HORAMABI BUILDERS is listed as a company organization in Philippine public procurement records on this site, with 27 linked DPWH project(s) totaling about ₱1,543,132,641.24. Recorded delivery grade C (from public DPWH project records — not a finding of wrongdoing).
HORAMABI BUILDERS
CGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 27
- Total value
- ₱1,543,132,641.24
- Published flags
- 0
- Region
- Bataan 1st DEO · Region III
Online presence
Licensed officers (PCAB)
- Renedel R. Mendoza · Authorized Managing Officer (PCAB license 24129) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for HORAMABI BUILDERS — not an accusation or finding of wrongdoing.
Score: 79.50 / 100 · Projects in sample: 27 · As of Oct 28, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 73.2/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 73.2
- lateCompletedProjects
- 7
- onTimeCompletedProjects
- 17
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 26
- pastTargetOngoingProjects
- 2
- undatedCompletedProjectsExcluded
- 1
- Termination rate
Component score: 88.9/100 · Weight: 24%
- totalProjects
- 27
- componentScore
- 88.9
- terminatedProjects
- 1
- terminationRatePct
- 3.7
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 27
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 27
- componentScore
- No data for this figure; the component is excluded, not scored
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 27
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
17 geotagged projects — Open full map · Download projects (CSV)
- FLOOD CONTROL PROJECT-WESTERN RIVER, STO. TOMAS/BUCAO RIVER, ZAMBALES16C00085 · ₱420,445,870.04 · mapped
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, ALMACEN RIVER IMPROVEMENT PROJECT, HERMOSA AND ORANI, BATAAN 1ST LEGISLATIVE DISTRICT, PROVINCE OF BATAAN16C00093 · ₱195,371,675.34
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEM FLOOD CONTROL PROJECTS IN CENTRAL LUZON-DIKING WITH SLOPE PROTECTION, GUMAIN-PORAC RIVER, LUBAO, PAMPANGA 2ND L.D., PAMPANGA16C00008 · ₱91,682,549.58
- ROAD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL ROAD STRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED ROAD STANDARDS (HDM-4 PROJECT ANALYSIS)-TERTIARY ROADS, BAGAC-MARIVELES ROAD INCLUDING BRIDGES, BATAAN 2ND LEGISLATIVE DISTRICT, PROVINCE OF BATAAN16C00017 · ₱87,304,332.62 · mapped
- ASSET PRESERVATION OF NATIONAL ROADS-PREVENTIVE MAINTENANCE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT & MANAGEMENT-4 (HDM-4) SECONDARY ROADS, ROMAN EXPRESSWAY, BATAAN 2ND L.D. PROV. OF BATAAN16C00036 · ₱79,491,513.79 · mapped
- NETWORK DEVELOPMENT-IMPROVEMENT/WIDENING OF NATIONAL ROAD, TERTIARY ROADS, ALAS-ASIN PORT ROAD, BATAAN 2ND LEGISLATIVE DISTRICT, PROVINCE OF BATAAN15C00103 · ₱61,605,190.49 · mapped
- NETWORK DEVELOPMENT-IMPROVEMENT/WIDENING OF NATIONAL ROADS, SECONDARY ROADS, GOV. JJ LINAO ROAD, BATAAN 2ND L.D., BATAAN16C00006 · ₱57,065,881.59
- FLOOD MANAGEMENT SERVICES, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURES AND CHANNEL EXCAVATION OF TALISAY RIVER, CUPANG SECTION, STA.0+000-STA.0+405, BALANGA CITY, BATAAN17CB0074 · ₱39,829,310.23
- CONST. OF FOUR(4) STOREY TWENTY(20) CLASSROOM SCHOOL BUILDING AT BATAAN NHS, BALANGA CITY, BATAAN16CB0007 · ₱39,583,352.33
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURES AND CHANNEL EXCAVATION OF TALISAY RIVER, BALANGA SECTION, STA.0+000 - STA.0+567, BALANGA CITY, BATAAN17CB0068 · ₱38,386,166.72
- REHABILITATION OF FISCAL CAMACHO ST. BARANGAY TENEJERO, BALANGA CITY, BATAAN24CB0100 · ₱38,306,182.14 · mapped
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION/REHABILITATION OF FLOOD CONTROL PROJECT ALONG CURING CREEK, STA. 0+000 STA. 0+371, BARANGAY MULAWIN, ORANI, BATAAN19CA0047 · ₱37,084,671.16 · mapped
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURES AND CHANNEL EXCAVATION OF TALISAY RIVER, DIWA-NAGWALING SECTION, STA.0+000 - STA.0+425, PILAR, BATAAN17CB0067 · ₱36,890,711.13
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURES AND CHANNEL EXCAVATION OF TALISAY RIVER, NAGWALING SECTION, STA.0+000 - STA.0+430, PILAR, BATAAN17CB0066 · ₱36,301,375.55
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS REHABILITATION/ IMPROVEMENT OF FLOOD CONTROL PROJECT ALONG PAGSAKIAN II RIVER, STA. 0+000 , STA. 0+485 BARANGAY POBLACIONMORONG, BATAAN19CA0051 · ₱34,299,998.05 · mapped
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-REHABILITATION/MAJOR REPAIR OF FLOOD CONTROL STRUCTURE-REHABILITATION/IMPROVEMENT OF FLOOD CONTROL PROJECT ALONG MORONG RIVER, STA. 0+000- STA. 0+350 BARANGAY BINARITAN, MORON19CA0015 · ₱34,299,997.50 · mapped
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-REHABILITATION/MAJOR REPAIR OF FLOOD CONTROL STRUCTURE-REHABILITATION/IMPROVEMENT OF FLOOD CONTROL PROJECT ALONG PAGALANGGANG RIVER, STA. (-) 0+402.60 STA. (-) 0+745.619CA0033 · ₱34,299,995.71 · mapped
- ASSET PRESERVATION OF NATIONAL ROADS-PREVENTIVE MAINTENANCE BASED ON PAVEMENT MGMT. SYSTEM/HIGHWAY DEV'T. & MGMT.-4(HDM-4) TERTIARY ROAD, JCT. LAYACT-BALANGA-MARIVELES PORT ROAD, BATAAN 2ND LEGISLATIVE DISTRICT.15C00086 · ₱29,510,041.08 · mapped
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-REHABILITATION/ IMPROVEMENT OF FLOOD CONTROL PROJECT ALONG FUERTE RIVER, STA. 0+000 STA. 0+300, BARANGAY POBLACION, MORONG, BATAAN19CA0050 · ₱29,399,996.57 · mapped
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-REHABILITATION/MAJOR REPAIR OF FLOOD CONTROL STRUCTURES-REHABILITATION OF FLOOD CONTROL STRUCTURES ALONG PAGALANGGANG RIVER (TUCOP SECTION), STA. 0+118.00- STA. 0+490.00, BARANG19CA0014 · ₱24,499,986.38 · mapped
- CONST./UPGRADING/REHAB. OF DRAINAGE ALONG BAGAC-MARIVELES ROAD KO191+018-KO194+064, MARIVELES, BATAAN 2ND LD16CB0013 · ₱20,702,634.91 · mapped
- CONSTRUCTION/IMPROVEMENT OF ABUCAY RIVER ABUCAY, BATAAN15CA0104 · ₱16,997,415.03
- ASSET PRESERVATION OF NATIONAL ROADS- REHABILITATION/RECONSTRUCTION UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGED BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT AND MANAGEMENT-4 (HDM-4), TERTIARY ROADS ALONG JUNCTION LAYAC-BALANGA16CA0003 · ₱14,512,011.20 · mapped
- CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS-CONSTRUCTION/IMPROVEMENT OF PENTOR-BALSIK RIVER, (TORRES SECTION), DINALUPIHAN, BATAAN15CA0093 · ₱13,950,474.35 · mapped
- CONSTRUCTION/IMPROVEMENT OF COLO RIVER (SAN BENITO SECTION), DINALUPIHAN, BATAAN15CA0103 · ₱13,671,000.00
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TANATO RIVER, BALANGA CITY, BATAAN24CB0094 · ₱9,900,000.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BLDG, BAGUMBAYAN, BAGAC, BATAAN24C00149 · ₱7,740,307.75 · mapped
Equipment & capacity
PCAB license
- License no.
- 24129
- Category
- AAA · Large B
- Minimum net worth for this category
- ₱180,000,000.00
- Allowable range of contract cost (ARCC)
- ₱450M or above (no published ceiling)
- License valid until
- Dec 18, 2026
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 24129); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
1 evaluation listed across 1 GPPB CPES release; 1 site-visit rating. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| Feb 15, 2025 | DPWH | ₱38,306,182.00 | On-going | 91.7% | — | 39th (rev), p. 91 |
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
- DPWH Infrastructure: 29 awards · ₱572,150,907.61
- Province of Bataan Infrastructure: 195 awards · ₱209,881,421.08
- Authority of the Freeport Area of Bataan Infrastructure: 5 awards · ₱119,264,647.14
- Province of Antique Infrastructure: 1 award · ₱101,532,198.45
- Municipality of San Antonio, Zambales Infrastructure: 1 award · ₱61,707,377.04
- Bataan Peninsula State University Infrastructure: 4 awards · ₱53,899,306.67
- DOH Infrastructure: 1 award · ₱50,033,456.20
- AFPPS Infrastructure: 3 awards · ₱36,991,398.43
- City of Balanga Infrastructure: 2 awards · ₱11,430,594.90
- Municipality of Hermosa, Bataan Infrastructure: 1 award · ₱4,991,816.85
- PEZA Infrastructure: 2 awards · ₱2,479,705.13
- Bataan Peninsula State University Goods & services: 1 award · ₱1,787,877.01
- ENG'G PABAC3 005-25
- ENG'G PABAC3 010-25
- ENG'G PABAC3 004-25
- Renovation of Facade and Municipal Buildings
- Construction Projects
- Construction Projects
- Concreting of Farm to Market Road
- 24CB0100₱38,306,182.14· 2024-05-16· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - BATAAN 2ND DEO
- 24CB0094₱9,672,327.01· 2024-04-12· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - BATAAN 2ND DEO
- Supply of Materials, Labor and Equipment for the C
- 24C00149
- Construction/Maintenance of Flood Mitigation Structures and Drainage Systems-Rehabilitation/Major Repair of Flood Control Structures-Rehabilitation of Flood Control Structures along Pagalanggang River
- Construction/Maintenance of Flood Mitigation Structures and Drainage Systems-Rehabilitation/Major Repair of Flood Control Structure-Rehabilitation/Improvement of Flood Control Project along Morong Riv
- Construction/Maintenance of Flood Mitigation Structures and Drainage Systems-Rehabilitation/ Improvement of Flood Control Project along Fuerte River, Sta. 0+000 – Sta. 0+300, Barangay Poblacion, Moron
- Construction/Maintenance of Flood Mitigation Structures and Drainage Systems-Rehabilitation/Major Repair of Flood Control Structure-Rehabilitation/Improvement of Flood Control Project along Pagal
- Construction/Maintenance of Flood Mitigation Structures and Drainage Systems- Construction/Rehabilitation of Flood Control Project along Curing Creek, Sta. 0+000 – Sta. 0+371, Barangay Mulawin , Orani
- Construction/Maintenance of Flood Mitigation Structures and Drainage Systems – Rehabilitation/ Improvement of Flood Control Project along Pagsakian II River, Sta. 0+000 – Sta. 0+485, Barangay Poblac
- Construction Projects
- Rehabilitation/Improvement
- Construction of Three(3) Storey Pediatric Building
- 16C00036₱79,491,513.79· 2016-03-23· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - REGION III
- Construction/Improvement
- Construction
- 16CB0013₱20,702,634.91· 2016-03-16· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - BATAAN 2ND DEO
- 16CB0007₱39,583,352.33· 2016-03-14· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - BATAAN 2ND DEO
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →