- REHABILITATION / RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE: CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE ALONG GUREL-BOKOD-KABAYAN-BUGUIAS-ABATAN ROAD FROM (S00379LZ), K0314+680 - K0315+000, BOKOD, BENGUET19PE0001 · ₱86,841,235.65 · mapped
- CONSTRUCTION OF MISSING LINKS / NEW ROADS: CONSTRUCTION OF CONCRETE ROAD - SPECIFIC LOCATIONS ALONG BAGUIO-LA TRINIDAD-ITOGON- SABLAN-TUBA & TUBLAY (BLISTT), LABEY-LACAMEN PROVINCIAL ROAD (SECTION 4B OF BLISTT OUTER RING CIRCUMFERENTIAL ROAD), BENGUET, BO19PE0024 · ₱83,616,848.10 · mapped
- CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - ROSARIO BYPASS ROAD, LA UNION24A00052 · ₱81,302,306.62 · mapped
- NETWORK DEVELOPMENT: PAVING OF UNPAVED ROADS-TERTIARY ROADS CLAVERIA-CALANASAN-KABUGAO ROAD STA. K0716+277-K0718+027, CALANASAN, APAYAO19PC0054 · ₱77,785,684.00 · mapped
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION OF BAGUYOS FLOOD CONTROL19PF0016 · ₱77,200,000.00 · mapped
- OO1, REHAB/ RECONSTN OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - BAGUIO - BONTOC RD (NAPO SECTION)24PI0013 · ₱72,375,000.00 · mapped
- CONSTRUCTION OF MISSING LINKS/ NEW ROADS, SANTOL (LA UNION) - KIBUNGAN (BENGUET) ROAD, LA UNION22A00076 · ₱57,899,906.87 · mapped
- REPLACEMENT OF PERMANENT WEAK BRIDGES - NILANGOYAN BR. (B02628LZ) ALONG MANILA NORTH RD23A00251 · ₱54,039,974.26 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM CONSTRUCTION OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS: NRJ BULALACAO-CABACAB-SINTO ROAD LEADING TO AGRI-TOURISM FARMS IN BRGY. BULALACAO, MANKAYAN, BENGUET20PF0025 · ₱53,075,000.00 · mapped
- RECONSTRUCTION TO CONCRETE PAVEMENT - SHILAN - BECKEL RD - K0261+(-196) - K0261+050, K0262+890 - K0264+474, LA TRINIDAD, BENGUET21PE0046 · ₱51,792,265.95 · mapped
Equipment & capacity
PCAB license
- License no.
- 38656
- Category
- A · Medium B
- Minimum net worth for this category
- ₱30,000,000.00
- Allowable range of contract cost (ARCC)
- up to ₱300M
- License valid until
- Jan 21, 2028
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 38656); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
9 evaluations listed across 5 GPPB CPES releases; average final rating 93.0% over 5 rated projects; 8 site-visit ratings. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| May 5, 2025 | DPWH (JV) | ₱94,932,370.00 | On-going | 93.1% | — | 40th, p. 271 |
| May 19, 2024 | DPWH (JV) | ₱115,800,900.00 | Completed | 99.6% | 95.8% | 38th, p. 212 |
| May 15, 2024 | DPWH (JV) | ₱86,850,000.00 | Completed | — | — | 38th, p. 212 |
| Sep 14, 2023 | DPWH (JV) | ₱96,500,000.00 | Final | 88.4% | 90.6% | 36th, p. 16 |
| Aug 17, 2023 | DPWH (JV) | ₱289,500,000.00 | Final | 93.6% | 91.8% | 36th, p. 182 |
| Jun 5, 2023 | DPWH (JV) | ₱30,607,901.00 | Final | 93.8% | 95.1% | 36th, p. 182 |
| Oct 19, 2022 | DPWH (JV) | ₱30,607,901.00 | On-going | 96.0% | — | 35th, p. 151 |
| Oct 18, 2022 | DPWH (JV) | ₱51,792,266.00 | Completed | 92.1% | 91.9% | 35th, p. 151 |
| Jul 1, 2022 | DPWH (JV) | ₱94,087,502.00 | On-going | 89.4% | — | 34th, p. 76 |
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →