MAKAPA CORP is listed as a company organization in Philippine public procurement records on this site, with 123 linked DPWH project(s) totaling about ₱9,711,114,465.38. Recorded delivery grade B (from public DPWH project records — not a finding of wrongdoing).
MAKAPA CORP
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 123
- Total value
- ₱9,711,114,465.38
- Published flags
- 5
- Region
- Region V · Region V
Online presence
Licensed officers (PCAB)
- XAVIER YVAN MARTINEZ PADILLO · Authorized Managing Officer (PCAB license 30029) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for MAKAPA CORP — not an accusation or finding of wrongdoing.
Score: 82.30 / 100 · Projects in sample: 123 · As of Oct 28, 2026 UTC
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 65.1/100 · Weight: 47%
- graceDays
- 30
- componentScore
- 65.1
- lateCompletedProjects
- 5
- onTimeCompletedProjects
- 88
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 116
- pastTargetOngoingProjects
- 23
- undatedCompletedProjectsExcluded
- 7
- Termination rate
Component score: 100/100 · Weight: 21%
- totalProjects
- 123
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 21%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 123
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
Component score: 99/100 · Weight: 11%
- projects
- 123
- componentScore
- 99
- flagsPerProject
- 0.03
- publishedV2Flags
- 4
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 123
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 49 of 118 geotagged projects (largest by contract value) — Open full map · Download projects (CSV)
- OO2-PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION/REHABILITATION OF NASISI RIVER FLOOD MITIGATION STRUCTURE(BRGY. CAVASI AND BRGY. TOMOL22F00024 · ₱192,895,677.60 · mapped
- OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS:CONST./IMPV'T. OF CADAC-AN RIVER FLOOD CONTROL SYSTEM,JUBAN, SORSOGON18F00002 · ₱185,232,256.17 · mapped
- Construction/Improvement/Rehabilitation of Cadac-an River Flood Mitigation Structure, Sta. 12+260 - Sta. 12+308 Right Side, Sta. 11+792 - Sta. 12+848 Left Side, Juban, Sorsogon22F00138 · ₱174,664,974.60 · mapped
- Construction/Improvement/Rehabilitation of Cadac-an River Flood Mitigation Structure, Sta. 23+752.00 - Sta. 24+575.57 Left Side, Sta. 23+806.50 - Sta. 24+357.50 Right Side, Irosin, Sorsogon22F00139 · ₱174,378,350.70 · mapped
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, NABONTON RIVER, LIGAO CITY, ALBAY25F00007 · ₱173,557,141.19 · mapped
- OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS:CONST.OF FLOOD MITIGATION STRUCTURES ALONG SAN AGUSTIN RIVER,LIBON AL18F00006 · ₱171,043,803.31 · mapped
- OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS,CONST./IMPV'T. OF PADANG RIVER FLOOD CONTROL SYSTEM,PADANG, LEGAZPI CITY, ALBAY 2ND LD18F00004 · ₱163,226,822.43 · mapped
- CLUSTER I:CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS-LIGAO-PIODURAN-DONSOL ROAD LEADING TO BUTANDING SITE, ALBAY AND CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES,18F00060 · ₱161,208,296.55 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS-CAMARINES SUR-ALBAY DIVERSION ROAD, PACKAGE 4, ALBAY, LIBON, ALBAY (3RD LEGISLATIVE DISTRICT)24F00101 · ₱151,117,745.87 · mapped
- CONSTRUCTION/IMPROVEMENT OF PADANG RIVER FLOOD CONTROL SYSTEM (COMPLETION OF GAPS), LEGAZPI CITY, ALBAY, ALBAY 2ND LEGISLATIVE DISTRICT18F00130 · ₱149,712,401.94 · mapped
- Construction/Improvement/Rehabilitation of Cadac-an River Flood Mitigation Structure, Juban, Sorsogon21F00008 · ₱144,750,000.00 · mapped
- Construction/Improvement/Rehabilitation of Cadac-an River Flood Mitigation Structure, Irosin, Sorsogon21F00008 · ₱144,750,000.00 · mapped
- Construction/Improvement of Kapantaran River Flood Mitigation Structures (Homapon - Imalnod Section), Legazpi City, Albay21F00005 · ₱144,750,000.00 · mapped
- OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEMS-CONSTRUCTION/IMPROVEMENT/REHABILITATION OF QUINALE B RIVER FLOOD MITIGATION STRUCTURE, MALINAO,21F00004 · ₱144,750,000.00 · mapped
- Construction/Improvement/Rehabilitation of Padang River Flood Mitigation Structure (Brgy. Buyuan and Brgy. Padang), Legazpi City, Albay21F00005 · ₱144,749,999.80 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF AMTIC-BALIGANG-TAMBO-MULADBUC22F00031 · ₱144,749,250.69 · mapped
- Construction of Quinale ''B'' River Flood Mitigation Structure, Malinao, Albay23F00003 · ₱144,748,972.10 · mapped
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BARANGAY SAN JOSE, GUINOBATAN, AL25F00005 · ₱142,939,617.74 · mapped
- ORGANIZATIONAL OUTCOME 2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, CABILOGAN RIVER, LIGAO CITY, ALBAY25F00006 · ₱141,985,772.78 · mapped
- SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF PAULBA - SAN PASCUAL - SAN MIGUEL - RAMAY ROAD WITH BRIDGE COMPONENT IN LIGAO CITY AND OAS, ALBAY23FO0074 · ₱139,982,481.29 · mapped
- OO2-PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF KAPANTARAN RIVER FLOOD MITIGATION STRUCTURE (HOMAPON-IMALNOD SECTION), LEGAZPI CITY22F00009 · ₱139,921,723.79 · mapped
- OO2-PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS:CONSTRUCTION AND IMPROVEMENT OF FLOOD CONTROL DIKES IN LIGAO CITY FOR CRITICAL SECTIONS OF BARANGAY18F00014 · ₱139,683,523.76 · mapped
- OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CLUSTER II-I-CONSTRUCTION/IMPROVEMENT/REHABILITATION OF CABILOGAN RIVER FLOOD MITIGATION STRUCTURE21F00002 · ₱134,988,726.81 · mapped
- OO2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS,CONSTRUCTION/IMPROVEMENT OF BULA RIVER CONTROL(SAN ROQUE-OMBAO SECTION),BULA,CAMARINES SUR 5TH LD18F00044 · ₱134,309,606.18 · mapped
- OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION/IMPROVEMENT OF TALISAY RIVER FLOOD CONTROL SYSTEM IN LIBON, ALBAY, LIBON, ALBAY 3RD L20F00040 · ₱127,149,360.74 · mapped
- Construction of Nabonton River Flood Mitigation Structure (Barangay Tomolin), Ligao City, Albay23F00006 · ₱125,406,649.00 · mapped
- Construction of Quinale A River Flood Mitigation Structure (Polangui and Libon Section), Polangui and Libon, Albay23F00029 · ₱125,336,435.00 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS-CAMARINES SUR-ALBAY DIVERSION ROAD, PACKAGE 1, ALBAY, GUINOBATAN, ALBAY(3RD LEGISLATIVE DISTRICT)23F00363 · ₱123,648,154.82 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS-PRESIDENT'S INFRASTRUCTURE FLAGSHIP PROGRAM-CAMARINES SUR-ALBAY DIVERSION ROAD(PACKAGE 3), ALBAY, LIGAO, ALBAY (3RD LEGISLATIVE DIST21F00110 · ₱122,555,000.00 · mapped
- Construction/Rehabilitation of Bonga Flood Control System, Legazpi City, Albay21F00011 · ₱115,800,000.00 · mapped
- OO2-PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION/IMPROVEMENT/REHABILITATION OF NASISI RIVER FLOOD CONTROL SYSTEM (BRGY. TOMOLIN, GUILID19F00005 · ₱115,800,000.00 · mapped
- OO2-PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION/IMPROVEMENT/REHABILITATION OF CADACAN RIVER FLOOD CONTROL SYSTEM, BRGY. GULANG-GULANG19F00019 · ₱115,799,785.46 · mapped
- OO2-PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION/IMPROVEMENT OF MATACON/BALANGIBANG FLOOD CONTROL STRUCTU19F00007 · ₱115,799,080.84 · mapped
- CONSTRUCTION OF SEAWALL SAN ISIDRO, MALILIPOT, ALBAY24FA0016 · ₱109,045,000.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF AMTIC-BALIGANG-TAMBO-MULADBUCA23F00047 · ₱106,149,838.93 · mapped
- OO2-PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION/IMPROVEMENT/REHABILITATION OF PADANG RIVER FLOOD CONTROL SYSTEM, LEGAZPI CITY, ALBAY,S19F00006 · ₱102,923,615.87 · mapped
- ROAD UPGRADING (UNPAVED TO PAVED)BASED ON GRAVEL ROAD STRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED ROAD STANDARDS(HDM-4 PROJECT ANALYSIS) ALBAY WEST COAST ROAD, KO533+488.00-KO533+588.28, KO538+483.30-KO538+830.00(WITH EXCEPTION, CATBURAWAN BRIDGE16F00064 · ₱102,350,326.45 · mapped
- Rehabilitation/ Improvement of Revetment along Quinale River, Downstream of Comun Bridge, Left Side, Brgy. Comun-Ogob, Malinao, Albay22F00102 · ₱101,325,000.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM-ROLL-IT)-BRGY. 3-BRGY. 4-BRGY. 5 ROAD CONNECTING LIG22F00029 · ₱101,324,934.45 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM-ROLL-IT)-BRGY.3-BRGY.2-BRGY.1 ROAD CONNECTING LIGAO-22F00028 · ₱101,324,921.75 · mapped
- OO2-PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION/REHABILITATION OF QUINALE B RIVER FLOOD MITIGATION STRUCTURE, MALINAO, ALBAY, MALINA22F00100 · ₱101,324,906.91 · mapped
- Rehabilitation of Revetment along Quinale River, Barangay Labnig-Tuliw, Malinao, Albay23F00004 · ₱101,324,366.00 · mapped
- Construction of Revetment along Quinale River, Downstream of Comun Bridge, Left Side, Barangay Ogob, Malinao, Albay23F00025 · ₱101,324,139.60 · mapped
- CONSTRUCTION OF 3 UNITS, 4-STOREY 16-CLASSROOM SCHOOL BUILDING AT POLANGUI GENERAL COMPREHENSIVE HIGH SCHOOL17FO0062 · ₱99,477,154.26
- CLUSTER 14- ROAD WIDENING-TERTIARY ROADS TO STO. DOMINGO-BUHATAN-CAGRARAY CIRCUMFERENTIAL RD.-K0566+000-K0567+000, BACACAY,ALBAY AND K0547+000-K0549+000, STO. DOMINGO,ALBAY20FA0025 · ₱97,902,000.00 · mapped
- CONSTRUCTION OF RIVER CONTROL, BARANGAY MALOLOS, MALINAO, ALBAY24FA0019 · ₱96,500,000.00 · mapped
- CONSTRUCTION OF RIVER CONTROL, BARANGAY LIBOD, MALINAO, ALBAY24FA0023 · ₱96,500,000.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP)-CONSTRUCTION_IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM-TRIP) DONSOL-PILAR-CASTILLA-SORSOGON CITY (DONPICASO) TOURISM HIGHWAY, SORSOGON, PACKAGE22FK0066 · ₱96,499,951.45 · mapped
- CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - DARAGA-PILAR DIVERSION ROAD (AIRPORT ACCESS), ALBAY22FB0012 · ₱96,499,946.10 · mapped
- FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-REHABILITATION OF SPILLWAY FACILITIES ALONG MANLATO RIVER, DONSOL, SORSOGON21FK0048 · ₱94,030,416.15 · mapped
Equipment & capacity
PCAB license
- License no.
- 30029
- Category
- AAA · Large B
- Minimum net worth for this category
- ₱180,000,000.00
- Allowable range of contract cost (ARCC)
- ₱450M or above (no published ceiling)
- License valid until
- Dec 7, 2027
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 30029); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
8 evaluations listed across 4 GPPB CPES releases; 7 site-visit ratings. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| Jul 26, 2025 | DPWH | ₱142,939,618.00 | On-going | 94.2% | — | 40th, p. 196 |
| Feb 15, 2025 | DPWH | ₱96,500,000.00 | On-going | 92.5% | — | 39th (rev), p. 132 |
| Jul 31, 2024 | DPWH | ₱145,828,584.00 | On-going | 90.2% | — | 38th, p. 152 |
| Jul 31, 2024 | DPWH (JV) | ₱109,045,000.00 | On-going | 94.7% | — | 38th, p. 152 |
| Jul 4, 2022 | PPA (JV) | ₱76,303,047.00 | Completed | — | — | 34th, p. 53 |
| Jun 30, 2022 | DPWH (JV) | ₱72,375,000.00 | On-going | 96.1% | — | 34th, p. 2 |
| Jun 30, 2022 | DPWH | ₱49,000,000.00 | On-going | 94.8% | — | 34th, p. 53 |
| Nov 8, 2019 | DPWH | ₱112,301,103.00 | On-going | 88.0% | — | 40th, p. 196 |
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
- DPWH Infrastructure: 146 awards · ₱10,406,629,047.44
- Province of Albay Infrastructure: 3 awards · ₱572,366,908.04
- Philippine Ports Authority Infrastructure: 6 awards · ₱366,961,247.22
- Province of Samar Infrastructure: 4 awards · ₱128,838,678.71
- DOTr Infrastructure: 3 awards · ₱35,631,474.84
- City of Ligao Infrastructure: 1 award · ₱2,390,400.00
- Philippine Rice Research Institute Infrastructure: 1 award · ₱1,163,629.64
- 25F00189
- 25F00007
- 25F00005
- 25F00006
- 25FO0005₱9,486,445.74· 2025-01-30· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - ALBAY 3RD DEO
- 24F00026
- Contract ID No. 24FA0023₱93,411,584.03· 2024-04-15· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - ALBAY 1ST DEO
- Contract ID No. 24FA0019₱93,411,963.19· 2024-04-04· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - ALBAY 1ST DEO
- Contract ID No. 24FA0016₱104,137,638.44· 2024-03-25· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - ALBAY 1ST DEO
- 24F00101
- 24FO0022₱54,941,996.96· 2024-02-27· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - ALBAY 3RD DEO
- Construction Projects
- 23F00046
- 23F00363
- Contract ID No. 23FA0054₱93,125,205.80· 2023-07-26· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - ALBAY 1ST DEO
- 23FO0074₱139,982,481.29· 2023-06-27· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - ALBAY 3RD DEO
- 23F00065
- 23F00047
- 23OD0182₱93,788,931.72· 2023-05-05· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (METRO MANILA 3RD ED
- 23F00008
- 23F00007
- 23F00029
- 23F00025
- 23F00006
- 23F00003
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →