Rehabilitation of Bacolod Flood Control Structure (Left Side Facing Downstream of Bacolod Bridge) Phase II in Libon, Albay
Rehabilitation of Bacolod Flood Control Structure (Left Side Facing Downstream of Bacolod Bridge) Phase II in Libon, Albay is a DPWH-tracked public work in LIBON (ALBAY), ALBAY, Region V. Reported contract value: ₱49,000,000.00. Status: Reported complete (DPWH). Contractor on record: RAMARPLUS INC FORMERLY RAMAR ENT. Figures trace to sumbong.
Total Contract Cost




