WAYCON BUILDERS AND CONST SUPPLY CORP FOR:WAYCON BUILDERS is listed as a company organization in Philippine public procurement records on this site, with 474 linked DPWH project(s) totaling about ₱22,238,335,590.73. Recorded delivery grade C (from public DPWH project records — not a finding of wrongdoing).
WAYCON BUILDERS AND CONST SUPPLY CORP FOR:WAYCON BUILDERS
CGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 474
- Total value
- ₱22,238,335,590.73
- Published flags
- 0
- Region
- Quezon 2nd DEO · Region IV-A
Public Record Grade
A transparent, data-derived summary of reported public records for WAYCON BUILDERS AND CONST SUPPLY CORP FOR:WAYCON BUILDERS — not an accusation or finding of wrongdoing.
Score: 71.80 / 100 · Projects in sample: 474 · As of Oct 28, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 47.3/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 47.3
- lateCompletedProjects
- 1
- onTimeCompletedProjects
- 287
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 448
- pastTargetOngoingProjects
- 160
- undatedCompletedProjectsExcluded
- 19
- Termination rate
Component score: 98.7/100 · Weight: 24%
- totalProjects
- 474
- componentScore
- 98.7
- terminatedProjects
- 2
- terminationRatePct
- 0.4
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0.1
- componentScore
- 100
- projectsWithAbcAndCost
- 473
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 474
- componentScore
- No data for this figure; the component is excluded, not scored
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 474
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 50 of 456 geotagged projects (largest by contract value) — Open full map · Download projects (CSV)
- PREVENTIVE MAINTENANCE - SECONDARY ROADS PAGBILAO-DALAHICAN PORT RD (OLD MSR-MAYAO-TALAO-TALAO-DALAHICAN PORT), PACKAGE 1, QUEZON25D00237 · ₱330,937,846.76 · mapped
- PREVENTIVE MAINTENANCE - SECONDARY ROADSPAGBILAO-DALAHICAN PORT RD (OLD MSR-MAYAO-TALAO-TALAO-DALAHICAN PORT), PACKAGE 2, QUEZON25D00274 · ₱327,628,469.29 · mapped
- PREVENTIVE MAINTENANCE - TERTIARY ROADS CATANAUAN-BUENAVISTA RD - K0275 + 000 - K0276 + 000, K0278 + 000 - K0279 + 000, K0280 + 922 - K0282 + 012, K0282 + 012 - K0282 + 235, K0282 + 235 - K0283 + 00025D00238 · ₱233,950,050.96 · mapped
- CONSTRUCTION OF BY-PASS AND DIVERSION ROADSLIPA CITY-PADRE GARCIA DIVERSION ROAD, PACKAGE M, BATANGAS24D00077 · ₱190,096,389.28 · mapped
- REHABILITATION OF DAMAGED SLOPE PROTECTION AT LIAN RIVER (DOWNSTREAM), NASUGBU AND LIAN, BATANGAS (PACKAGE D)25D00249 · ₱187,206,018.40 · mapped
- A. ORGANIZATIONAL OUTCOME 1. ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM 1. NETWORK DEVELOPMENT PROGRAM B. CONSTRUCTION OF MISSING LINKS / NEW ROADS 2. ATIMONAN - MAUBAN ROAD, ATIMONAN SECTION, PACKAGE B, QUEZON18DL0425 · ₱183,530,837.43 · mapped
- ROAD WIDENING - PRIMARY ROADSDAANG MAHARLIKA (LZ) - K0169+671 - K0171 + 453, K0171 +453 - K0171 + 503, K0171 + 571 - K0171 + 579, K0172+ 640 - K0175 + 52224D00156 · ₱178,927,335.31 · mapped
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MALAKING TUBIG RIVER, TIAONG, QUEZON, PHASE II23D00126 · ₱170,221,273.38 · mapped
- CLUSTER 4:1. DAANG MAHARLIKA (LZ) - K0092 + (-524) - K0092 + (-249.50)2. DAANG MAHARLIKA (LZ) - K0110 + 000 - K0110 + 7373. DAANG MAHARLIKA (LZ) - K0107 + 700 - K0108 + 8314. DAANG MAHARLIKA (LZ) - K0106+735.00 - K0107 + 124.5024D00235 · ₱152,171,966.50 · mapped
- FY 2024 DPWH INFRASTRUCTURE PROGRAM - ORGANIZATIONAL OUTCOME 1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAMPREVENTIVE MAINTENANCE - PRIMARY ROADS - DAANG MAHARLIKA (LZ) -K0061 + 540 - K0063 + 72524D00076 · ₱149,406,199.16 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-MULTI PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE FACILITIES OF NATIONAL GOVERNMENT COMPLEX, BARANGAY MAYAO P23DJ0093 · ₱144,750,000.00 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-SECONDARY ROADS, QUEZON ECO-TOURISM RD-K0160+142-K0162+62124DJ0164 · ₱144,749,886.30 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BUSIGON RIVER AT MATANLANG-MABILO II, LABO, CAMARINES NORTE (PHASE 5), BRGY. MATANLANG, LABO, CAMARINES NORTE24FC0076 · ₱144,749,743.10 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BUSIGON RIVER AT MATANLANG-MABILO II, LABO, CAMARINES NORTE (PHASE 6), BRGY. MATANLANG, LABO, CAMARINES NORTE24FC0077 · ₱144,749,646.56 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT BARANGAY ANAHAW - BARANGAY MALASUGUI, LABO, CAMARINES NORTE (BUSIGON RIVER)25FC0068 · ₱144,030,966.10 · mapped
- OO 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - LUCENA-TAYABAS-LUCBAN-SAMPALOC-MAUBAN PORT RD - K0128 + (-810) - K0129 +156...K0140 + 715 - K0141 + 12025DK0102 · ₱142,969,575.00 · mapped
- CONSTRUCTION OF BREAK WATER, BARANGAY PUNTA, UNISAN, QUEZON18DM0081 · ₱141,852,913.08 · mapped
- CONSTRUCTION OF ROAD AT BARANGAY TIGBINAN, LABO, CAMARINES NORTE25FC0090 · ₱140,414,319.79 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BUSIGON RIVER, PHASE I, BARANGAY TIGBINAN, LABO, CAMARINES NORTE25FC0038 · ₱140,411,770.70 · mapped
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE (PHASE III), BARANGAY LUGUI, LABO, CAMARINES NORTE25FC0071 · ₱140,408,978.86 · mapped
- CONSTRUCTION OF ROAD AT BARANGAY MABILO 1, LABO, CAMARINES NORTE25FC0080 · ₱140,407,284.29 · mapped
- CONSTRUCTION OF FLOOD CONTROL AT BRGY. MABILO I - MABILO II (LABO RIVER) LABO, CAMARINES NORTE (PACKAGE 4), BRGY. MABILO I - BRGY. MABILO II, LABO, CAMARINES NORTE24FC0078 · ₱140,405,944.53 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BUSIGON RIVER, PHASE III, BARANGAY GUISICAN, LABO, CAMARINES NORTE25FC0029 · ₱140,396,927.85 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BUSIGON RIVER, PHASE II, BARANGAY GUISICAN, LABO, CAMARINES NORTE25FC0028 · ₱140,395,214.89 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MATOGDON RIVER, PHASE II, BARANGAY ANAHAW, BARANGAY BAUTISTA AND BARANGAY MABILO II, LABO, CAMARINES NORTE25FC0013 · ₱140,395,076.05 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY CABUSAY, LABO CAMARINES NORTE25FC0023 · ₱140,388,718.33 · mapped
- CONSTRUCTION OF FLOOD CONTROL AT BRGY. MABILO I - MABILO II (LABO RIVER) LABO, CAMARINES NORTE (PACKAGE 5), BRGY. MABILO I, LABO, CAMARINES NORTE24FC0079 · ₱140,387,056.13 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BUSIGON RIVER, PHASE I, BARANGAY GUISICAN, LABO, CAMARINES NORTE25FC0026 · ₱140,382,652.84 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MATOGDON RIVER, PHASE I, BARANGAY ANAHAW, BARANGAY BAUTISTA AND BARANGAY MABILO II, LABO, CAMARINES NORTE, BRGY ANAHAW - BAUTISTA, LABO, CAMARINES NORTE25FC0012 · ₱140,361,266.28 · mapped
- CONSTRUCTION OF ROAD AT BRGY. GUISICAN, LABO, CAMARINES NORTE (PHASE III)25FC0084 · ₱117,006,067.98 · mapped
- CONSTRUCTION OF ROAD AT BRGY. DAGANG, PARACALE, CAMARINES NORTE (PHASE III)25FC0088 · ₱116,999,128.92 · mapped
- NETWORK DEVELOPMENT - CONSTRUCTION OF MISSING LINKS / NEW ROADS - LAGUNA LAKE HIGHWAY EXTENSION (PHASE 2), MUNTINLUPA CITY21O00002 · ₱111,982,940.90 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES, LACAWAN BR. (B02937LZ) ALONG MSR DIVERSION RD24DJ0062 · ₱111,402,253.75 · mapped
- ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS - ASPHALT OVERLAY MSR JCT-LOPEZ-CATANAUAN RD - K0237 + (-744) - K0240 + 000, CATANAUAN, QUEZON24DM0119 · ₱98,000,000.00 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-TERTIARY ROADS, MSR JCT TIAONG-DOLORES RD-K0097+171-K0099+90824DJ0223 · ₱96,500,000.00 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-SECONDARY ROADS, QUEZON ECO-TOURISM-SARIAYA-CANDELARIA-TIAONG-SAN ANTONIO ROAD (PACKAGE 26), QUEZON24DJ0145 · ₱96,500,000.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF QUEZON INDUSTRIAL HIGHWAY22DJ0053 · ₱96,500,000.00 · mapped
- NETWORK DEVELOPMENT PROGRAM: OFF-CARRIAGEWAY IMPROVEMENT - SECONDARY ROADS - GUMACA - PITOGO - MULANAY - SAN NARCISO RD (S04256LZ) K0264+785 - K0268+613, SAN NARCISO, QUEZON19DM0085 · ₱96,500,000.00 · mapped
- ASSET PRESERVATION - REHABILITATION /RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS - P BURGOS-POTOTANIN JCT RD (MALICBOY SECTION), PAGBILAO, QUEZONPAGBILAO, QUEZON22DM0094 · ₱96,500,000.00 · mapped
- CONSTRUCTION OF COCONUT RESEARCH AND DEVELOPMENT CENTER, CATANAUAN, QUEZON18DM0090 · ₱96,500,000.00 · mapped
- OFF-CARRIAGEWAY IMPROVEMENT: SHOULDER PAVING/CONSTRUCTION - P BURGOS-POTOTANIN JCT-K0177+570 - K0178+107, K0178+142 -K0186+632, AGDANGAN - UNISAN SECTION18DM0009 · ₱96,500,000.00 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE - TERTIARY ROADS, LUTUCAN - GUISGUIS PORT RD - K0121+474-K0124+08024DJ0234 · ₱96,500,000.00 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-SECONDARY ROADS, QUEZON ECO-TOURISM-K0150+271-K0152+31124DJ0163 · ₱96,500,000.00 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-SECONDARY ROADS, SARIAYA BYPASS ROAD-K0118+(-)110 - K0119+14024DJ0100 · ₱96,500,000.00 · mapped
- OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF DUMACAA RIVER FLOOD CONTROL (PACKAGE 2), LUCENA CITY, QUEZON24DJ0015 · ₱96,500,000.00 · mapped
- ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPECOLLAPSE, AND LANDSLIDE - TERTIARY ROADS - TALABA-SUMMIT-PANAON RD (SOCCORO SECTION), UNISAN, QUEZONUNISAN, QUEZON22DM0087 · ₱96,500,000.00 · mapped
- OFF-CARRIAGEWAY IMPROVEMENT: SHOULDER PAVING/CONSTRUCTION - MULANAY-SN FRANCISCO RD - K0293+793 - K0295+484, K0295+509 - K0302+769, MULANAY - SAN FRANCISCO SECTION18DM0008 · ₱96,500,000.00 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-SECONDARY ROADS, PAGBILAO-DALAHICAN PORT RD-K0137+ (-)700-K0137+(-)503, K0137+(-)438-K0138+86524DJ0087 · ₱96,500,000.00 · mapped
- SIPAG: ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF ROAD WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE AT BRGY. KINAGUNAN, AGDANGAN, QUEZONAGDANGAN, QUEZON22DM0109 · ₱96,500,000.00 · mapped
- ASSET PRESERVATION PROGRAM, PREVENTIVE MAINTENANCE - SECONDARY ROADS, MSR JCT-LOPEZ-BUENAVISTA RD - K0218+802-K0219+442, K0219+533-K0220+222, K0220+272-K0220+376, K0220+440-K0221+285, K0221+579-K0222+014, K0222+048-K0222+13425DL0132 · ₱96,500,000.00 · mapped
Equipment & capacity
PCAB license
No PCAB license is linked to this record. It may be a joint venture, a foreign firm, or a name we could not match. Search PCAB.
Government performance ratings (CPES)
No CPES evaluation lists this contractor's PCAB license in the GPPB releases we loaded (34th–41st).
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →