RAMARPLUS INC FORMERLY RAMAR ENT is listed as a company organization in Philippine public procurement records on this site, with 82 linked DPWH project(s) totaling about ₱5,779,949,940.04. Recorded delivery grade B (from public DPWH project records — not a finding of wrongdoing).
RAMARPLUS INC FORMERLY RAMAR ENT
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 82
- Total value
- ₱5,779,949,940.04
- Published flags
- 9
- Region
- Albay 3rd DEO · Region V
Online presence
Public Record Grade
A transparent, data-derived summary of reported public records for RAMARPLUS INC FORMERLY RAMAR ENT — not an accusation or finding of wrongdoing.
Score: 85.20 / 100 · Projects in sample: 82 · As of Oct 28, 2026 UTC
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 73.1/100 · Weight: 47%
- graceDays
- 30
- componentScore
- 73.1
- lateCompletedProjects
- 2
- onTimeCompletedProjects
- 67
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 81
- pastTargetOngoingProjects
- 12
- undatedCompletedProjectsExcluded
- 1
- Termination rate
Component score: 100/100 · Weight: 21%
- totalProjects
- 82
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 21%
- avgOverrunPct
- 0.1
- componentScore
- 100
- projectsWithAbcAndCost
- 82
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
Component score: 98.5/100 · Weight: 11%
- projects
- 82
- componentScore
- 98.5
- flagsPerProject
- 0.05
- publishedV2Flags
- 4
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 82
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 48 of 79 geotagged projects (largest by contract value) — Open full map · Download projects (CSV)
- Construction of Quinale "A" River Flood Mitigation Structure (Polangui and Libon Section), Polangui, Albay22F00020 · ₱192,707,498.10 · mapped
- MFO1-NATIONAL ROAD NETWORK SERVICES, NETWORK DEVELOPMENT: CONST. OF MISSING GAPS CONNECTING NATIONAL ROADS, INCLUDING ROW, BACON-MANITO ROAD, ROAD COMPONENTS (BRGY. OSIAO-BRGY. STO. NIÑO),SORSOGON 1ST LD, BACON, SORSOGON PROVINCE16F00072 · ₱183,308,174.63 · mapped
- REHABILITATION/RESTORATION OF WARAS RIVER FLOOD CONTROL PROJECT, (SAN ISIDRO - SAGRADA SECTION), IRIGA CITY, CAMARINES SUR, CAMARINES SUR 5TH LEGISLATIVE DISTRICT20F00144 · ₱181,485,668.32 · mapped
- REHABILITATION/RESTORATION OF WARAS RIVER FLOOD CONTROL PROJECT, (SAN JOSE-SAN ISIDRO SECTION), IRIGA CITY, CAMARINES SUR, CAMARINES SUR 5TH LEGISLATIVE DISTRICT20F00143 · ₱181,253,059.45 · mapped
- REHABILITATION/RECONSTRUCTION AND IMPROVEMENT OF FLOOD CONTROL STRUCTURES ALONG SOLONG RIVER, BRGY. LIBOD, CAMALIG, ALBAY, CAMALIG, ALBAY (2ND LEGISLATIVE DISTRICT)24F00391 · ₱173,663,048.80 · mapped
- Construction of Flood Control Structure (Facing Downstream along River Dam Section) Zone 1, Barangay Sta. Cruz, Libon, Albay24FO0100 · ₱144,750,000.00 · mapped
- ORGANIZATIONAL OUTCOME 2- PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF PINANGANURAN RIVER FLOOD CONTROL STRUCTURE ALONG SPILLW24FO0086 · ₱144,750,000.00 · mapped
- OO2-PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEMS-REHABILITATION OF FLOOD MITIGATION STRUCTURE AT TIBU RIVER, LEGAZPI CITY, ALBAY 2ND LEGISLATIVE DIST22F00010 · ₱144,749,994.32 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SAN JUAN BRIDGE24FO0081 · ₱144,748,891.25 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATING STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG AGOS RIVER, STA. CRUZ, LIB23FO0051 · ₱144,679,961.30 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM -SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CLUSTER XIV-2023: (1) CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG KALAKRAN RIVER AT SAN ISIDRO, OAS, ALBAY; AND (2) CONSTRUC,23FO0050 · ₱144,610,000.00 · mapped
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG KALAKRAN RIVER, PUROK24FO0080 · ₱139,678,946.79 · mapped
- OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION/REHABILITATION OF PAWILI RIVER FLOOD MITIGATION STRUCTURE, BRGY. SAGRADA AND BRGY. BA21F00023 · ₱115,799,265.32 · mapped
- OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEMS-CONSTRUCTION/REHABILITATION OF WARAS RIVER FLOOD MITIGATION STRUCTURE, BRGY. SAGRADA AND BRGY. SAN21F00006 · ₱106,149,950.58 · mapped
- OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEMS-CONSTRUCTION/IMPROVEMENT OF CATBURAWAN RIVER FLOOD CONTROL STRUCTURE, OAS AND LIGAO CITY, ALBAY, OA21F00003 · ₱106,149,747.12 · mapped
- OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION/IMPROVEMENT OF NAGAS RIVER FLOOD MITIGATION STRUCTURE, NAGAS, OAS, ALBAY, OAS, ALBAY21F00031 · ₱106,149,664.99 · mapped
- Construction of Pawili River Flood Mitigation Structure, Brgy. Causip and Brgy. Fabrica, Bula, Camarines Sur22F00101 · ₱97,281,469.34 · mapped
- Construction of Barit River Flood Mitigation Structure (San Jose Section), Nabua, Camarines Sur22F00065 · ₱97,244,668.14 · mapped
- Construction/Rehabilitation of Pawili River Flood Mitigation Structure, Brgy. San Jose and Brgy. Bagumbayan, Bula, Camarines Sur22F00054 · ₱97,103,902.58 · mapped
- OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION/IMPROVEMENT OF BARIT RIVER FLOOD MITIGATION STRUCTURES(SAN MIGUEL-SAN JOSE SECTION),N21F00027 · ₱96,499,034.00 · mapped
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF RIVER BANK PROTECTION WORKS AND DRAINAGE SYSTEM ALONG BARANGAY BANADERO-BARANGAY BUDIAO,DARAGA,24FB0148 · ₱96,498,565.71 · mapped
- Construction of Barit River Flood Mitigation Structure (Antipolo Young Section), Nabua, Camarines Sur22F00052 · ₱93,127,727.21 · mapped
- OO2-PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS -FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG CADACAN RIVER, STO. DOMINGO SECTION, STA. 28+8818F00066 · ₱93,119,979.68 · mapped
- ORGANIZATIONAL OUTCOME 2 - PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE OF LUKSONG RIVER, ZONE 4 S24FO0055 · ₱93,111,474.41 · mapped
- CONST./REHAB./IMPVT. OF CABILOGAN RIVER COURSE IN ALBAY, CAVASI/PANDAN SECTION, UPSTREAM, CAVASI, LIGAO CITY, ALBAY 3RD LEGISLATIVE DISTRICT17F00064 · ₱90,880,397.00
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE OF TALONGOG-BUSAC FLOOD CONTROL, OAS, ALBAY20FO0031 · ₱84,767,530.00 · mapped
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE OF CABILOGAN RIVER CONTROL (BONGA SECTION), LIGAO CITY20FO0025 · ₱84,765,600.00 · mapped
- REHABILITATION/IMPROVEMENT OF FLOOD CONTROL STRUCTURE, LEFT AND RIGHT FACING UPSTREAM OF BACOLOD BRIDGE, LIBON, ALBAY20FO0086 · ₱77,200,000.00 · mapped
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AT PANTAO, LIBON, ALBAY22FO0030 · ₱76,708,491.12 · mapped
- Rehabilitation of Left and Right Side of Talisay River Flood Mitigation Structure, Brgy. Zone 4, Libon, Albay23FO0062 · ₱74,249,999.50 · mapped
- Construction of Flood Control Structure, Right Side Facing Upstream of Double Barrel Box Culvert at Sitio Camlambay, Brgy. Bulusan, Libon, Albay23FO0053 · ₱74,179,689.03 · mapped
- Construction of Bacolod Flood Control Structure (Rightside facing Downstream of Bacolod Bridge) Bacolod, Libon, Albay23FO0053 · ₱72,373,483.60 · mapped
- Construction of Agos River Control Structure, barangay Lourdes, Polangui, Albay23FO0048 · ₱72,305,000.00 · mapped
- Construction of Agos River Control Structure, barangay La Purisima, Polangui, Albay23FO0048 · ₱72,305,000.00 · mapped
- Construction of Flood Revetment Wall Zone 1 and 2, barangay San Agustin, Libon, Albay23FO0062 · ₱72,304,999.43 · mapped
- OO2-PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONST. & IMPR. OF FLOOD CONTROL DIKES IN LIBON, ALBAY FOR CRITICAL SECTIONS OF BARANGAYS EAST CARISAC, SAN AGU18F00026 · ₱69,443,884.00 · mapped
- OO2-PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONST. AND IMPVT. OF FLOOD CONTROL DIKES IN POLANGUI, ALBAY FOR CRITICAL SECTIONS OF BARANGAYS KINALE, BALANGI18F00053 · ₱69,399,643.94 · mapped
- BICOL RIVER BASIN WATERSHED MANAGEMENT PROJECT (FLOOD MITIGATION COMPONENT)-POLANGUI FLOOD CONTROL, POLANGUI, ALBAY 3RD LD16F00098 · ₱68,930,658.50
- Construction of River Slope Protection along Waras River, Bagumbayan Section, Baao, Camarines Sur22FN0057 · ₱65,187,109.30 · mapped
- 002: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION/REHABILITATION OF FLOOD CONTROL STRUCTURE, DOWNSTREAM WARAS RIVER, BAAO SECTION, BAAO, CAMARINES SUR20FN0060 · ₱62,655,994.52 · mapped
- 002: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF FLOOD CONTROL STRUCTURE, ALONG WARAS RIVER, DOWNSTREAM IMBAN BRIDGE, SAN ANTONIO POB, NABUA CAM. SUR20FN0036 · ₱62,329,099.71 · mapped
- 002: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF FLOOD CONTROL STRUCTURE, DOWNSTREAM ALONG BICOL RIVER, STO. DOMINGO BR, INAPATAN SECT, NABUA CAM. SUR20FN0035 · ₱62,328,557.00 · mapped
- CONSTRUCTION OF MASARAWAG FLOOD CONTROL STRUCTURE, BRGY. MASARAWAG, GUINOBATAN, ALBAY20FO0081 · ₱57,297,087.40 · mapped
- Rehabilitation of Bacolod Flood Control Structure (Left Side Facing Downstream of Bacolod Bridge) Phase II in Libon, Albay22FO0057 · ₱49,000,000.00 · mapped
- Construction of Pinanganuran River Flood Control Structure, Barangay Villa Petrona, Libon, Albay22FO0056 · ₱49,000,000.00 · mapped
- Construction of Pinanganuran River Flood Control Structure, Barangay San Jose, Libon, Albay22FO0056 · ₱49,000,000.00 · mapped
- Construction of Nagasgasan River Flood Control Structure, Barangay Obaliw Rinas, Oas, Albay22FO0100 · ₱48,999,374.49 · mapped
- Construction of Kalakran River Flood Control Structure, Barangay Pistola, Oas, Albay22FO0100 · ₱48,999,187.66 · mapped
- Construction of Catburawan River Flood Control Structure, Barangay Catburawan, Ligao City, Albay22FO0055 · ₱48,969,287.60 · mapped
- CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION STRUCTURES OF MAGCASILI RIVER, BRGY. BALINAD, POLANGUI, ALBAY19FO0078 · ₱47,906,963.36 · mapped
Equipment & capacity
PCAB license
- License no.
- 08092
- Category
- B · Medium A
- Minimum net worth for this category
- ₱10,000,000.00
- Allowable range of contract cost (ARCC)
- up to ₱150M
- License valid until
- Oct 22, 2026
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 08092); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
6 evaluations listed across 4 GPPB CPES releases; average final rating 92.0% over 3 rated projects; 6 site-visit ratings. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| Jun 27, 2025 | DPWH | ₱144,748,891.00 | Completed | 91.0% | 89.2% | 40th, p. 254 |
| May 5, 2025 | DPWH | ₱144,750,000.00 | Completed | 96.4% | 94.2% | 40th, p. 254 |
| Oct 22, 2024 | DPWH | ₱144,750,000.00 | On-going | 92.8% | — | 39th (rev), p. 174 |
| Jul 28, 2024 | DPWH | ₱144,748,891.00 | On-going | 88.0% | — | 38th, p. 198 |
| Oct 14, 2022 | DPWH | ₱65,187,109.00 | On-going | 90.0% | — | 35th, p. 141 |
| Nov 7, 2019 | DPWH | ₱47,906,963.00 | Completed | 91.2% | 92.5% | 40th, p. 254 |
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →