CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG AGOS RIVER, INFANTA, QUEZON, (PACKAGE I)
CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG AGOS RIVER, INFANTA, QUEZON, (PACKAGE I) is a DPWH-tracked public work in Region IV-A, Region IV-A. Reported contract value: ₱192,996,411.15. Status: Past target date (DPWH On-Going). Contractor on record: SILVERWOLVES CONST CORP. Figures trace to dpwh.
Satellite images processing — before/after tiles will appear here after the next batch run.
Total Contract Cost